Alive Design & Construction
- Based in
- Moraga
- On San Francisco permits
- Feb 2007 to Feb 2025
- Last 24 months
- 1 permit filed
31 permits since 2000: 20 completed, 1 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2025 | In progress issued Apr 2025 | 601 Laguna Honda Bl | interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening.Details
interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening. | $108,000 |
| Jun 29, 2023 | Completed final sign-off Apr 2024 | 2472 21st Av | rev to pa# 2023-0419-6015: all new laundry hook in the upper level remodel (e) half bathroom new smn new tolilet replace bathroom windows to meet code tempered glass requiredDetails
rev to pa# 2023-0419-6015: all new laundry hook in the upper level remodel (e) half bathroom new smn new tolilet replace bathroom windows to meet code tempered glass required | |
| Apr 19, 2023 | Completed final sign-off Apr 2024 | 2472 21st Av | bathroom and kitchen remodel in-kind, upgrade hvac and electrical per code.Details
bathroom and kitchen remodel in-kind, upgrade hvac and electrical per code. | $100,000 |
| Oct 7, 2020 | Expired or cancelled withdrawn Apr 2023 | 2472 21st Av | in law addition in the basement(1st floor as marked on plans) and 1/2 bath addition in the existing floor, kitchen remodel and bath remodel in the 1st floor. adu per ordinance no. 162-16.Details
in law addition in the basement(1st floor as marked on plans) and 1/2 bath addition in the existing floor, kitchen remodel and bath remodel in the 1st floor. adu per ordinance no. 162-16. | $250,000 |
| Mar 14, 2019 | Never finaled issued Apr 2019, no final | 1429 Mendell St | install new hvac unit on roof. no work involving kitchen exhaust hood system.Details
install new hvac unit on roof. no work involving kitchen exhaust hood system. | $25,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 1429 Mendell St | health only: dph deferred submittal dwgs for bar/serving counter. ref pa #201705106163.Details
health only: dph deferred submittal dwgs for bar/serving counter. ref pa #201705106163. | |
| Aug 24, 2017 | Completed final sign-off Mar 2018 | 1429 Mendell St | revision to pa 2017-0510-6163 (already reviewed by dph); reduce scope of work - remove rampDetails
revision to pa 2017-0510-6163 (already reviewed by dph); reduce scope of work - remove ramp | |
| Aug 24, 2017 | Completed final sign-off Mar 2018 | 1429 Mendell St | revision to pa 2017-0510-6163 (already reviewed by dph), primary entry - ramp - ada compliantDetails
revision to pa 2017-0510-6163 (already reviewed by dph), primary entry - ramp - ada compliant | |
| May 10, 2017 | Completed final sign-off Mar 2018 | 1429 Mendell St | interior work only, relocating existing stairs to mezzanine and making primary entry ada compliant.Details
interior work only, relocating existing stairs to mezzanine and making primary entry ada compliant. | $32,895 |
| Apr 5, 2016 | Completed final sign-off Nov 2017 | 1875 38th Av | remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/denDetails
remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/den | $205,000 |
| Oct 8, 2015 | Completed final sign-off Mar 2016 | 1429 Mendell St | to obtain final inspection for work approved under pa# 201201202693 & 201112070213. all work is completeDetails
to obtain final inspection for work approved under pa# 201201202693 & 201112070213. all work is complete | |
| Oct 8, 2015 | Completed final sign-off Mar 2016 | 1429 Mendell St | to obtain final inspection for work approved under pa#201112050108 & 201108253285. all work is complete.Details
to obtain final inspection for work approved under pa#201112050108 & 201108253285. all work is complete. | |
| Nov 25, 2014 | Completed final sign-off Feb 2016 | 264 Evelyn Wy | ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rearDetails
ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rear | $200,000 |
| Jun 19, 2014 | Never finaled issued Jan 2016, no final | 900 22nd St | reconstruct bulkhead and trim. re-habilitate (e) entry. window replacement of the same like & kind. replacement of restaurant sign with new sign of similar material (metal) under separate permit.Details
reconstruct bulkhead and trim. re-habilitate (e) entry. window replacement of the same like & kind. replacement of restaurant sign with new sign of similar material (metal) under separate permit. | $2,000 |
| Jan 16, 2014 | Completed final sign-off Jun 2014 | 900 22nd St | install new kitchen hood, duct work, extractor and makeup air motors on roof. ref app#201310310809Details
