Permit GraphShortlistSan Francisco building permits since 2000

Allround Construction

Contractor license
741191
State license record
Based in
San Francisco
On San Francisco permits
May 2010 to Jun 2017
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllDeck 2Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Jun 27, 2017Completed
final sign-off Jul 2017
76 Eureka Stremove and replace trim at front posts and upper deck with in-kind materials. work includes removing trim cladding and decking to treat structural (fungus, pest, etc.) and re-install with same materials. no other work proposed. attached is jan 2017 image of facade for reference. reviewed with m. cor
Details
Permit
201706270431
Status
complete
Filed
Jun 27, 2017
Permit issued
Jun 27, 2017
Final sign-off
Jul 7, 2017
Declared cost
$5,600
Address
76 Eureka St

remove and replace trim at front posts and upper deck with in-kind materials. work includes removing trim cladding and decking to treat structural (fungus, pest, etc.) and re-install with same materials. no other work proposed. attached is jan 2017 image of facade for reference. reviewed with m. cor

Open the permit page

$5,600
May 21, 2010Completed
final sign-off Aug 2011
279 Topaz Wynew deck cantilevered 4' @ 2nd floor on (e) rear facade, accessed by sliding glass door. replacing windows 1 @ 2nd floor, 2 @ 1st floor. new bath & storage @ (e) 1st floor.
Details
Permit
201005212987
Status
complete
Filed
May 21, 2010
Permit issued
Dec 6, 2010
Final sign-off
Aug 31, 2011
Declared cost
$25,000
Address
279 Topaz Wy

new deck cantilevered 4' @ 2nd floor on (e) rear facade, accessed by sliding glass door. replacing windows 1 @ 2nd floor, 2 @ 1st floor. new bath & storage @ (e) 1st floor.

Open the permit page

$25,000