Alma 1 Construction Inc.
- Based in
- Merced
- On San Francisco permits
- Aug 2020 to May 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2021 | Never finaled issued May 2021, no final | 463 Lombard St | 500 sq. ft. basement, demo all surfaces to subfloor/stud @ interior only, enlarge 1/2 bath to full bath, replace in-kind wet bar cabinets, provide new electrical plumbing systems, change 50 cfm bth fan to 80 cfm bth fan & ensure termination to exterior, min 3'to pl. no exterior/structural workDetails
500 sq. ft. basement, demo all surfaces to subfloor/stud @ interior only, enlarge 1/2 bath to full bath, replace in-kind wet bar cabinets, provide new electrical plumbing systems, change 50 cfm bth fan to 80 cfm bth fan & ensure termination to exterior, min 3'to pl. no exterior/structural work | $16,000 |
| Jan 11, 2021 | Never finaled issued Jan 2021, no final | 118 Eureka St | remodel/clean up existing 1st fl space, work includes drywall, replace existing floor, elec wiring, plumbing clean up, repair and paint. no walls added or movedDetails
remodel/clean up existing 1st fl space, work includes drywall, replace existing floor, elec wiring, plumbing clean up, repair and paint. no walls added or moved | $10,000 |
| Aug 5, 2020 | Completed final sign-off Nov 2020 | 118 Eureka St | remodel half bathroom to add shower in the space, including adding a wall, keeping a door, & moving plumbing & electrical contacts. no load bearing wals impacted.Details
remodel half bathroom to add shower in the space, including adding a wall, keeping a door, & moving plumbing & electrical contacts. no load bearing wals impacted. | $22,000 |