Adler Builders Inc
- Based in
- Sunnyvale
- On San Francisco permits
- May 2024 to Jul 2026
- Last 24 months
- 13 permits filed
16 permits since 2000: 10 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 769 South Van Ness Av | 2x bathroom remodel and kitchen like for like no wall or layout change.Details
2x bathroom remodel and kitchen like for like no wall or layout change. | $55,000 |
| Feb 19, 2026 | In progress issued Feb 2026 | 230 27th St | repair existing front staircase - wood for wood in this case - no change in materials.Details
repair existing front staircase - wood for wood in this case - no change in materials. | $7,000 |
| Oct 30, 2025 | Completed final sign-off Apr 2026 | 2041 Sacramento St | replacement of dry rotted studs & headers. addition to existing permit#202510026561. work is in back on bldg. non street visible.Details
replacement of dry rotted studs & headers. addition to existing permit#202510026561. work is in back on bldg. non street visible. | $20,000 |
| Oct 2, 2025 | Completed final sign-off Feb 2026 | 1762 10th Av | bathroom remodel, tub to shower, upgrade all electrical, plumbing. no wall or layout changes.Details
bathroom remodel, tub to shower, upgrade all electrical, plumbing. no wall or layout changes. | $25,000 |
| Oct 2, 2025 | Completed final sign-off Apr 2026 | 2041 Sacramento St | back of house 300 sq ft new siding. like for like material, non street visible.Details
back of house 300 sq ft new siding. like for like material, non street visible. | $8,000 |
| Aug 5, 2025 | In progress issued Aug 2025 | 230 27th St | revision to permit 202412126725. replace uncovered (e) brick foundation with concrete foundation and (e) floor slab with new concrete slab at garage. thicken proposed slab-on-grade to meet bottom of proposed grade beam foundation to create uniform mat at new lower level habitable area.Details
revision to permit 202412126725. replace uncovered (e) brick foundation with concrete foundation and (e) floor slab with new concrete slab at garage. thicken proposed slab-on-grade to meet bottom of proposed grade beam foundation to create uniform mat at new lower level habitable area. | $80,000 |
| Jun 3, 2025 | Completed final sign-off Jul 2025 | 2 Samoset St | one bathroom remodel like for like, no walls or layout changes, shower panDetails
one bathroom remodel like for like, no walls or layout changes, shower pan | $25,000 |
| Apr 14, 2025 | In progress issued Jun 2025 | 154 Pixley St | interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom.Details
interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom. | $85,000 |
| Jan 13, 2025 | In progress issued Jan 2025 | 187 Skyview Wy | (1) bathroom remodel like for like no walls or layout change. tub for tubDetails
(1) bathroom remodel like for like no walls or layout change. tub for tub | $20,000 |
| Dec 12, 2024 | In progress issued Apr 2025 | 230 27th St | interior remodel to include 4' rear yard extension within required 30% rear yard setback. new excavation at finishe floor, new electrical and plumbing,new roof and new skylights. new work not visible from public right of way.Details
interior remodel to include 4' rear yard extension within required 30% rear yard setback. new excavation at finishe floor, new electrical and plumbing,new roof and new skylights. new work not visible from public right of way. | $650,000 |
| Dec 6, 2024 | Completed final sign-off Feb 2025 | 472 Lansdale Av | to obtain final inspection for pa# 201911046405, 202008171944, 201910013197. all work is complete.Details
to obtain final inspection for pa# 201911046405, 202008171944, 201910013197. all work is complete. | |
| Dec 4, 2024 | Completed final sign-off Jan 2025 | 453 08th Av | revision to pa #202411124799 adding 3 window replacement in kind at the back of the house.Details
revision to pa #202411124799 adding 3 window replacement in kind at the back of the house. | $10,000 |
| Nov 12, 2024 | Completed final sign-off Jan 2025 | 453 08th Av | 1-bathroom remodel, like for like, no walls or layout changes, tub to tub. partial rotten siding replacment in-kind. 30% of a whole wall.Details
1-bathroom remodel, like for like, no walls or layout changes, tub to tub. partial rotten siding replacment in-kind. 30% of a whole wall. | $35,000 |
| Jul 17, 2024 | Completed final sign-off Aug 2026 | 266 Waller St | interior remodel to include new kitchen & bath layout, new plumbing & appliancesDetails
interior remodel to include new kitchen & bath layout, new plumbing & appliances | $125,000 |
| May 9, 2024 | Completed final sign-off Jan 2025 | 1268 Treat Av | siding repair like for like at front.Details
siding repair like for like at front. | $15,000 |
| May 6, 2024 | Completed final sign-off Aug 2024 | 1919 Octavia St | unit #1: one bathroom remodel like for like, no walls or layout changes, showerpan.Details
unit #1: one bathroom remodel like for like, no walls or layout changes, showerpan. | $25,000 |