All Bay Cities Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Apr 2026
- Last 24 months
- 5 permits filed
87 permits since 2000: 73 completed, 1 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2026 | Completed final sign-off Sep 2026 | 1845 Irving St | deferred mechanical for pa# 2026032246368: new mechanical system, new lighting, new plumbing for new restroom and water heater.Details
deferred mechanical for pa# 2026032246368: new mechanical system, new lighting, new plumbing for new restroom and water heater. | $20,000 |
| Feb 24, 2026 | Completed final sign-off Sep 2026 | 1845 Irving St | 1)change of occupancy and change of use from group m (retail) to group a-3 (indoor play ground). 2) new ada restroom. 3) convert existing non ada restroom into janitor rm. 4) new play structures, child fence, counter. 5) relocated door operators. deferred submittals, new mechanical system.Details
1)change of occupancy and change of use from group m (retail) to group a-3 (indoor play ground). 2) new ada restroom. 3) convert existing non ada restroom into janitor rm. 4) new play structures, child fence, counter. 5) relocated door operators. deferred submittals, new mechanical system. | $55,000 |
| Apr 24, 2025 | Completed final sign-off Jun 2025 | 5020 California St | unit #5: replace 8 windows in kind. 4 at front, 4 at rear. vinylDetails
unit #5: replace 8 windows in kind. 4 at front, 4 at rear. vinyl | $2,000 |
| Jan 31, 2025 | Completed final sign-off Jun 2025 | 5020 California St | unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior workDetails
unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior work | $50,000 |
| Nov 18, 2024 | Completed final sign-off Jan 2025 | 837 33rd Av | adding new siding to (e) wood siding. install building paper to protect against water leak use bilt woven house wrap. remove and install all windows & door trim. install eave flashing on top of the siding for leak protection. paint all new siding.Details
adding new siding to (e) wood siding. install building paper to protect against water leak use bilt woven house wrap. remove and install all windows & door trim. install eave flashing on top of the siding for leak protection. paint all new siding. | $22,500 |
| Sep 13, 2023 | In progress issued Nov 2024 | 62 Tingley St | legalize 1st flr unit per state adu program. replace existing front windows in kind. to comply with nov no. 202309442. (single family + adu)Details
legalize 1st flr unit per state adu program. replace existing front windows in kind. to comply with nov no. 202309442. (single family + adu) | $100,000 |
| Aug 18, 2023 | Completed final sign-off Jun 2024 | 515 Columbus Av | renewal pa# 2017-0510-6224 to complete work.Details
renewal pa# 2017-0510-6224 to complete work. | |
| Aug 18, 2023 | Completed final sign-off Apr 2024 | 515 Columbus Av | to obtain final inspection for work approved under pa# 2017-0906-7044. all work is complete.Details
to obtain final inspection for work approved under pa# 2017-0906-7044. all work is complete. | |
| Jun 5, 2023 | Completed final sign-off Jul 2023 | 519 Columbus Av | recommencment and completion of work approved under pa# 201712186734Details
recommencment and completion of work approved under pa# 201712186734 | $40,000 |
| Jun 23, 2022 | Completed final sign-off May 2023 | 537 Columbus Av | barrier removal (interior): voluntary relocate restroom to comply with ada requirement. vacant unit.Details
barrier removal (interior): voluntary relocate restroom to comply with ada requirement. vacant unit. | $4,000 |
| Apr 26, 2022 | Never finaled issued Apr 2022, no final | 53 Lupine Av | to comply with complaints 202289785 and 202289788: remove/install new furnace heating unit with about 10 ft of duct. same location (replacement).Details
