Permit GraphShortlistSan Francisco building permits since 2000

All Air Mechanical Contractors Inc.

Contractor license
851335
State license record
Based in
South San Francisco
On San Francisco permits
Mar 2006 to May 2026
Last 24 months
1 permit filed

21 permits since 2000: 10 completed, 2 in progress, 9 never finaled.

Of the 9 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 6 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 1
FiledOutcomeAddressWork described on the permitDeclared cost
May 8, 2026In progress
issued Aug 2026
1045 Sansome Stinstalling of new ductwork, air distribution, ervs fancoil units. modification and extension of existing fresh air. install new diffuser, grills linesets, thermostat & local controls. install outdoor condenser units. mech work for 202602236299
Details
Permit
202605080924
Status
issued
Filed
May 8, 2026
Permit issued
Aug 21, 2026
Declared cost
$80,000
Address
1045 Sansome St

installing of new ductwork, air distribution, ervs fancoil units. modification and extension of existing fresh air. install new diffuser, grills linesets, thermostat & local controls. install outdoor condenser units. mech work for 202602236299

Open the permit page

$80,000
Jun 21, 2024In progress
issued Jun 2024
350 Masonic Avremoval of (2) existing rtus and 7 split system. installation of (2) new rtus and 7 new split systems. same location. similiar weight.
Details
Permit
202406214983
Status
issued
Filed
Jun 21, 2024
Permit issued
Jun 21, 2024
Declared cost
$128,454
Address
350 Masonic Av

removal of (2) existing rtus and 7 split system. installation of (2) new rtus and 7 new split systems. same location. similiar weight.

Open the permit page

$128,454
Nov 15, 2023Completed
final sign-off Nov 2023
2001 09th Avuse extg duct to reconnect to floor.
Details
Permit
202311150828
Status
complete
Filed
Nov 15, 2023
Permit issued
Nov 15, 2023
Final sign-off
Nov 27, 2023
Declared cost
$23,500
Address
2001 09th Av

use extg duct to reconnect to floor.

Open the permit page

$23,500
Jan 18, 2022Completed
final sign-off May 2023
2898 Sloat Blreference bpa#202110059867. install (2) furnaces & duct work w/flue pipes.
Details
Permit
202201186096
Status
complete
Filed
Jan 18, 2022
Permit issued
Jan 18, 2022
Final sign-off
May 22, 2023
Declared cost
$37,000
Address
2898 Sloat Bl

reference bpa#202110059867. install (2) furnaces & duct work w/flue pipes.

Open the permit page

$37,000
Nov 17, 2021Never finaled
issued Nov 2021, no final
111 Rhode Island Stinstalling hvac system one fan coil 5 ton with condensor plus duct work. ref pa# 202106222957
Details
Permit
202111172589
Status
issued
Filed
Nov 17, 2021
Permit issued
Nov 19, 2021
Declared cost
$59,900
Address
111 Rhode Island St

installing hvac system one fan coil 5 ton with condensor plus duct work. ref pa# 202106222957

Open the permit page

$59,900
Oct 24, 2018Never finaled
issued Dec 2018, no final
450 10th Streplacement of 14 roof top ac units and 1 split system fan coil and cond. unit.
Details
Permit
201810243999
Status
issued
Filed
Oct 24, 2018
Permit issued
Dec 17, 2018
Declared cost
$79,800
Address
450 10th St

replacement of 14 roof top ac units and 1 split system fan coil and cond. unit.

