Adam's Construction & Painting
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to May 2018
- Last 24 months
- 0 permits filed
16 permits since 2000: 10 completed, 6 never finaled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2018 | Completed final sign-off Aug 2018 | 101 Lombard St | unit 712w: kitchen remodel, new appliances, cabinets, 9 recessed led lights, new countertops, dryer booster fan. remove 2 non-load bearing walls.Details
unit 712w: kitchen remodel, new appliances, cabinets, 9 recessed led lights, new countertops, dryer booster fan. remove 2 non-load bearing walls. | $15,000 |
| Jan 11, 2017 | Never finaled issued Jan 2017, no final | 2358 Market St | to comply with complaint #201642161. remove flourescent lighting & install led. new construction housing with track lighting to meet title 24 code.Details
to comply with complaint #201642161. remove flourescent lighting & install led. new construction housing with track lighting to meet title 24 code. | $10,000 |
| Nov 30, 2015 | Completed final sign-off Mar 2016 | 101 Lombard St | kitchen and bathroom remodel: change cabinets, counter top, 6 recessed lights, new appliances, tile floor, new vanity cabinet, recessed light, new counter top, tile, tub surround and floor, new exhaust fan. change single sink to double sink, shower valve.Details
kitchen and bathroom remodel: change cabinets, counter top, 6 recessed lights, new appliances, tile floor, new vanity cabinet, recessed light, new counter top, tile, tub surround and floor, new exhaust fan. change single sink to double sink, shower valve. | $20,000 |
| Sep 16, 2015 | Completed final sign-off Nov 2015 | 101 Lombard St | unit #712: remodel (2) bathrooms, (1) ceiling fan/ (5) led ceiling lights, (2) shower valves, (10 shower panDetails
unit #712: remodel (2) bathrooms, (1) ceiling fan/ (5) led ceiling lights, (2) shower valves, (10 shower pan | $10,000 |
| Nov 17, 2014 | Completed final sign-off Jul 2015 | 74 Crestline Dr | remove and replace front exterior siding and window trim with hardi plank 7-1/4 siding.Details
remove and replace front exterior siding and window trim with hardi plank 7-1/4 siding. | $15,000 |
| Nov 21, 2013 | Completed final sign-off Jun 2014 | 150 Lombard St | unit 702b:2 bathrooms remodel, update electrical, 2 shower valves, one shower pan, 2 toilets, on bathtub, 2 vinity faucets, one steam unit installed.Details
unit 702b:2 bathrooms remodel, update electrical, 2 shower valves, one shower pan, 2 toilets, on bathtub, 2 vinity faucets, one steam unit installed. | $18,074 |
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 310 Townsend St | bathroom remodel, tub to shower, 4 new recessed lights, one panasonic fan, shower pan, shower valveDetails
bathroom remodel, tub to shower, 4 new recessed lights, one panasonic fan, shower pan, shower valve | $10,000 |
| Jul 8, 2013 | Completed final sign-off Sep 2013 | 101 Lombard St | apt #415w-1 kitchen & 2 bathroom remodels-new shower valves, painting. kitchen cabinets, flooring, appliances, sink & faucet, tile surroundDetails
apt #415w-1 kitchen & 2 bathroom remodels-new shower valves, painting. kitchen cabinets, flooring, appliances, sink & faucet, tile surround | $33,744 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 1333 Jones St | remodel kitchen - foot print staying the same, electrical pulled his own permit online, lighting shall comply w/t-24.Details
remodel kitchen - foot print staying the same, electrical pulled his own permit online, lighting shall comply w/t-24. | $3,500 |
| Jan 6, 2012 | Completed final sign-off Feb 2012 | 1800 Scott St | replace/repair shower valve, new vanity & sink.Details
replace/repair shower valve, new vanity & sink. | $2,000 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 101 Lombard St | kitchen and bathroom remodel, re frame 3 partial walls, recessed lighting, new shower valve, carpet painting etc.Details
kitchen and bathroom remodel, re frame 3 partial walls, recessed lighting, new shower valve, carpet painting etc. | $25,000 |
| May 24, 2010 | Never finaled issued May 2010, no final | 101 Lombard St | remodel (1) bathroom with new bath tub, tiled shower, add light fixtures, new shower valve and tub fillersDetails
remodel (1) bathroom with new bath tub, tiled shower, add light fixtures, new shower valve and tub fillers | $15,000 |
| May 15, 2008 | Never finaled issued May 2008, no final | 1333 Jones St | work @ unit# 1104 only. remove & replace shower valve & shower pan. included tile work.Details
work @ unit# 1104 only. remove & replace shower valve & shower pan. included tile work. | $3,500 |
| Mar 27, 2008 | Never finaled issued Mar 2008, no final | 2770 19th Av | work @ unit# 50 only. remove bathtub, replace drain with zinch type, build shower pan with curb. remove & re-install 1 thremostatic shower valve.Details
work @ unit# 50 only. remove bathtub, replace drain with zinch type, build shower pan with curb. remove & re-install 1 thremostatic shower valve. | $2,000 |
| Dec 31, 2007 | Never finaled issued Dec 2007, no final | 1900 Steiner St | shower pan, shower valve & vanity cabinet.Details
shower pan, shower valve & vanity cabinet. | $3,500 |
| Nov 20, 2006 | Completed final sign-off Mar 2007 | 101 Lombard St | work @ unit# 909 w. remodel bathroom with taking two non structural shower walls. shower valve & tub valve to be changed to opposing wall sheet rock 2 walls where needed.Details
work @ unit# 909 w. remodel bathroom with taking two non structural shower walls. shower valve & tub valve to be changed to opposing wall sheet rock 2 walls where needed. | $55,000 |