to comply with complaints 202289785 and 202289788: remove/install new furnace heating unit with about 10 ft of duct. same location (replacement). | $4,000 |
| Mar 28, 2022 | Expired or cancelled withdrawn Apr 2022 | 254 Laguna Honda Bl | re-do wheelchair ramp, about 100'.Details
re-do wheelchair ramp, about 100'. | $18,000 |
| Mar 25, 2022 | Completed final sign-off Aug 2022 | 1250 Clay St | revision to permit #202201266671. location of range hood will not move(stay the same). no bathroom fan. ste 303Details
revision to permit #202201266671. location of range hood will not move(stay the same). no bathroom fan. ste 303 | $35,000 |
| Feb 18, 2022 | Completed final sign-off May 2022 | 254 Laguna Honda Bl | revision to 202105039710 and 202108065976 to update path of travel. no change to path of travel of exitingDetails
revision to 202105039710 and 202108065976 to update path of travel. no change to path of travel of exiting | $20,000 |
| Feb 15, 2022 | Never finaled issued Mar 2022, no final | 355 01st St | unit # 309: remodel (e) 2 bathroom (no layout change), replace vanities & water closets. replace tiles in shower & bathtub area. replace baths & hallway floor tiles. add 1 gfci receptacle in master bathroom.Details
unit # 309: remodel (e) 2 bathroom (no layout change), replace vanities & water closets. replace tiles in shower & bathtub area. replace baths & hallway floor tiles. add 1 gfci receptacle in master bathroom. | $20,000 |
| Jan 26, 2022 | Completed final sign-off Aug 2022 | 1250 Clay St | like for like 1 kitchen remodel: like kind 1 bathroom remodel: install laminate floors, add 10 recessed light, move location of range hood, install bathroom fan.Details
like for like 1 kitchen remodel: like kind 1 bathroom remodel: install laminate floors, add 10 recessed light, move location of range hood, install bathroom fan. | $35,000 |
| Jan 21, 2022 | Completed final sign-off Oct 2022 | 1524 Palou Av | revision to bpa 202110281404. convert media room to kitchenette. re-build front stairway. add window and entry at front of 1/f.Details
revision to bpa 202110281404. convert media room to kitchenette. re-build front stairway. add window and entry at front of 1/f. | $23,000 |
| Oct 28, 2021 | Completed final sign-off Oct 2022 | 1524 Palou Av | 1/f: add media room, bathroom, office & family, & laundry room.Details
1/f: add media room, bathroom, office & family, & laundry room. | $45,000 |
| Sep 28, 2021 | Completed final sign-off Apr 2022 | 1809 Union St | revision to pa 2021 0623 3084. revise "clean area" layoutDetails
revision to pa 2021 0623 3084. revise "clean area" layout | |
| Sep 2, 2021 | Completed final sign-off Nov 2021 | 527 Columbus Av | recommencement & completion of work approved under bpa#201712186736Details
recommencement & completion of work approved under bpa#201712186736 | |
| Aug 6, 2021 | Completed final sign-off Aug 2021 | 521 Columbus Av | commencement of work not started under previously approved permit application #201704275073.Details
commencement of work not started under previously approved permit application #201704275073. | |
| Aug 6, 2021 | Completed final sign-off May 2022 | 254 Laguna Honda Bl | rev to pa202105039710: new fence at (e) exterior deck. no change to occupancy, exiting and accessibility path of travel.Details
rev to pa202105039710: new fence at (e) exterior deck. no change to occupancy, exiting and accessibility path of travel. | $3,000 |
| Jun 23, 2021 | Completed final sign-off Apr 2022 | 1809 Union St | new restaurant d.b.a dumpling union. work include new all gender restroom, stair and kitchen equipment.Details
new restaurant d.b.a dumpling union. work include new all gender restroom, stair and kitchen equipment. | $150,000 |
