Accutite Technology Engineering
- Based in
- South San Francisco
- On San Francisco permits
- May 2001 to May 2025
- Last 24 months
- 2 permits filed
44 permits since 2000: 23 completed, 1 in progress, 11 never finaled, 9 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2025 | In progress issued Jul 2025 | 274 Brannan St | single wall ust closure in-place of a stand alone in-ground 2000gal fuel tank.Details
single wall ust closure in-place of a stand alone in-ground 2000gal fuel tank. | $5,000 |
| Mar 3, 2025 | Completed final sign-off May 2026 | 201 Spear St | remove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank.Details
remove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank. | $300,000 |
| Oct 29, 2021 | Never finaled issued Nov 2021, no final | 365 Main St | installation of solenoid, check valve, flow sensor, sight glass & manual by pass line in each existing manifold supply lines in fuel filtration room, betw usts & day tanks ** maher: n/a **Details
installation of solenoid, check valve, flow sensor, sight glass & manual by pass line in each existing manifold supply lines in fuel filtration room, betw usts & day tanks ** maher: n/a ** | $40,000 |
| Sep 15, 2020 | Completed final sign-off Apr 2021 | 2995 Sloat Bl | replacement of existing aboveground convault storage tank.Details
replacement of existing aboveground convault storage tank. | $72,000 |
| Mar 12, 2020 | Never finaled issued Jan 2023, no final | 101 Cargo Wy | above ground fuel tank & 500 gallon propane tank. install (1) ul-2085 ast and (1) ul-644ast. install tank top accessories and tank labels. install vehicle protection k-rails at ul-644 tank. maher naDetails
above ground fuel tank & 500 gallon propane tank. install (1) ul-2085 ast and (1) ul-644ast. install tank top accessories and tank labels. install vehicle protection k-rails at ul-644 tank. maher na | $10,000 |
| May 3, 2019 | Never finaled issued May 2019, no final | 123 Mission St | street spaceDetails
street space | |
| Mar 11, 2019 | Completed final sign-off Apr 2019 | 615 Bay Shore Bl | revision to pa 201902052098. install concrete footing, install (n) automotive lifts, connect to (e) electrical. (e) hvac system to remain.Details
revision to pa 201902052098. install concrete footing, install (n) automotive lifts, connect to (e) electrical. (e) hvac system to remain. | $12,000 |
| Feb 5, 2019 | Completed final sign-off Apr 2019 | 615 Bay Shore Bl | install concrete footing, relocate, reinstall (e) automotive liftsDetails
install concrete footing, relocate, reinstall (e) automotive lifts | $25,000 |
| Oct 31, 2016 | Never finaled issued Dec 2016, no final | 550 Ofarrell St | remove vault & gasoline ast ferom basement of bldg. remove all associated product piping + electrical conduit. remove tank vents, fuel dispensers + piping. restore all disturbed surfaces to match surrounding. n/a maher ordinanceDetails
remove vault & gasoline ast ferom basement of bldg. remove all associated product piping + electrical conduit. remove tank vents, fuel dispensers + piping. restore all disturbed surfaces to match surrounding. n/a maher ordinance | $75,000 |
| Aug 26, 2015 | Never finaled issued Aug 2015, no final | 301 Howard St | installation of new leak detection system for existing disel underground storage tank. maher n/a.Details
installation of new leak detection system for existing disel underground storage tank. maher n/a. | $50,000 |
| Feb 1, 2012 | Expired or cancelled cancelled Jan 2026 | 35 Russia Av | remove underground storage tank.Details
remove underground storage tank. | $9,000 |
| Dec 13, 2011 | Expired or cancelled cancelled Jan 2026 | 1395 Van Ness Av | relocate gasoline dispenser from basement to vehicle ramp at floor 2Details
relocate gasoline dispenser from basement to vehicle ramp at floor 2 | $18,000 |
| Aug 30, 2011 | Expired or cancelled expired May 2013 | 100 Van Ness Av | provide secondary containment for fire pump fuel tank. instrall day tank level gauge and leak sensor.Details
