Alex Painting & Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Feb 2024
- Last 24 months
- 0 permits filed
25 permits since 2000: 22 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2024 | Completed final sign-off Apr 2024 | 88 Robinson Dr | remodel kitchen and bathroom. upgrade electrical main service from 40 amp to 100 amp and upgrade wiring. no removal of walls.Details
remodel kitchen and bathroom. upgrade electrical main service from 40 amp to 100 amp and upgrade wiring. no removal of walls. | $25,000 |
| Jan 6, 2022 | Completed final sign-off Apr 2023 | 49 Crestmont Dr | interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level.Details
interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level. | $20,000 |
| Jul 22, 2020 | Completed final sign-off Dec 2020 | 2243 Bay St | add a full bathroom to (e) bedroom.Details
add a full bathroom to (e) bedroom. | $5,000 |
| Nov 29, 2018 | Completed final sign-off Feb 2019 | 1242 Pacific Av | remove + replace aluminum windows in front building total four. the window will be make by aluminum + wood clad.Details
remove + replace aluminum windows in front building total four. the window will be make by aluminum + wood clad. | $8,000 |
| May 19, 2015 | Completed final sign-off Jun 2015 | 695 15th Av | to comply w/nov #201532891 #'s 6-7 & 8 - repair dryrot at backstair & railing install <50%. replace fire extinguishes on each floor.Details
to comply w/nov #201532891 #'s 6-7 & 8 - repair dryrot at backstair & railing install <50%. replace fire extinguishes on each floor. | $1,200 |
| Mar 20, 2015 | Completed final sign-off May 2015 | 862 Jamestown Av | remove & replace stucco wall in front of building.Details
remove & replace stucco wall in front of building. | $5,000 |
| Sep 16, 2013 | Completed final sign-off Nov 2013 | 12 Eugenia Av | remodel of bathroom & w.c. on 2/f, no change on walls.Details
remodel of bathroom & w.c. on 2/f, no change on walls. | $10,000 |
| Jun 28, 2013 | Completed final sign-off Sep 2013 | 12 Eugenia Av | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $20,000 |
| Jun 20, 2013 | Completed final sign-off Jul 2013 | 206 Lisbon St | comply with nov# 201114781 & 200671923-demolish unpermitted rooms, kitchen & bathroom on ground floor (garage)Details
comply with nov# 201114781 & 200671923-demolish unpermitted rooms, kitchen & bathroom on ground floor (garage) | $1,800 |
| Jan 28, 2013 | Completed final sign-off Feb 2013 | 107 03rd Av | remodel kitchen and flooring, paintingDetails
remodel kitchen and flooring, painting | $10,000 |
| Apr 21, 2011 | Completed final sign-off Jun 2011 | 353 Peninsula Av | upgrade kitchen and two bathrooms on 2nd floorDetails
upgrade kitchen and two bathrooms on 2nd floor | $20,000 |
| Apr 19, 2011 | Never finaled issued Apr 2011, no final | 76 Tioga Av | change exterior finish material from stucco to hardi board siding. no other exterior changesDetails
change exterior finish material from stucco to hardi board siding. no other exterior changes | $20,000 |
| Mar 28, 2011 | Completed final sign-off Jun 2011 | 353 Peninsula Av | add family room, bedroom and a full bath room on 1st/garage floorDetails
add family room, bedroom and a full bath room on 1st/garage floor | $30,000 |
| Mar 11, 2011 | Completed final sign-off Dec 2011 | 76 Tioga Av | interior remodel-add 1 bedroom & 1 bathroom at ground floor, removed (e) bathroom at 2nd floor & add 1 new bathroom & 1 bedroom at 2nd floor. add 1 bathroom at 3rd floor, repair exterior stuccoDetails
interior remodel-add 1 bedroom & 1 bathroom at ground floor, removed (e) bathroom at 2nd floor & add 1 new bathroom & 1 bedroom at 2nd floor. add 1 bathroom at 3rd floor, repair exterior stucco | $20,000 |