| Jun 4, 2021 | Completed final sign-off Sep 2022 | 461 02nd St | unit #c105: one in-kind kitchen and one bathroom remodel. non-structural workDetails
unit #c105: one in-kind kitchen and one bathroom remodel. non-structural work | $20,000 |
| May 3, 2021 | Completed final sign-off May 2022 | 254 Laguna Honda Bl | change of use: tenant improvement of existing ground floor tenant space for a new childcare facility. scope of work includes a new ada restrooms and new exterior exit doors.Details
change of use: tenant improvement of existing ground floor tenant space for a new childcare facility. scope of work includes a new ada restrooms and new exterior exit doors. | $50,000 |
| Jan 30, 2020 | Completed final sign-off Jan 2024 | 55 Lupine Av | per adu ordinance# 162-16, add 1 new studio unit on (e) conditional space.Details
per adu ordinance# 162-16, add 1 new studio unit on (e) conditional space. | $26,876 |
| Sep 5, 2019 | Completed final sign-off Aug 2021 | 515 Columbus Av | comply with planning case 2019005438enf. restoration of historic storefront at 515-527 columbus including installation of a storefront system, wood framed doors and transoms, tiled bulkheads, tiled entryway, floorinh and installtion of ada push buttons.Details
comply with planning case 2019005438enf. restoration of historic storefront at 515-527 columbus including installation of a storefront system, wood framed doors and transoms, tiled bulkheads, tiled entryway, floorinh and installtion of ada push buttons. | $30,000 |
| Oct 3, 2018 | Expired or cancelled withdrawn Nov 2018 | 1250 Jones St | 11th fl: remodel kitchen, bathroom, add sink in powder room, add washer/dryer, add den.Details
11th fl: remodel kitchen, bathroom, add sink in powder room, add washer/dryer, add den. | $60,000 |
| May 22, 2018 | Completed final sign-off May 2021 | 265 Flournoy St | rear yard addition. remodel kitchen, bathrooms, floor finish, rear yard addition 2-story (270x2=540 sf) 2 bed/2 bath. expand kitchen with addition of 50 sf, new spiral stairs to ground floor. ground floor with (1) bed & (1) bath, family room. upstairs office 50 sf addition.Details
rear yard addition. remodel kitchen, bathrooms, floor finish, rear yard addition 2-story (270x2=540 sf) 2 bed/2 bath. expand kitchen with addition of 50 sf, new spiral stairs to ground floor. ground floor with (1) bed & (1) bath, family room. upstairs office 50 sf addition. | $105,000 |
| Mar 13, 2018 | Completed final sign-off Jan 2019 | 3075 25th Av | convert (e) garage space to have a (n) adu w/ 2 bedrms. 2 full bathes, a kitchen and living/dining area. per ord# 95-17.Details
convert (e) garage space to have a (n) adu w/ 2 bedrms. 2 full bathes, a kitchen and living/dining area. per ord# 95-17. | $38,000 |
| Mar 9, 2018 | Completed final sign-off Jun 2018 | 3075 25th Av | 2nd fl: remodel (e) kitchen and bathroom. add one full bath.Details
2nd fl: remodel (e) kitchen and bathroom. add one full bath. | $20,000 |
| Mar 8, 2018 | Never finaled issued May 2018, no final | 501 Columbus Av | ada restroom per seismic retrofit for soft story retrofit per 2016 cebc appendix a-4 related to app#201802222022 (commercial) sof story program; n/a maherDetails
ada restroom per seismic retrofit for soft story retrofit per 2016 cebc appendix a-4 related to app#201802222022 (commercial) sof story program; n/a maher | $118,000 |
| Feb 22, 2018 | Never finaled issued May 2018, no final | 501 Columbus Av | seismic retrofit per mandatory soft story per sfebc chapter 4d 2016 cebc app a-4. (residential) maher n/aDetails
seismic retrofit per mandatory soft story per sfebc chapter 4d 2016 cebc app a-4. (residential) maher n/a | $200,000 |
