Air Systems, Inc.
- Based in
- San Jose
- On San Francisco permits
- Aug 2005 to Dec 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 1 La Avanzada | 1) remove and replace (2) 3-ton heat pump mechnical split systems.Details
1) remove and replace (2) 3-ton heat pump mechnical split systems. | $60,815 |
| Mar 12, 2020 | Completed final sign-off Sep 2021 | 1155 Market St | replacement of 2 existing boilers and 2 circulation pumps for boilers, 2 new circuits for new primary pumps.Details
replacement of 2 existing boilers and 2 circulation pumps for boilers, 2 new circuits for new primary pumps. | $56,807 |
| May 13, 2019 | Never finaled issued May 2019, no final | 1 Front St | disconect (e) 2-ton split system ac-unit in i.t room, install new 2-ton split system reconnect power and thermostats start-upDetails
disconect (e) 2-ton split system ac-unit in i.t room, install new 2-ton split system reconnect power and thermostats start-up | $14,500 |
| Jul 31, 2018 | Never finaled issued Aug 2018, no final | 2299 Post St | disconnection and safe-off of (e) mech infrastructure removal and haul off. remaining a rooftop package unit and installing programmable thermostat (as i will furnish & install) insulation of new fittings. demo all (e) conduit & wire back to roof penetration. provide and install new 208v, 3phaseDetails
disconnection and safe-off of (e) mech infrastructure removal and haul off. remaining a rooftop package unit and installing programmable thermostat (as i will furnish & install) insulation of new fittings. demo all (e) conduit & wire back to roof penetration. provide and install new 208v, 3phase | $67,500 |
| Feb 23, 2018 | Expired or cancelled cancelled Jan 2026 | 425 Market St | 11/f: install supply air ducts to existing unit. maher naDetails
11/f: install supply air ducts to existing unit. maher na | $5,000 |
| Dec 30, 2016 | Never finaled issued Dec 2016, no final | 340 Pine St | removal & replacement of roof top hvac package unit and install ductwork. same location, less wt). n/a maher ordinanceDetails
removal & replacement of roof top hvac package unit and install ductwork. same location, less wt). n/a maher ordinance | $95,000 |
| Jun 10, 2016 | Expired or cancelled cancelled Apr 2023 | 425 Market St | 0Details
0 | $140,000 |
| Jun 30, 2014 | Completed final sign-off Apr 2015 | 555 California St | mechanical, hvac, and ddc controls to include new duct work, vav boxes, water source heat pumps, condenser water piping, mechanical insulation and thermostats. maher-compliance with ordinance no.155-13 not required.Details
mechanical, hvac, and ddc controls to include new duct work, vav boxes, water source heat pumps, condenser water piping, mechanical insulation and thermostats. maher-compliance with ordinance no.155-13 not required. | $815,958 |
| May 1, 2014 | Completed final sign-off Sep 2014 | 120 Kearny St | 19th and 20th floor.low pressure ductwork and heating hot water piping. relocate 40 boxes, low pressure pneumatic vav boexes. 26 boxes with reheat coils and new hot water reheat coil connectors for exterior places and large meeting places. 14 cooling only boxes, 4 new water source heat pumpsDetails
19th and 20th floor.low pressure ductwork and heating hot water piping. relocate 40 boxes, low pressure pneumatic vav boexes. 26 boxes with reheat coils and new hot water reheat coil connectors for exterior places and large meeting places. 14 cooling only boxes, 4 new water source heat pumps | $637,594 |
| Jul 21, 2010 | Completed final sign-off Jul 2010 | 1001 Van Ness Av | to obtain final inspection for work approved under appl#200812309338. all work is completed.Details
to obtain final inspection for work approved under appl#200812309338. all work is completed. | |
| Dec 30, 2008 | Expired or cancelled expired Jul 2010 | 1001 Van Ness Av | replacement of 1 (e) cooling tower (5680). mechanical equipment will be a like for like replacement (5650) tower will be centrifugal cooling towerDetails
replacement of 1 (e) cooling tower (5680). mechanical equipment will be a like for like replacement (5650) tower will be centrifugal cooling tower | $44,000 |
| Sep 29, 2005 | Completed final sign-off Dec 2005 | 274 Brannan St | installation of (1) crac 1/c unit on the 5th floor switch room indoor only addition of (1) new 100 amp circuit breaker new electric wiring to the panel and connection to existing condensate lineDetails
installation of (1) crac 1/c unit on the 5th floor switch room indoor only addition of (1) new 100 amp circuit breaker new electric wiring to the panel and connection to existing condensate line | $157,605 |
| Aug 22, 2005 | Completed final sign-off Oct 2005 | 225 King St | installation of cold water piping for 3 new heat pumps and 3 l.p. duct systemsDetails
installation of cold water piping for 3 new heat pumps and 3 l.p. duct systems | $28,000 |