Alliance Custom Builders Inc
- Based in
- Novato
- On San Francisco permits
- Jun 2003 to Dec 2019
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2019 | Completed final sign-off Apr 2020 | 33 Heather Av | remodel (e) lower floor family room, wetbar, closet, bath & storage room. install gas fireplace insert units @ 2 existing fireplacesDetails
remodel (e) lower floor family room, wetbar, closet, bath & storage room. install gas fireplace insert units @ 2 existing fireplaces | $48,000 |
| Jul 10, 2017 | Completed final sign-off Sep 2017 | 3580 Washington St | install (n) copper roof ledge flashing and repair related areas, replace comp. roofing on 4 dormers, no change to roof form.Details
install (n) copper roof ledge flashing and repair related areas, replace comp. roofing on 4 dormers, no change to roof form. | $50,000 |
| Jun 12, 2008 | Completed final sign-off Dec 2008 | 33 Heather Av | kitchen remodel, new flooring cabs, counters, appliances no structural 50% of wattage of new lighting to be fluorescent.Details
kitchen remodel, new flooring cabs, counters, appliances no structural 50% of wattage of new lighting to be fluorescent. | $75,000 |
| Mar 7, 2008 | Completed final sign-off Nov 2008 | 3580 Washington St | rear deck repair, replace stairs in kind except for modified configuration at lower portion of stair; balance of existing rear deck stair replace in kind. modify structural framing of rear deck, no change to overall configuration. replace existing stair to rear entry deck in kind. replace tile.Details
rear deck repair, replace stairs in kind except for modified configuration at lower portion of stair; balance of existing rear deck stair replace in kind. modify structural framing of rear deck, no change to overall configuration. replace existing stair to rear entry deck in kind. replace tile. | $125,000 |
| May 23, 2006 | Completed final sign-off Oct 2006 | 2949 Lake St | replace fixtures and finishes in master bath, replace 1 window at front min. u factor o.67Details
replace fixtures and finishes in master bath, replace 1 window at front min. u factor o.67 | $40,000 |
| Mar 9, 2005 | Completed final sign-off Aug 2005 | 33 Heather Av | remodel (2) bathrooms: replace finishes, plumbing & elec. fixtures.Details
remodel (2) bathrooms: replace finishes, plumbing & elec. fixtures. | $24,000 |
| Apr 5, 2004 | Completed final sign-off Oct 2004 | 2945 Lake St | remodel of 24 sqft power bath. no exterior changesDetails
remodel of 24 sqft power bath. no exterior changes | $12,000 |
| Jun 16, 2003 | Completed final sign-off Oct 2003 | 3580 Washington St | remodel 2 existing 4th flr bathroomsDetails
remodel 2 existing 4th flr bathrooms | $55,000 |