Alhorn/Hooven-A Design Build Collaborati
- Based in
- Berkeley
- On San Francisco permits
- May 2010 to May 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2015 | Never finaled issued Sep 2015, no final | 454 Day St | remove (e) front stair & replace with in kind stair of similar size & style.Details
remove (e) front stair & replace with in kind stair of similar size & style. | $20,000 |
| Aug 7, 2014 | Completed final sign-off Jul 2015 | 454 Day St | remove and replace rot damaged framing at parapet at front facade of residence. replace damaged siding and trim elements with identical where occurs.Details
remove and replace rot damaged framing at parapet at front facade of residence. replace damaged siding and trim elements with identical where occurs. | $4,000 |
| Oct 7, 2010 | Completed final sign-off Dec 2010 | 454 Day St | revision to pa#201006285458 revise siding material to be used from cementicious siding panels to stucco with wood siding. all work @ back.Details
revision to pa#201006285458 revise siding material to be used from cementicious siding panels to stucco with wood siding. all work @ back. | |
| Jun 28, 2010 | Completed final sign-off Dec 2010 | 454 Day St | replace rotten windows in kitchen/breakfast w/ (n) custom wood insulated windows. replace rotten siding @ back & side of the house with new. (e) is t&g wood siding & (n) will be cementicious siding panels.Details
replace rotten windows in kitchen/breakfast w/ (n) custom wood insulated windows. replace rotten siding @ back & side of the house with new. (e) is t&g wood siding & (n) will be cementicious siding panels. | $5,000 |
| May 6, 2010 | Completed final sign-off Dec 2010 | 454 Day St | kitchen remodel-new cabinetry & finishes.Details
kitchen remodel-new cabinetry & finishes. | $63,500 |