Alli Construction Inc
- Based in
- Sacramento
- On San Francisco permits
- Aug 2012 to Sep 2019
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2019 | Completed final sign-off Jan 2021 | 269 Avila St | revision to 201805240036 revise layout of proposed dwelling unit to eliminate separation btw sleeping & living rm. revise bath layout, laundry/closet layout & bike parking location and patio doors unit aDetails
revision to 201805240036 revise layout of proposed dwelling unit to eliminate separation btw sleeping & living rm. revise bath layout, laundry/closet layout & bike parking location and patio doors unit a | |
| Mar 22, 2019 | Completed final sign-off Jan 2021 | 269 Avila St | seismic strengthening in accordance with sf existing building code 407.4.1 and 301.2 ref 201805240036Details
seismic strengthening in accordance with sf existing building code 407.4.1 and 301.2 ref 201805240036 | $40,000 |
| May 24, 2018 | Completed final sign-off Jan 2021 | 269 Avila St | addition of accesory dwelling unit per ordinance 162-16. **maher n/a**Details
addition of accesory dwelling unit per ordinance 162-16. **maher n/a** | $78,000 |
| Mar 2, 2018 | Completed final sign-off May 2018 | 269 Avila St | comply with nov complaint #201721221; remove unpermitted bathroom at ground floor,recently constructed, remove heat source, revert 2 rooms back to storage per plan.Details
comply with nov complaint #201721221; remove unpermitted bathroom at ground floor,recently constructed, remove heat source, revert 2 rooms back to storage per plan. | $1,000 |
| Jan 17, 2018 | Expired or cancelled withdrawn Mar 2018 | 269 Avila St | removal of non-load bearing walls. install nw non-load bearing walls. install nw cabinets, nw flooring, partial drywall & paint, & nw plumbing fixtures.Details
removal of non-load bearing walls. install nw non-load bearing walls. install nw cabinets, nw flooring, partial drywall & paint, & nw plumbing fixtures. | $30,000 |
| Nov 29, 2017 | Completed final sign-off Jun 2018 | 269 Avila St | 3rd fl - remove non-bearing wall and add new walls. maher n/aDetails
3rd fl - remove non-bearing wall and add new walls. maher n/a | $20,000 |
| Jun 30, 2017 | Completed final sign-off Jun 2018 | 269 Avila St | remodel kitchens both units , baths, living rms. drywall patches as needed, cabinets, lighting,r&r all appliances,floor, tile, door hardware, baseboard, paintDetails
remodel kitchens both units , baths, living rms. drywall patches as needed, cabinets, lighting,r&r all appliances,floor, tile, door hardware, baseboard, paint | $300,000 |
| Aug 22, 2012 | Completed final sign-off Nov 2012 | 301 Mission St | 50th floor, unit 50a: ti of (e) unit including dropped ceiling in living & study room. changes to non-structural partitions, lighting & power. no structural work. no additions or alterations to common area or bldg envelope.Details
50th floor, unit 50a: ti of (e) unit including dropped ceiling in living & study room. changes to non-structural partitions, lighting & power. no structural work. no additions or alterations to common area or bldg envelope. | $30,000 |