Open the permit page

$79,800
Jun 25, 2018Never finaled
issued Sep 2018, no final
2548 Mission Stheating and cooling of ventilation work maher na
Details
Permit
201806252798
Status
issued
Filed
Jun 25, 2018
Permit issued
Sep 25, 2018
Declared cost
$154,000
Address
2548 Mission St

heating and cooling of ventilation work maher na

Open the permit page

$154,000
Jan 9, 2018Completed
final sign-off Mar 2018
520 Washington Stinstall (1) 4 ton capacity heat /cool unit fan coil at space and condenser at roof. 1 exhaust fan. ref pa #201710030175. maher na
Details
Permit
201801098210
Status
complete
Filed
Jan 9, 2018
Permit issued
Jan 9, 2018
Final sign-off
Mar 8, 2018
Declared cost
$14,800
Address
520 Washington St

install (1) 4 ton capacity heat /cool unit fan coil at space and condenser at roof. 1 exhaust fan. ref pa #201710030175. maher na

Open the permit page

$14,800
Apr 27, 2017Completed
final sign-off Aug 2017
344 Linden Stinstall core & shell hvac, rooftop gas/electric unit.
Details
Permit
201704275062
Status
complete
Filed
Apr 27, 2017
Permit issued
May 12, 2017
Final sign-off
Aug 1, 2017
Declared cost
$13,450
Address
344 Linden St

install core & shell hvac, rooftop gas/electric unit.

Open the permit page

$13,450
Mar 8, 2016Never finaled
issued Mar 2016, no final
995 Market Stinstall two new fsds on 11 and 12th floors and associated duct detectors and hvac duct work. ref. 2016-01-25-7867
Details
Permit
201603081423
Status
issued
Filed
Mar 8, 2016
Permit issued
Mar 16, 2016
Declared cost
$231,196
Address
995 Market St

install two new fsds on 11 and 12th floors and associated duct detectors and hvac duct work. ref. 2016-01-25-7867

Open the permit page

$231,196
Oct 26, 2015Completed
final sign-off Oct 2020
995 Market Stinstallation of hvac work for 8,9,10,14,15,16 floors: reference 2015.0728.2593 for 8,10,14 fl. 2015.0728.2594 for 9,15,16 fl.
Details
Permit
201510260746
Status
complete
Filed
Oct 26, 2015
Permit issued
Oct 27, 2015
Final sign-off
Oct 15, 2020
Declared cost
$278,000
Address
995 Market St

installation of hvac work for 8,9,10,14,15,16 floors: reference 2015.0728.2593 for 8,10,14 fl. 2015.0728.2594 for 9,15,16 fl.

Open the permit page

$278,000
Oct 6, 2015Never finaled
issued Oct 2015, no final
100 Green Stinstall split system fan coil & condensor air duct
Details
Permit
201510068947
Status
issued
Filed
Oct 6, 2015
Permit issued
Oct 13, 2015
Declared cost
$15,000
Address
100 Green St

install split system fan coil & condensor air duct

Open the permit page

$15,000
Sep 3, 2015Never finaled
issued Oct 2015, no final
995 Market St2nd and mezzanine - installation of fan coils 34 (4) condemn. title 24 combine & ductwork
Details
Permit
201509036135
Status
issued
Filed
Sep 3, 2015
Permit issued
Oct 13, 2015
Declared cost
$180,000
Address
995 Market St

2nd and mezzanine - installation of fan coils 34 (4) condemn. title 24 combine & ductwork

Open the permit page

$180,000
Sep 3, 2015Never finaled
issued Sep 2015, no final
995 Market Stinstallation of 19 fan coil units, 3 condemn. title 24 combine including duct work, mechanical plans for phase 1 on 3rd and 4th floors. ref t.i. #201506158928 & 201506158929.
Details
Permit
201509036134
Status
issued
Filed
Sep 3, 2015
Permit issued
Sep 11, 2015
Declared cost
$180,000
Address
995 Market St

installation of 19 fan coil units, 3 condemn. title 24 combine including duct work, mechanical plans for phase 1 on 3rd and 4th floors. ref t.i. #201506158928 & 201506158929.

