23 permits since 2000: 19 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2024 | Completed final sign-off Aug 2025 | 860 Joost Av | lower floor (286sf) additon of new bedroom and bathroom. upper level remodel of kitchen and staircase. scope include mechanical, electrical and plumbing work. (2) skylight and relocate laundry.Details
lower floor (286sf) additon of new bedroom and bathroom. upper level remodel of kitchen and staircase. scope include mechanical, electrical and plumbing work. (2) skylight and relocate laundry. | $350,000 |
| Jan 21, 2021 | Completed final sign-off Apr 2021 | 850 Colby St | comply with violation #202172332. kitchen and bathroom cabinets, tub, shower pan, sink, toilet on the same location. no structural framing. 6 windows installation(retrofit) 2 back bedrooms, kitchen, dining, and bathroom. all window not visible from the street.Details
comply with violation #202172332. kitchen and bathroom cabinets, tub, shower pan, sink, toilet on the same location. no structural framing. 6 windows installation(retrofit) 2 back bedrooms, kitchen, dining, and bathroom. all window not visible from the street. | $100,000 |
| Apr 17, 2019 | Completed final sign-off Jul 2019 | 87 Melrose Av | remove load bearing wall @ 2nd fl. remodel existing bathroomDetails
remove load bearing wall @ 2nd fl. remodel existing bathroom | $30,000 |
| Jul 17, 2018 | Completed final sign-off Dec 2018 | 725 Rolph St | full kitchen remodel on all existing layout. replace with kitchen retrofit window. rewire entire kitchen area. new cabinet, floor tile, no walls to be removed. kitchen floor area 11 x 11. window not visible from streetDetails
full kitchen remodel on all existing layout. replace with kitchen retrofit window. rewire entire kitchen area. new cabinet, floor tile, no walls to be removed. kitchen floor area 11 x 11. window not visible from street | $30,000 |
| May 24, 2017 | Completed final sign-off Aug 2017 | 108 Everson St | convert (e) 2 fixture bath to a 3 fixture bath on 2nd floorDetails
convert (e) 2 fixture bath to a 3 fixture bath on 2nd floor | $12,000 |
| Oct 18, 2016 | Completed final sign-off Mar 2017 | 15 Teresita Bl | #9- kitchen cabinet replacement, no floor work, no walls knock down and no structural work. all to be on existing layout.Details
#9- kitchen cabinet replacement, no floor work, no walls knock down and no structural work. all to be on existing layout. | $10,000 |
| Apr 2, 2015 | Completed final sign-off May 2015 | 553 Frederick St | apt 302: 2 bathrooms remodeling: 1. hall bath: replace all fixtures except tub to existing locations. 2. master bath: replace all fixtures on existing locations. tub to shower pan conversion with seat. no walls & structural work.Details
apt 302: 2 bathrooms remodeling: 1. hall bath: replace all fixtures except tub to existing locations. 2. master bath: replace all fixtures on existing locations. tub to shower pan conversion with seat. no walls & structural work. | $15,000 |
| Jun 20, 2014 | Completed final sign-off Jul 2014 | 389 Warren Dr | 2nd bathroom remodeling: replace sink, toilet, showerpan, faucet, tiles at existing location, approx 35 sq. feetDetails
2nd bathroom remodeling: replace sink, toilet, showerpan, faucet, tiles at existing location, approx 35 sq. feet | $10,000 |
| May 1, 2014 | Completed final sign-off Jul 2014 | 389 Warren Dr | bathroom remodeling, replacement of tub, shower faucet, shower wall tiles, floor tiles & sink at (e) location, no fan & gfi outlet work, replacement of switch & light fixture. 45 sq ft.Details
bathroom remodeling, replacement of tub, shower faucet, shower wall tiles, floor tiles & sink at (e) location, no fan & gfi outlet work, replacement of switch & light fixture. 45 sq ft. | $10,000 |
| Dec 4, 2013 | Completed final sign-off Jan 2014 | 572 Roosevelt Wy | hardie backer installation electrical and tile work.Details
hardie backer installation electrical and tile work. | $7,000 |
| Apr 5, 2013 | Never finaled issued Apr 2013, no final | 786 Minna St | remodel bathroom- remove all wall coverings, replace new ceiling covering & tile walls, remove swinging door jamb & replace with surface mount sliding door, replace exhaust fan & install 3 new ceiling lights, relocate gfci outlet, replace tub with pre-fab shower stall, replace double sink.Details
remodel bathroom- remove all wall coverings, replace new ceiling covering & tile walls, remove swinging door jamb & replace with surface mount sliding door, replace exhaust fan & install 3 new ceiling lights, relocate gfci outlet, replace tub with pre-fab shower stall, replace double sink. | $10,000 |
| Mar 8, 2013 | Completed final sign-off Jul 2014 | 606 Lisbon St | demolish (e) sunroom, deck & stair.rebuild new sunroom,deck & stair with firewall at property line and storage below.Details
