Advanced Construction
- Based in
- Carnelian Bay
- On San Francisco permits
- Aug 2008 to Jun 2013
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 19, 2013 | Completed final sign-off Feb 2014 | 1279 18th Av | replace seismic like for like on south side of building; replace one door,Details
replace seismic like for like on south side of building; replace one door, | $18,000 |
| May 6, 2013 | Never finaled issued May 2013, no final | 1418 47th Av | remove replace siding, like for like. add water proofing as needed. replace broken shingles. repair rotten boards and or replace less than 50% of deckDetails
remove replace siding, like for like. add water proofing as needed. replace broken shingles. repair rotten boards and or replace less than 50% of deck | $2,000 |
| Aug 14, 2012 | Completed final sign-off Sep 2012 | 927 Jackson St | install new gas heaters in each unit, including associated 1 hour shafts at 2nd & 3rd floors.Details
install new gas heaters in each unit, including associated 1 hour shafts at 2nd & 3rd floors. | $2,500 |
| Oct 29, 2010 | Completed final sign-off Oct 2011 | 1342 Francisco St | replace sink with toilet. replace existing bearing wall with new beam and posts and new beams below posts to founadation. remove part of existing non bearing wall. relocate 2 switches and 3 outletsDetails
replace sink with toilet. replace existing bearing wall with new beam and posts and new beams below posts to founadation. remove part of existing non bearing wall. relocate 2 switches and 3 outlets | $15,000 |
| Oct 21, 2010 | Completed final sign-off Feb 2011 | 91 Saint Germain Av | remove and replace guard rail at 2nd floor front. replace with glass rail systemDetails
remove and replace guard rail at 2nd floor front. replace with glass rail system | $4,000 |
| Oct 28, 2009 | Completed final sign-off Nov 2009 | 1342 Francisco St | comply with physical inspection report #cc5701, no building corrective work requiredDetails
comply with physical inspection report #cc5701, no building corrective work required | |
| Aug 14, 2008 | Completed final sign-off Sep 2011 | 11 Cook St | add a new 3rd floor and rear extention with rear decks and stairs. new roof deck. remodel ex basement, 1st floor and 2nd floor.Details
add a new 3rd floor and rear extention with rear decks and stairs. new roof deck. remodel ex basement, 1st floor and 2nd floor. | $500,000 |