provide secondary containment for fire pump fuel tank. instrall day tank level gauge and leak sensor. | $4,000 |
| May 24, 2011 | Expired or cancelled withdrawn Mar 2018 | 150 Van Ness Av | decommission above ground diesel fuel storage tank. fuel supplied decommissioned emergency generator and ups for vacant data center. no life support systems affected.Details
decommission above ground diesel fuel storage tank. fuel supplied decommissioned emergency generator and ups for vacant data center. no life support systems affected. | $8,000 |
| May 18, 2011 | Completed final sign-off Jul 2011 | 1215 Michigan St | replace spill bucket on underground fuel tank storing diesel fuel-"in-kind". opw-1-2100-evrDetails
replace spill bucket on underground fuel tank storing diesel fuel-"in-kind". opw-1-2100-evr | $3,900 |
| Sep 2, 2010 | Completed final sign-off Jan 2011 | 4742 Mission St | install equipment to extract gasoline containation from soil & ground water, run power to equipment. connect equipment to 5 underground wells. equipment to be housed in shipping container for noise duration of use 1-3 yearsDetails
install equipment to extract gasoline containation from soil & ground water, run power to equipment. connect equipment to 5 underground wells. equipment to be housed in shipping container for noise duration of use 1-3 years | $30,000 |
| Aug 16, 2010 | Completed final sign-off Aug 2010 | 950 Bryant St | replace tank top sump gasket on gasoline underground storage tank due to failing & leak.Details
replace tank top sump gasket on gasoline underground storage tank due to failing & leak. | $19,000 |
| Jul 7, 2010 | Completed final sign-off Jul 2010 | 100 Van Ness Av | replace diesel fuel piping from ust sump to building. use existing secondary piping as conduit to install apt coaxial supply and return lines. no excavation. no concrete. use existing sumps for accessDetails
replace diesel fuel piping from ust sump to building. use existing secondary piping as conduit to install apt coaxial supply and return lines. no excavation. no concrete. use existing sumps for access | $14,000 |
| May 7, 2010 | Completed final sign-off Jun 2010 | 501 Tunnel Av | replace spill bucket on underground storage tanl storing diesel- out doorDetails
replace spill bucket on underground storage tanl storing diesel- out door | $1,500 |
| Apr 13, 2010 | Completed final sign-off Jul 2010 | 1001 Potrero Av | replace spill bucket on underground storage tank storing diesel fuel.Details
replace spill bucket on underground storage tank storing diesel fuel. | $1,500 |
| Apr 13, 2010 | Completed final sign-off Apr 2010 | 20 Thomas More Wy | replace spill bucket on underground storage tank storage diesel fuelDetails
replace spill bucket on underground storage tank storage diesel fuel | $1,500 |
| Jan 26, 2010 | Completed final sign-off May 2010 | 333 Ofarrell St | remove old diesel fuel piping and replace with new double walled fiberglass piping from tank top sump to tie in point outside building. no inside workDetails
remove old diesel fuel piping and replace with new double walled fiberglass piping from tank top sump to tie in point outside building. no inside work | $67,223 |
| Jan 22, 2010 | Expired or cancelled expired May 2013 | 45 Castro St | remove old supply & return lines from (e) secondary lines & use (e) secondary as a conduit to pull new co-axial piping, no excavation or breaking of concrete. dispose old piping as hazardous waster per codeDetails
remove old supply & return lines from (e) secondary lines & use (e) secondary as a conduit to pull new co-axial piping, no excavation or breaking of concrete. dispose old piping as hazardous waster per code | $15,000 |
| Jul 1, 2009 | Never finaled issued Jan 2010, no final | 1 Zoo Rd | removing (e) primary diesel piping for old system and day tank grout and leave 2nd. piping. install new 1,000 gal. above ground storage tank for (e) diesel generator with accompaning parts.Details
