Permit GraphShortlistSan Francisco building permits since 2000

Acer-G Engineering

Contractor license
1143200
State license record
Based in
San Francisco
On San Francisco permits
Mar 2025 to Jul 2026
Last 24 months
17 permits filed

17 permits since 2000: 7 completed, 10 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 1Stairs 1Kitchen remodel 8Bathroom remodel 4
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 9, 2026In progress
filed Jul 2026, not yet issued
1068 Pacific Avto obtain final inspection for work approved under pa#'s 202210214889 and 202210285444. all work is complete.
Details
Permit
202607094793
Status
filed
Filed
Jul 9, 2026
Address
1068 Pacific Av

to obtain final inspection for work approved under pa#'s 202210214889 and 202210285444. all work is complete.

Open the permit page

Jul 9, 2026In progress
filed Jul 2026, not yet issued
675 Jackson Stto obtain final inspection for work approved under pa# 202206035579. all work is complete.
Details
Permit
202607094794
Status
filed
Filed
Jul 9, 2026
Address
675 Jackson St

to obtain final inspection for work approved under pa# 202206035579. all work is complete.

Open the permit page

Jun 5, 2026In progress
issued Jun 2026
1070 Pacific Avinkind kitchen and bathroom remodel. refresh sheetrock & insulation @ 2 bedrooms on 2/f. (use 5/8" gyp-x)
Details
Permit
202606052662
Status
issued
Filed
Jun 5, 2026
Permit issued
Jun 5, 2026
Declared cost
$7,500
Address
1070 Pacific Av

inkind kitchen and bathroom remodel. refresh sheetrock & insulation @ 2 bedrooms on 2/f. (use 5/8" gyp-x)

Open the permit page

$7,500
May 1, 2026Completed
final sign-off Aug 2026
600 Kearny Sttenant improvement. (e) cafe merge with adjacent tenant space and modify to dining space. new accessible all gender restroom, and provide new opening from kitchen to dining.
Details
Permit
202605010545
Status
complete
Filed
May 1, 2026
Permit issued
Jul 9, 2026
Final sign-off
Aug 11, 2026
Declared cost
$30,000
Address
600 Kearny St

tenant improvement. (e) cafe merge with adjacent tenant space and modify to dining space. new accessible all gender restroom, and provide new opening from kitchen to dining.

Open the permit page

$30,000
Mar 26, 2026In progress
issued Mar 2026
275 15th Avto comply with complaint 202650867: remodel one kitchen, restore to previously permitted condition. approx 120 sf.
Details
Permit
202603268376
Status
issued
Filed
Mar 26, 2026
Permit issued
Mar 27, 2026
Declared cost
$20,000
Address
275 15th Av

to comply with complaint 202650867: remodel one kitchen, restore to previously permitted condition. approx 120 sf.

Open the permit page

$20,000
Mar 11, 2026In progress
issued Mar 2026
45 Dalewood Wyremodel existing kitchen and bathrooms; remove wall at dining; new closet at entry.
Details
Permit
202603117397
Status
issued
Filed
Mar 11, 2026
Permit issued
Mar 23, 2026
Declared cost
$89,000
Address
45 Dalewood Wy

remodel existing kitchen and bathrooms; remove wall at dining; new closet at entry.

Open the permit page

$89,000
Mar 2, 2026In progress
issued Mar 2026
3253 Mission St1. install new heat pump system including ductwork and air outlet. install new kitchen hood exhaust system. install new lighting and receptacles. defer sumbittal. ref #202508072493 & 202212309503
Details
Permit
202603026754
Status
issued
Filed
Mar 2, 2026
Permit issued
Mar 26, 2026
Declared cost
$90,000
Address
3253 Mission St

1. install new heat pump system including ductwork and air outlet. install new kitchen hood exhaust system. install new lighting and receptacles. defer sumbittal. ref #202508072493 & 202212309503

Open the permit page

$90,000
Jan 28, 2026In progress
issued Jun 2026
271 23rd Avrevision to permit 202508294266. at 2nd floor, remove wall at hall way.
Details
Permit
202601284779
Status
issued
Filed
Jan 28, 2026
Permit issued
Jun 5, 2026
Declared cost
$5,000
Address
271 23rd Av

revision to permit 202508294266. at 2nd floor, remove wall at hall way.

Open the permit page

$5,000
Dec 1, 2025In progress
issued Apr 2026
271 23rd Avnew dwelling unit adu per ca government code section 65852.2 at 1/f modify (e) unconditioned space into adu (271a) includes new bedrooms, bathroom, dining and kitchen.
Details
Permit
202511109286
Status
issued
Filed
Dec 1, 2025
Permit issued
Apr 17, 2026
Declared cost
$159,000
Address
271 23rd Av

new dwelling unit adu per ca government code section 65852.2 at 1/f modify (e) unconditioned space into adu (271a) includes new bedrooms, bathroom, dining and kitchen.