| Dec 18, 2017 | Completed final sign-off Nov 2021 | 527 Columbus Av | 1) commercial t.i. to comply with complaint #201630151 ada accessible entrance. ada restroom. n/a for maherDetails
1) commercial t.i. to comply with complaint #201630151 ada accessible entrance. ada restroom. n/a for maher | $90,000 |
| Dec 18, 2017 | Expired or cancelled expired Jul 2023 | 519 Columbus Av | commercial t.i. for ada accessible entrance. n/a for maherDetails
commercial t.i. for ada accessible entrance. n/a for maher | $90,000 |
| Dec 11, 2017 | Completed final sign-off Feb 2018 | 88 King St | remodel bathroom, same location, no moving of walls, doors or windows, maintain accessible heights & clearances if it is an accessible unit; maher ord 155=13 na.Details
remodel bathroom, same location, no moving of walls, doors or windows, maintain accessible heights & clearances if it is an accessible unit; maher ord 155=13 na. | $8,000 |
| Sep 6, 2017 | Expired or cancelled expired Apr 2024 | 515 Columbus Av | install slab and replace foundation per plan and repair dry rot where occurs. to comply with complaint #201790541Details
install slab and replace foundation per plan and repair dry rot where occurs. to comply with complaint #201790541 | $20,000 |
| Aug 16, 2017 | Completed final sign-off Dec 2017 | 2575 39th Av | 2/f: remodel bathroom.Details
2/f: remodel bathroom. | $8,500 |
| Aug 7, 2017 | Completed final sign-off Apr 2019 | 2215 19th Av | revision to pa#201701127062. reconfigure layout per plans.Details
revision to pa#201701127062. reconfigure layout per plans. | |
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 88 King St | unit #302 - remodel a bathroom.Details
unit #302 - remodel a bathroom. | $8,000 |
| Jul 7, 2017 | Completed final sign-off Nov 2017 | 1903 09th Av | replace about 200 l.f. of wood siding in lightwell, not visible from street.Details
replace about 200 l.f. of wood siding in lightwell, not visible from street. | $4,000 |
| May 10, 2017 | Never finaled issued May 2017, no final | 515 Columbus Av | barrier removal, upgrade e toilet, entry doors only, auto door opener bar is installed against the exterior wallDetails
barrier removal, upgrade e toilet, entry doors only, auto door opener bar is installed against the exterior wall | $15,000 |
| May 9, 2017 | Completed final sign-off Apr 2019 | 2215 19th Av | revision to app#201701127062 to replace foundation at rear bedroom.Details
revision to app#201701127062 to replace foundation at rear bedroom. | $500 |
| Apr 27, 2017 | Completed final sign-off Aug 2021 | 521 Columbus Av | tenant improvement: construct new ada restroom at ground floor. reconfigure extg storefront at ground floor. n/a for maherDetails
tenant improvement: construct new ada restroom at ground floor. reconfigure extg storefront at ground floor. n/a for maher | $20,000 |
| Feb 1, 2017 | Completed final sign-off Apr 2017 | 1776 Sacramento St | remodel 2 bathrooms, no change on walls.Details
remodel 2 bathrooms, no change on walls. | $10,000 |
| Oct 31, 2016 | Completed final sign-off Dec 2016 | 950 Stockton St | close opening with interior non load bearing partition. new accessible door at restroom and replace entry door hardware. mep, ls under separate permit.Details
close opening with interior non load bearing partition. new accessible door at restroom and replace entry door hardware. mep, ls under separate permit. | $2,500 |
| Oct 11, 2016 | Completed final sign-off Jan 2017 | 1601 Irving St | g/f shop -barrier removal only. upgrade existing restroom to meet current accessibility requirement with restroom expansionDetails
