Allstar Construction Innovations Llc
- Based in
- Redwood City
- On San Francisco permits
- Jul 2022 to Feb 2026
- Last 24 months
- 1 permit filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2026 | In progress issued Apr 2026 | 95 Santa Paula Av | interior remodel with new kitchen, 2 new bathrooms, replace windows/doors in-kind per st. francis wood hoa guidelines/approval letter. convert 583 sf of (e) space to an adu per ca state program. note: electrical permit to upgrade pg&e service & panel, add recessed lights, ground outlets is opened.Details
interior remodel with new kitchen, 2 new bathrooms, replace windows/doors in-kind per st. francis wood hoa guidelines/approval letter. convert 583 sf of (e) space to an adu per ca state program. note: electrical permit to upgrade pg&e service & panel, add recessed lights, ground outlets is opened. | $147,000 |
| Aug 26, 2024 | Completed final sign-off Nov 2024 | 201 Laguna St | bathroom remodel like for like: electrical and plumbing as needed. no moving walls. no layout changes. replace: tiles, vanity, toilet. convert tub to standing shower with same footprint.Details
bathroom remodel like for like: electrical and plumbing as needed. no moving walls. no layout changes. replace: tiles, vanity, toilet. convert tub to standing shower with same footprint. | $29,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2023 | 266 22nd Av | like for like bathroom remodel (tub> standing shower). no removal of wallsDetails
like for like bathroom remodel (tub> standing shower). no removal of walls | $20,000 |
| Jan 4, 2023 | Completed final sign-off Jan 2023 | 742 30th Av | like for like garage door replacement w/ minimum 200 square mch ventsDetails
like for like garage door replacement w/ minimum 200 square mch vents | $6,000 |
| Jul 19, 2022 | Completed final sign-off Dec 2022 | 2035 Pine St | like for like bathroom remodelDetails
like for like bathroom remodel | $17,000 |