Open the permit page

$159,000
Nov 10, 2025Completed
final sign-off May 2026
800 26th Avat 1/f: ref (e) east foundation in kind per plan. add structural sheathing to that wall
Details
Permit
202511109314
Status
complete
Filed
Nov 10, 2025
Permit issued
Dec 9, 2025
Final sign-off
May 18, 2026
Declared cost
$5,000
Address
800 26th Av

at 1/f: ref (e) east foundation in kind per plan. add structural sheathing to that wall

Open the permit page

$5,000
Aug 29, 2025In progress
issued Sep 2025
271 23rd Av1/fl- remodel (e) floor space with (n) walls, door and windows and replace (e) garage door with 9 foot door. 2nd/fl remodel (e) bath and kitchen and add (n) bathroom. no changes to (e) windows on front facade.
Details
Permit
202508294266
Status
issued
Filed
Aug 29, 2025
Permit issued
Sep 24, 2025
Declared cost
$132,000
Address
271 23rd Av

1/fl- remodel (e) floor space with (n) walls, door and windows and replace (e) garage door with 9 foot door. 2nd/fl remodel (e) bath and kitchen and add (n) bathroom. no changes to (e) windows on front facade.

Open the permit page

$132,000
Aug 7, 2025In progress
issued Oct 2025
3253 Mission Strevision to pa 202212309503 reconfigure restaurant layout, including the ada restroom and interior stair case
Details
Permit
202508072493
Status
issued
Filed
Aug 7, 2025
Permit issued
Oct 27, 2025
Address
3253 Mission St

revision to pa 202212309503 reconfigure restaurant layout, including the ada restroom and interior stair case

Open the permit page

Jul 9, 2025Completed
final sign-off Jun 2026
2832 San Bruno Av1)install new kitchen equipment, new plumbing fixtures and new finishes. 2)install new interior partitions and counters. 3)new ada restroom. 4)install a new subpanel of 100 amp upgrade gas meter to 11/4". deffered submittals. exterior signage.
Details
Permit
202507090470
Status
complete
Filed
Jul 9, 2025
Permit issued
Sep 25, 2025
Final sign-off
Jun 1, 2026
Declared cost
$70,000
Address
2832 San Bruno Av

1)install new kitchen equipment, new plumbing fixtures and new finishes. 2)install new interior partitions and counters. 3)new ada restroom. 4)install a new subpanel of 100 amp upgrade gas meter to 11/4". deffered submittals. exterior signage.

Open the permit page

$70,000
Apr 24, 2025Completed
final sign-off Oct 2025
214 Funston Avto comply with nov#202286124, for remove existing unpermitted roof deck, and provide new wood guardrail to prohibit access to existing roof.
Details
Permit
202504245164
Status
complete
Filed
Apr 24, 2025
Permit issued
Sep 25, 2025
Final sign-off
Oct 7, 2025
Declared cost
$20,000
Address
214 Funston Av

to comply with nov#202286124, for remove existing unpermitted roof deck, and provide new wood guardrail to prohibit access to existing roof.

Open the permit page

$20,000
Mar 13, 2025Completed
final sign-off Oct 2025
826 Washington Stto partial abate nov 202302199- to legalize sign b for the arcylic only inside the (e) sign box. share plans with 202503132209/2210/2012. electrify existing sign.
Details
Permit
202503132211
Status
complete
Filed
Mar 13, 2025
Permit issued
Sep 25, 2025
Final sign-off
Oct 9, 2025
Declared cost
$500
Address
826 Washington St

to partial abate nov 202302199- to legalize sign b for the arcylic only inside the (e) sign box. share plans with 202503132209/2210/2012. electrify existing sign.

Open the permit page

$500
Mar 13, 2025Completed
final sign-off Oct 2025
826 Washington Stto partial abate nov 202302199- to include remove sign mounted on building wall at 2nd floor (sign d) and projecting sign (sign c). separte permits to abate the rest of the nov
Details
Permit
202503132209
Status
complete
Filed
Mar 13, 2025
Permit issued
Sep 25, 2025
Final sign-off
Oct 8, 2025
Declared cost
$1,500
Address
826 Washington St

to partial abate nov 202302199- to include remove sign mounted on building wall at 2nd floor (sign d) and projecting sign (sign c). separte permits to abate the rest of the nov

Open the permit page

$1,500
Mar 13, 2025Completed
final sign-off Oct 2025
826 Washington Stto partial abate nov 202302199- to legalize sign a located at side of property single sided non illuminated visible from street. share plans with 202503132209/2210/2011
Details
Permit
202503132212
Status
complete
Filed
Mar 13, 2025
Permit issued
Sep 25, 2025
Final sign-off
Oct 9, 2025
Declared cost
$500
Address
826 Washington St

to partial abate nov 202302199- to legalize sign a located at side of property single sided non illuminated visible from street. share plans with 202503132209/2210/2011

Open the permit page

$500