g/f shop -barrier removal only. upgrade existing restroom to meet current accessibility requirement with restroom expansion | $25,000 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 151 Middlefield Dr | to comply with nov#201637432- add 1/4 to 1/2" sand topping in (e) concrete walkway & driveway, add crub to property line. change 2 garage doors.Details
to comply with nov#201637432- add 1/4 to 1/2" sand topping in (e) concrete walkway & driveway, add crub to property line. change 2 garage doors. | $5,000 |
| May 5, 2016 | Completed final sign-off Dec 2016 | 263 Vernon St | revision to pa #201511243490 - extend basement floor pusing back retaining wall, new beam at ground floor. addition of 130 sf habitable area at basement.Details
revision to pa #201511243490 - extend basement floor pusing back retaining wall, new beam at ground floor. addition of 130 sf habitable area at basement. | $5,000 |
| Mar 11, 2016 | Completed final sign-off Apr 2016 | 2801 Sacramento St | unit #3: upgrade kitchen, counter top,sink,change one bath tub, 1 sink , no change existing appliances.Details
unit #3: upgrade kitchen, counter top,sink,change one bath tub, 1 sink , no change existing appliances. | $20,000 |
| Nov 24, 2015 | Completed final sign-off Dec 2016 | 263 Vernon St | remodel upper stair kitchen/bathroom. add one bath on 2nd floor. garage level convert into 2 bedrooms, one bath, and 1 car parking. basement cellars convert into 2 beds and one bath.Details
remodel upper stair kitchen/bathroom. add one bath on 2nd floor. garage level convert into 2 bedrooms, one bath, and 1 car parking. basement cellars convert into 2 beds and one bath. | $100,000 |
| Jun 30, 2015 | Completed final sign-off Dec 2015 | 300 03rd St | unit #318: remodel extg kitchen, bathrooms only. new floor finishes. n/a for maherDetails
unit #318: remodel extg kitchen, bathrooms only. new floor finishes. n/a for maher | $25,000 |
| Dec 9, 2014 | Completed final sign-off Apr 2015 | 693 10th Av | change front 1 windodow to wood clad aluminum or wood, double or single hung on second floor. u factor 0.32 max. revision to pa# 201409025218 to remodel bathroo also.Details
change front 1 windodow to wood clad aluminum or wood, double or single hung on second floor. u factor 0.32 max. revision to pa# 201409025218 to remodel bathroo also. | $500 |
| Oct 30, 2014 | Completed final sign-off May 2015 | 2779 38th Av | in 1st flr: convert (e) rooms to have two bedrooms, one full bath, laundry areaDetails
in 1st flr: convert (e) rooms to have two bedrooms, one full bath, laundry area | $45,000 |
| Sep 2, 2014 | Completed final sign-off May 2015 | 693 10th Av | remodel existing kitchen and upgrade electrical panelDetails
remodel existing kitchen and upgrade electrical panel | $9,000 |
| Dec 27, 2013 | Completed final sign-off Jul 2014 | 708 Plymouth Av | add 1 new bathroom. family room and bedroom at gr fl per planDetails
add 1 new bathroom. family room and bedroom at gr fl per plan | $30,000 |
| Oct 1, 2013 | Completed final sign-off Feb 2014 | 1687 23rd Av | recise application # 201308194618 to increase construciton cost per building inspector.Details
recise application # 201308194618 to increase construciton cost per building inspector. | $30,000 |
| Aug 19, 2013 | Completed final sign-off Feb 2014 | 1687 23rd Av | relocate kitchen & convert (e) kitchen into (n) study/office room at 2nd floor. legalize one bedroom, & (e) bathroom, construct one new bedroom, one bathroom & infill under (e) sunroom at ground floor.Details
relocate kitchen & convert (e) kitchen into (n) study/office room at 2nd floor. legalize one bedroom, & (e) bathroom, construct one new bedroom, one bathroom & infill under (e) sunroom at ground floor. | $68,000 |
| Jul 22, 2013 | Completed final sign-off Jan 2014 | 1849 23rd Av | to add a family room, a full bath, laundry room for sfd ue only.Details