Open the permit page

$180,000
Aug 13, 2014Never finaled
issued Oct 2014, no final
540 Leavenworth Stinstall 43 wall mount hot water connectors. toilet, exhaust fans, and corridor exhaust/supply ref pa# 2014/02/25/9267. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201408133708
Status
issued
Filed
Aug 13, 2014
Permit issued
Oct 6, 2014
Declared cost
$375,775
Address
540 Leavenworth St

install 43 wall mount hot water connectors. toilet, exhaust fans, and corridor exhaust/supply ref pa# 2014/02/25/9267. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$375,775
May 23, 2013Never finaled
issued Oct 2013, no final
1077 Mission Stmechanical, electrical, plumbing. ref app#201212216730
Details
Permit
201305237734
Status
issued
Filed
May 23, 2013
Permit issued
Oct 10, 2013
Declared cost
$17,989
Address
1077 Mission St

mechanical, electrical, plumbing. ref app#201212216730

Open the permit page

$17,989
Dec 24, 2012Completed
final sign-off Sep 2013
25 Taylor Sttheater was damaged & removed. 4 new inline exhaust fun were being install to replace the (e) fan w/ (n) vfd at different location & fan wil be steaked & set on vibration isolators will be connected to (e) duct w/ flex connectors.
Details
Permit
201212246805
Status
complete
Filed
Dec 24, 2012
Permit issued
Dec 24, 2012
Final sign-off
Sep 19, 2013
Declared cost
$60,000
Address
25 Taylor St

theater was damaged & removed. 4 new inline exhaust fun were being install to replace the (e) fan w/ (n) vfd at different location & fan wil be steaked & set on vibration isolators will be connected to (e) duct w/ flex connectors.

Open the permit page

$60,000
Jul 5, 2011Completed
final sign-off Feb 2012
560 Mission Stto comply with nov# 201044220 dated 5/17/2010. installation of new captive aire type 1 hood, removing the existing ducting and replacing with new ducting inside retauirant and new exterior louvre
Details
Permit
201107059466
Status
complete
Filed
Jul 5, 2011
Permit issued
Nov 3, 2011
Final sign-off
Feb 13, 2012
Declared cost
$25,000
Address
560 Mission St

to comply with nov# 201044220 dated 5/17/2010. installation of new captive aire type 1 hood, removing the existing ducting and replacing with new ducting inside retauirant and new exterior louvre

Open the permit page

$25,000
Nov 15, 2010Completed
final sign-off May 2011
354 11th St354 11th st-install 1 heater, 1 exhaust fan & 2 supply air fans
Details
Permit
201011154977
Status
complete
Filed
Nov 15, 2010
Permit issued
Nov 15, 2010
Final sign-off
May 18, 2011
Declared cost
$9,850
Address
354 11th St

354 11th st-install 1 heater, 1 exhaust fan & 2 supply air fans

Open the permit page

$9,850
Apr 29, 2009Completed
final sign-off Mar 2010
410 Bush Stcomply w/ nov 20099980/bid. install tow 24 x 30 ducts on roof conected to (n) exhaust fan and supply fan. (n) metal stair for service and (n) handrail along (e) light well. fire alarm under separate permit.
Details
Permit
200904297343
Status
complete
Filed
Apr 29, 2009
Permit issued
May 13, 2009
Final sign-off
Mar 17, 2010
Declared cost
$28,000
Address
410 Bush St

comply w/ nov 20099980/bid. install tow 24 x 30 ducts on roof conected to (n) exhaust fan and supply fan. (n) metal stair for service and (n) handrail along (e) light well. fire alarm under separate permit.

Open the permit page

$28,000
Mar 28, 2006Completed
final sign-off Aug 2006
200 Townsend Sthvac per plan at 1st floor refere to bldg app #200412080950
Details
Permit
200603287662
Status
complete
Filed
Mar 28, 2006
Permit issued
Mar 28, 2006
Final sign-off
Aug 17, 2006
Declared cost
$37,750
Address
200 Townsend St

hvac per plan at 1st floor refere to bldg app #200412080950

Open the permit page

$37,750