install new kitchen hood, duct work, extractor and makeup air motors on roof. ref app#201310310809 | $8,000 |
| Dec 23, 2013 | Completed final sign-off Jun 2014 | 900 22nd St | new electical/ lighting installation. ref app#201103212740/r1Details
new electical/ lighting installation. ref app#201103212740/r1 | $5,000 |
| Dec 3, 2013 | Never finaled issued Jan 2014, no final | 900 22nd St | revision to app# 201103212470 - replace broken window and frame for new window. visible from the street.Details
revision to app# 201103212470 - replace broken window and frame for new window. visible from the street. | $500 |
| Nov 5, 2013 | Completed final sign-off Apr 2014 | 1900 08th Av | remodel kitchen and install toilet room at 1st floor and replace bathroom fixtures at 2nd floor.Details
remodel kitchen and install toilet room at 1st floor and replace bathroom fixtures at 2nd floor. | $40,000 |
| Oct 31, 2013 | Completed final sign-off Jun 2014 | 900 22nd St | revision to pa# 2011-0321-2470-relocation of bar counter & kitchen equipment layout per application referred to aboveDetails
revision to pa# 2011-0321-2470-relocation of bar counter & kitchen equipment layout per application referred to above | $10,000 |
| Jan 20, 2012 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | as-built floor plan & revised bathroom layout @ men's.Details
as-built floor plan & revised bathroom layout @ men's. | |
| Dec 6, 2011 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | change of use from church to full service restaurant.Details
change of use from church to full service restaurant. | |
| Dec 5, 2011 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | "as-built" plan revision to p.a.#2011-0825-3285 for final inspection.Details
"as-built" plan revision to p.a.#2011-0825-3285 for final inspection. | $3,000 |
| Nov 4, 2011 | Completed final sign-off Jan 2012 | 5126 03rd St | repair wood siding at side of bldg due to fire damaged from adjacent structure. repair front door jamb. repair stair hand rail.Details
repair wood siding at side of bldg due to fire damaged from adjacent structure. repair front door jamb. repair stair hand rail. | $2,500 |
| Oct 17, 2011 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | install a 10' hood in the kitchen.Details
install a 10' hood in the kitchen. | $10,000 |
| Aug 25, 2011 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | remodel kitchen, install 2 new ada accessible rest rooms, add 1-hr. corridor.Details
remodel kitchen, install 2 new ada accessible rest rooms, add 1-hr. corridor. | $40,000 |
| Mar 21, 2011 | Completed final sign-off Jun 2014 | 900 22nd St | change of use from coffee house to full service restaurant. interior tenant improvement. remodel (e) kitchen to include class i hood & associated cooking equipment. light plumbing & electrical included.Details
change of use from coffee house to full service restaurant. interior tenant improvement. remodel (e) kitchen to include class i hood & associated cooking equipment. light plumbing & electrical included. | $18,000 |
| Jul 16, 2007 | Never finaled issued Jul 2007, no final | 2479 Diamond St | renew pa# 2005/04/13/9944 & pa# 2005/03/14/7479 for final inspection only.Details
renew pa# 2005/04/13/9944 & pa# 2005/03/14/7479 for final inspection only. | |
| May 2, 2007 | Completed final sign-off Jul 2007 | 2479 Diamond St | renew pa#200506145016 for final inspection.Details
renew pa#200506145016 for final inspection. | |
| Apr 19, 2007 | Completed final sign-off Jun 2007 | 5126 03rd St | upgrade extg restroom to be ada accessible(voluntary upgrade)Details
upgrade extg restroom to be ada accessible(voluntary upgrade) | $7,000 |
| Mar 5, 2007 | Completed final sign-off Jun 2007 | 1050 North Point St | remove old bath tub/new frame work for the new tub. install new valves and new tub. minor tile repair work. install new light fixture. install new medicine cabinetsDetails
remove old bath tub/new frame work for the new tub. install new valves and new tub. minor tile repair work. install new light fixture. install new medicine cabinets | $6,000 |
| Feb 14, 2007 | Completed final sign-off Jun 2007 | 5126 03rd St | replace damaged plaster with new drywall @ ground floor office & meeting area exterior walls. repair dry rot @ interior wall (north side bldg.) only.Details
replace damaged plaster with new drywall @ ground floor office & meeting area exterior walls. repair dry rot @ interior wall (north side bldg.) only. | $3,000 |