demolish (e) sunroom, deck & stair.rebuild new sunroom,deck & stair with firewall at property line and storage below. | $20,000 |
| Nov 29, 2012 | Completed final sign-off Jan 2013 | 136 Benton Av | bathroom remodeleeing and dry rot repair. tub to stand up shower converstion, relocation of sink, replacement of exhaust vent, additional recess lights and replacement of tiles. replacement of shower faucet.Details
bathroom remodeleeing and dry rot repair. tub to stand up shower converstion, relocation of sink, replacement of exhaust vent, additional recess lights and replacement of tiles. replacement of shower faucet. | $15,000 |
| Apr 9, 2012 | Completed final sign-off May 2012 | 22 Hancock St | remove and replace tiles, tub, sink and toilet at existing location. no electrical work. no structural work. no new lightingDetails
remove and replace tiles, tub, sink and toilet at existing location. no electrical work. no structural work. no new lighting | $5,500 |
| Sep 2, 2011 | Completed final sign-off Nov 2012 | 570 Arkansas St | interior remodel:adding 223 s.f. of conditioned space at 1st floor for new guest room and full bath. remodel kitchen and bathroom at 2nd floor. replace rear facing windows with new window and doors per plans. replacement windows at side per plans . add new ceiling framing at kit/dinDetails
interior remodel:adding 223 s.f. of conditioned space at 1st floor for new guest room and full bath. remodel kitchen and bathroom at 2nd floor. replace rear facing windows with new window and doors per plans. replacement windows at side per plans . add new ceiling framing at kit/din | $88,000 |
| Feb 23, 2011 | Completed final sign-off Aug 2011 | 271 Ripley St | revision to approved app #201011084489: toilet, shower, and lavatories in bath room relocated.Details
revision to approved app #201011084489: toilet, shower, and lavatories in bath room relocated. | |
| Jan 6, 2011 | Completed final sign-off Apr 2011 | 189 Crescent Av | remove existing damaged staircase & deck - replace with new stairs & deck. all exterior work in-kind replacement. to comply with nov #201081606.Details
remove existing damaged staircase & deck - replace with new stairs & deck. all exterior work in-kind replacement. to comply with nov #201081606. | $7,500 |
| Nov 8, 2010 | Completed final sign-off Aug 2011 | 271 Ripley St | non structural remodel of an existing full bathroon on the 1st floor. convert 2 existing rooms to sleeping rooms, one at first floor and one at second floor.Details
non structural remodel of an existing full bathroon on the 1st floor. convert 2 existing rooms to sleeping rooms, one at first floor and one at second floor. | $20,000 |
| Apr 19, 2010 | Never finaled issued Apr 2010, no final | 448 Utah St | dry rot repair work as required by district inspector. work in related to pa # 201004099987 replaced studs.Details
dry rot repair work as required by district inspector. work in related to pa # 201004099987 replaced studs. | $300 |
| Apr 9, 2010 | Completed final sign-off Dec 2010 | 448 Utah St | bathroom remodeling-drywall & tile work, provide high efficacy lights per cec 151k, relocate toilet, replace sink & shower. window installation with framing work (smaller window), exhaust fan, recess lights (3) & swithces.Details
bathroom remodeling-drywall & tile work, provide high efficacy lights per cec 151k, relocate toilet, replace sink & shower. window installation with framing work (smaller window), exhaust fan, recess lights (3) & swithces. | $13,500 |
| Apr 24, 2008 | Expired or cancelled expired Sep 2009 | 44 Nevada St | interior remodel: remodeled kitchen & 2 remodeled bathrooms (less than 30% of load bearing walls; no seismic upgrade) , remove and add new wood windows and doors @ rear & sides; add patio/deck @ rear; new rear conc. stairs and (n) gate, to comply w/housing violation #200118749. add 2 (n) skylights.Details
interior remodel: remodeled kitchen & 2 remodeled bathrooms (less than 30% of load bearing walls; no seismic upgrade) , remove and add new wood windows and doors @ rear & sides; add patio/deck @ rear; new rear conc. stairs and (n) gate, to comply w/housing violation #200118749. add 2 (n) skylights. | $128,000 |
| Mar 26, 2007 | Never finaled issued Apr 2009, no final | 823 Peralta Av | (work to be done at top unit only) remodel 2 existing 4' tall closets to incorporate full height area with new dormers. new closwet lighting fluorescent.Details
(work to be done at top unit only) remodel 2 existing 4' tall closets to incorporate full height area with new dormers. new closwet lighting fluorescent. | $5,000 |
| Jan 30, 2007 | Completed final sign-off Apr 2007 | 66 Cleary Ct | unit #808 - remodel of existing bathtub and build-up shower pan with tile flooring and revising the existing drain plumbing.Details
unit #808 - remodel of existing bathtub and build-up shower pan with tile flooring and revising the existing drain plumbing. | $1,000 |