to add a family room, a full bath, laundry room for sfd ue only. | $35,000 |
| Sep 26, 2012 | Completed final sign-off Nov 2012 | 500 Paul Av | roof repair.Details
roof repair. | $2,000 |
| Apr 26, 2012 | Completed final sign-off Aug 2012 | 642 30th Av | replace front stuccoDetails
replace front stucco | $5,000 |
| Mar 16, 2012 | Completed final sign-off Jun 2012 | 2463 37th Av | to legalize extg guest bedroom, family room and 2 baths at ground floor.Details
to legalize extg guest bedroom, family room and 2 baths at ground floor. | $38,000 |
| Jan 4, 2011 | Completed final sign-off Feb 2011 | 78 Division St | reference 201002096205. revised ceiling plan for storage room.Details
reference 201002096205. revised ceiling plan for storage room. | |
| Oct 27, 2010 | Completed final sign-off Dec 2010 | 3632 Ulloa St | remodel kitchen on 2nd flr only, non structural lighting to comply with cec 150(k)Details
remodel kitchen on 2nd flr only, non structural lighting to comply with cec 150(k) | $10,000 |
| Feb 9, 2010 | Completed final sign-off Feb 2011 | 78 Division St | minor remodel of (e) showroom; (n) ceiling & lighting, (n) ceiling height, non-bearing partitions & new finish materials.Details
minor remodel of (e) showroom; (n) ceiling & lighting, (n) ceiling height, non-bearing partitions & new finish materials. | $32,000 |
| Oct 29, 2009 | Expired or cancelled expired Dec 2009 | 680 Clay St | to obtain final inspection for work approved under pa3200809232348. all work is complete.Details
to obtain final inspection for work approved under pa3200809232348. all work is complete. | |
| Oct 22, 2009 | Completed final sign-off Jul 2010 | 432 30th St | enclose existing balcony on 2nd floor in front of building.Details
enclose existing balcony on 2nd floor in front of building. | $20,000 |
| Jul 15, 2009 | Completed final sign-off Sep 2009 | 2820 Kirkham St | remodel kitchen , no lighting change, change panel to 100a.Details
remodel kitchen , no lighting change, change panel to 100a. | $10,000 |
| May 13, 2009 | Completed final sign-off Jun 2009 | 1629 Jackson St | replace 1 wood post and provide new footing within ground floor commercial spaceDetails
replace 1 wood post and provide new footing within ground floor commercial space | $1,800 |
| Feb 12, 2009 | Completed final sign-off Feb 2009 | 2323 46th Av | to botain a permit of remodel kitchen from previous owner, per inspector's request.Details
to botain a permit of remodel kitchen from previous owner, per inspector's request. | $12,000 |
| Oct 16, 2008 | Completed final sign-off Feb 2009 | 2323 46th Av | interior remodeling . add bath room to ground floor. remodel family room on ground floor and remove interior stair. 2nd floor add a new bath . to legalize ground floorDetails
interior remodeling . add bath room to ground floor. remodel family room on ground floor and remove interior stair. 2nd floor add a new bath . to legalize ground floor | $19,000 |
| Sep 23, 2008 | Expired or cancelled expired Dec 2009 | 680 Clay St | remove cap shower, washer, dryer in basement. to comply w/nov#200860751.Details
remove cap shower, washer, dryer in basement. to comply w/nov#200860751. | $800 |
| May 2, 2008 | Completed final sign-off Feb 2009 | 28 02nd St | change of use from retail to restaurant on 1st floor - interior remodel for self serve, 2 new d.a. accessible restrooms, new corridor, new stair. replace glazing at existing storefront. occupant load verification.Details
change of use from retail to restaurant on 1st floor - interior remodel for self serve, 2 new d.a. accessible restrooms, new corridor, new stair. replace glazing at existing storefront. occupant load verification. | $195,000 |
