Acorym Developers
- Based in
- Pinole
- On San Francisco permits
- Feb 2026 to Mar 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2026 | In progress issued Mar 2026 | 4150 Cesar Chavez St | unit 6: bathroom remodel, replace tub to shower, tile, toilet with new. kitchen remodel, replace flooring, countertops, cabinets with new. replace flooring, interior doors, floor trim, & paint walls. no wall removal.Details
unit 6: bathroom remodel, replace tub to shower, tile, toilet with new. kitchen remodel, replace flooring, countertops, cabinets with new. replace flooring, interior doors, floor trim, & paint walls. no wall removal. | $30,000 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 4150 Cesar Chavez St | unit 1: bathroom remodel, replace shower to shower, vanity, tiles with new ones, shower to shower. kitchen remodel, replace old countertops and cabinets with new ones.Details
unit 1: bathroom remodel, replace shower to shower, vanity, tiles with new ones, shower to shower. kitchen remodel, replace old countertops and cabinets with new ones. | $10,000 |