Akamai Signs & Graphics
- Based in
- Galt
- On San Francisco permits
- Jul 2021 to Jul 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2021 | Never finaled issued Jul 2021, no final | 3251 20th Av | space 265: install 1 non illuminated double sign sign near entrance pillar "windsor"Details
space 265: install 1 non illuminated double sign sign near entrance pillar "windsor" | $1,000 |
| Jul 30, 2021 | Never finaled issued Jul 2021, no final | 3251 20th Av | space 265: install 1 illuminated sign over entrance "windsor"Details
space 265: install 1 illuminated sign over entrance "windsor" | $1,000 |
| Jul 30, 2021 | Never finaled issued Jul 2021, no final | 3251 20th Av | space 265: install 1 double faced illuminated blade sign over entrance "windsor"Details
space 265: install 1 double faced illuminated blade sign over entrance "windsor" | $1,000 |