| Dec 28, 2007 | Completed final sign-off Jun 2008 | 343 Wheeler Av | remodel (e) kitchen & bathroom. tile floor on bathroom kitchen. new cabinet & counter top with back flashing. new plumbing fixture.Details
remodel (e) kitchen & bathroom. tile floor on bathroom kitchen. new cabinet & counter top with back flashing. new plumbing fixture. | $14,500 |
| Sep 11, 2007 | Completed final sign-off Jan 2008 | 40 Gellert Dr | add full bath @ ground floor.Details
add full bath @ ground floor. | $6,000 |
| Aug 14, 2007 | Completed final sign-off Aug 2007 | 2022 31st Av | repair front wall dry rot between 2 windows about 100 sq.ft. remove stucco, do repairs and re-stuccoDetails
repair front wall dry rot between 2 windows about 100 sq.ft. remove stucco, do repairs and re-stucco | $5,000 |
| May 29, 2007 | Completed final sign-off Sep 2007 | 522 22nd Av | to comply nov #200671972: to remove existing kitchen sink, cabinet in 1/f, turn existing space back to original space per appl#7800449, repair termit damage to existing exterior wood stair.Details
to comply nov #200671972: to remove existing kitchen sink, cabinet in 1/f, turn existing space back to original space per appl#7800449, repair termit damage to existing exterior wood stair. | $3,000 |
| Mar 22, 2007 | Completed final sign-off Aug 2007 | 2219 47th Av | interior renovation: to add a family room, a bath. remodel (e) bath, bedroom in lower (1st floor). repair (e) rear deck and stair. (horizontal addition)Details
interior renovation: to add a family room, a bath. remodel (e) bath, bedroom in lower (1st floor). repair (e) rear deck and stair. (horizontal addition) | $20,000 |
| Jan 26, 2007 | Completed final sign-off Feb 2007 | 300 Country Club Dr | dryrot replace at front door. approx. 20 sqft. replace in kind.Details
dryrot replace at front door. approx. 20 sqft. replace in kind. | $1,000 |
| Jan 10, 2007 | Completed final sign-off May 2007 | 220 San Benito Wy | renovate (e) kitchen and bathrooms only on 2nd floor.Details
renovate (e) kitchen and bathrooms only on 2nd floor. | $15,000 |
| Oct 30, 2006 | Completed final sign-off Mar 2007 | 300 Country Club Dr | to legalize bathroom in 1st floor for single family use onlyDetails
to legalize bathroom in 1st floor for single family use only | $6,000 |
| Aug 8, 2006 | Completed final sign-off Sep 2006 | 191 Evelyn Wy | remodel kitchen cabinets, 8 countertops. replace glazing for 4 existing windows in front buildings windows.Details
remodel kitchen cabinets, 8 countertops. replace glazing for 4 existing windows in front buildings windows. | $2,500 |
| Jul 31, 2006 | Completed final sign-off Sep 2006 | 191 Evelyn Wy | install (n) window, (n) glass door, (n) folding door, and (n) garage door - rev. to pa# 2006/05/15/1627Details
install (n) window, (n) glass door, (n) folding door, and (n) garage door - rev. to pa# 2006/05/15/1627 | $2,000 |
| Jul 24, 2006 | Completed final sign-off Sep 2006 | 191 Evelyn Wy | revision to appl#200605151627 legalize (e) rooms to living spacesDetails
revision to appl#200605151627 legalize (e) rooms to living spaces | $2,000 |
| May 15, 2006 | Completed final sign-off Sep 2006 | 191 Evelyn Wy | install 1 bedroom, 1 laundry room & 1 bathroom at garage floor. legalize storage rooms & 1 bathroom at garage floor. install 1 bathroom at 2nd floor.Details
install 1 bedroom, 1 laundry room & 1 bathroom at garage floor. legalize storage rooms & 1 bathroom at garage floor. install 1 bathroom at 2nd floor. | $25,000 |
| Aug 12, 2003 | Expired or cancelled expired Dec 2007 | 2120 Stockton St | change kchn cabinets only in #103Details
change kchn cabinets only in #103 | $800 |
| Oct 30, 2001 | Completed final sign-off Jan 2002 | 1259 Oak St | change bathroom tile floor. tub wallDetails
change bathroom tile floor. tub wall | $2,800 |