| Jul 23, 2010 | Completed final sign-off Oct 2010 | 1362 Jackson St | remodel bathroom, replace kitchen cabinets, replace damaged plaster wall & ceiling. paint interior. upgrade electric wiring & sub panel. refurnish hardwood floor. work at #1362 only.Details
remodel bathroom, replace kitchen cabinets, replace damaged plaster wall & ceiling. paint interior. upgrade electric wiring & sub panel. refurnish hardwood floor. work at #1362 only. | $16,000 |
| Dec 31, 2009 | Completed final sign-off Mar 2010 | 6020 California St | comply with physical inspection report cc#5570Details
comply with physical inspection report cc#5570 | $2,000 |
| Aug 28, 2009 | Completed final sign-off Jan 2010 | 5224 California St | 1st floor -replace (e) water heaters & furnaces. 2nd & 3rd floor - remodel (e) kitchen & (e) bathroom ( combine (e) 1/2 bath & (e) bath), add new bathroom adj to master bedroom. remove non-structural walls between kitchen/office/m. bedroom closet.Details
1st floor -replace (e) water heaters & furnaces. 2nd & 3rd floor - remodel (e) kitchen & (e) bathroom ( combine (e) 1/2 bath & (e) bath), add new bathroom adj to master bedroom. remove non-structural walls between kitchen/office/m. bedroom closet. | $65,256 |
| Aug 21, 2009 | Completed final sign-off Sep 2009 | 6014 California St | to comply with 3r-5167 condo conversionDetails
to comply with 3r-5167 condo conversion | $3,000 |
| Feb 1, 2008 | Never finaled issued Feb 2008, no final | 1735 Stockton St | street space permitDetails
street space permit | |
| Jan 2, 2008 | Completed final sign-off Apr 2008 | 1530 Mcallister St | work on unit #2 - remodel bathroom in-kind (new toilet, sink, finishes) and remodel kitchen in-kind (new finishes & fixtures). high efficiency fixtures in bathroom (or else motion sensor switch); 50% wattage high efficiency fixtures in kitchen. no nex exhaust duct work.Details
work on unit #2 - remodel bathroom in-kind (new toilet, sink, finishes) and remodel kitchen in-kind (new finishes & fixtures). high efficiency fixtures in bathroom (or else motion sensor switch); 50% wattage high efficiency fixtures in kitchen. no nex exhaust duct work. | $35,000 |
| Sep 6, 2007 | Completed final sign-off Oct 2007 | 174 22nd Av | work @ apt# 1 & # 2 only. repair exterior wall to remove dry rot structure & replace vinyl window with same deminsion. plaster stucco for the original wall. 4 windows at front to be replaced.Details
work @ apt# 1 & # 2 only. repair exterior wall to remove dry rot structure & replace vinyl window with same deminsion. plaster stucco for the original wall. 4 windows at front to be replaced. | $6,000 |
| Sep 23, 2005 | Completed final sign-off Dec 2005 | 6020 California St | roof deck constructed w/o permit-tocomply w/n.o.v rec'dDetails
roof deck constructed w/o permit-tocomply w/n.o.v rec'd | $1,500 |
| May 23, 2005 | Completed final sign-off Jan 2006 | 42 Varennes St | repair few posts & steps, and painting, at lightwell per housing inspc 200560234Details
repair few posts & steps, and painting, at lightwell per housing inspc 200560234 | $3,500 |
| Apr 4, 2005 | Never finaled issued Apr 2005, no final | 1826 19th Av | replace shingle to siding wood front of the building and paintingDetails
replace shingle to siding wood front of the building and painting | $4,000 |
| Nov 5, 2004 | Completed final sign-off Feb 2005 | 2158 19th Av | remove and replace new stucco only on front of building. remove and replace 4 windows only. replaceDetails
remove and replace new stucco only on front of building. remove and replace 4 windows only. replace | $9,000 |