Airco Mechanical Inc
- Based in
- Sacramento
- On San Francisco permits
- Sep 2010 to Jul 2025
- Last 24 months
- 1 permit filed
9 permits since 2000: 5 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2025 | Completed final sign-off Mar 2026 | 101 Post St | interior t.i. of new supplemental mechanical equipent-ceiling, electrical scope. existing food service not affected by the scope of work.Details
interior t.i. of new supplemental mechanical equipent-ceiling, electrical scope. existing food service not affected by the scope of work. | $175,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2022 | 649 Front St | hvac duct demolition and cap as necessary. frabricate and install 9 transfer air sleeves through wall and install a wall grille on each side. tap (e) ductwork and run new supply air branches to new rooms as necessary. furnish and install 9 new supply air diffusers, mechanical insulation per title 24Details
hvac duct demolition and cap as necessary. frabricate and install 9 transfer air sleeves through wall and install a wall grille on each side. tap (e) ductwork and run new supply air branches to new rooms as necessary. furnish and install 9 new supply air diffusers, mechanical insulation per title 24 | $31,000 |
| Apr 11, 2018 | Completed final sign-off Oct 2018 | 301 Howard St | install grease exhaust duct system for (f) restaurant. relocate (e) utilities as neededDetails
install grease exhaust duct system for (f) restaurant. relocate (e) utilities as needed | $100,000 |
| Mar 15, 2018 | Expired or cancelled cancelled Jan 2026 | 301 Howard St | install grease duct for future restaurant. relocate (e) hvac unit maher naDetails
install grease duct for future restaurant. relocate (e) hvac unit maher na | $292,000 |
| Apr 21, 2015 | Never finaled issued May 2015, no final | 420 Montgomery St | installation of new hot water boiler. new gas piping, flue, supply and return piping to extg system infrastructure. ref app#201208227981.Details
installation of new hot water boiler. new gas piping, flue, supply and return piping to extg system infrastructure. ref app#201208227981. | $140,000 |
| Mar 10, 2015 | Expired or cancelled cancelled Jan 2026 | 457 Minna St | hvac renovation at 2nd and 3rd floor. plumbing n/a for the maher.Details
hvac renovation at 2nd and 3rd floor. plumbing n/a for the maher. | $62,575 |
| Jun 11, 2014 | Never finaled issued Jul 2014, no final | 3565 California St | 2 roof top package air conditioning units. 1 ducted split system and related air distribution throughout. 3 new roof top exthaust fans. plumbing work associated with above scope.Details
2 roof top package air conditioning units. 1 ducted split system and related air distribution throughout. 3 new roof top exthaust fans. plumbing work associated with above scope. | $134,835 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 505 Montgomery St | remove & replace the air handing systems outside air & return air dampers have been removed & replaced under the emcs (energy management control system) retrofit.n/a for the maher ordinance #155-13Details
remove & replace the air handing systems outside air & return air dampers have been removed & replaced under the emcs (energy management control system) retrofit.n/a for the maher ordinance #155-13 | $60,000 |
| Sep 23, 2010 | Completed final sign-off Mar 2011 | 555 California St | installation of 120 ton pony chiller on 15th fl mezzanine, 2 pumps, 1 exhaust fan, pipe, ducts, refrigerant monitor, wall and ceiling to enclose chiller refrigerant room, and safety alarms switches, indicatoers and signsDetails
installation of 120 ton pony chiller on 15th fl mezzanine, 2 pumps, 1 exhaust fan, pipe, ducts, refrigerant monitor, wall and ceiling to enclose chiller refrigerant room, and safety alarms switches, indicatoers and signs | $210,000 |