removing (e) primary diesel piping for old system and day tank grout and leave 2nd. piping. install new 1,000 gal. above ground storage tank for (e) diesel generator with accompaning parts. | $8,000 |
| Jun 9, 2009 | Completed final sign-off Jun 2009 | 443 Divisadero St | revision to pa# 2008.11.25.7346. as built condition to show diesel vent pipe proper placement and enclosure orientation changeDetails
revision to pa# 2008.11.25.7346. as built condition to show diesel vent pipe proper placement and enclosure orientation change | |
| May 8, 2009 | Never finaled issued May 2009, no final | 425 Market St | replace diesel fuel line ( return) from electric generator to fuel tank rest per sb 989Details
replace diesel fuel line ( return) from electric generator to fuel tank rest per sb 989 | $7,000 |
| Mar 25, 2009 | Completed final sign-off Aug 2009 | 1215 Michigan St | evr phase ll upgrade using veeder root carbon canister and 1 dispenser replacementDetails
evr phase ll upgrade using veeder root carbon canister and 1 dispenser replacement | $23,796 |
| Mar 5, 2009 | Completed final sign-off May 2009 | 1490 Ocean Av | evr phase ii using veeder root carbon canister with isd at cmu wall at parking lot.Details
evr phase ii using veeder root carbon canister with isd at cmu wall at parking lot. | $17,222 |
| Feb 4, 2009 | Completed final sign-off May 2009 | 3898 California St | eur phase 2 upgrade using veeder root carbon. canister with isd (in-station diagnostics). replace 4 gilbarco dispensers with new gilbarco encore 500s dispensers. under separate.Details
eur phase 2 upgrade using veeder root carbon. canister with isd (in-station diagnostics). replace 4 gilbarco dispensers with new gilbarco encore 500s dispensers. under separate. | $102,000 |
| Feb 4, 2009 | Expired or cancelled withdrawn Aug 2017 | 1490 Ocean Av | need structural plan showing 2 hour fire rated wall connection to extg wall.Details
need structural plan showing 2 hour fire rated wall connection to extg wall. | $17,222 |
| Feb 4, 2009 | Completed final sign-off Jun 2009 | 5098 Mission St | evr phase 2 upgrade using veeder root carbon canister with isdDetails
evr phase 2 upgrade using veeder root carbon canister with isd | $33,038 |
| Dec 16, 2008 | Completed final sign-off May 2009 | 301 Claremont Bl | install evr phase ii equipment per carb requirements, includes installation of veeder root carbon canisterDetails
install evr phase ii equipment per carb requirements, includes installation of veeder root carbon canister | $24,000 |
| Dec 16, 2008 | Completed final sign-off Jun 2009 | 5898 Mission St | install evr phase ii equipment per carb requirements, includes installation of veeder root carbon cannisterDetails
install evr phase ii equipment per carb requirements, includes installation of veeder root carbon cannister | $22,000 |
| Nov 25, 2008 | Completed final sign-off May 2009 | 443 Divisadero St | install evr phase ii equipment per carb requirements, included installation of healy tank.Details
install evr phase ii equipment per carb requirements, included installation of healy tank. | $30,000 |
| Apr 22, 2008 | Never finaled issued Apr 2008, no final | 50 Fremont St | change existing total containment pipe to 1 1/2 in coaxial apt pipe. will not break concreteDetails
change existing total containment pipe to 1 1/2 in coaxial apt pipe. will not break concrete | $17,000 |
| Aug 17, 2007 | Never finaled issued Oct 2007, no final | 2845 Cesar Chavez St | install healy clean air separator. 4 new dispensers. remove existing 2 dispensors. break concrete to expose underground lines, add new dispenser lines along with healy fittings. cover and reconcrete. non structural workDetails
install healy clean air separator. 4 new dispensers. remove existing 2 dispensors. break concrete to expose underground lines, add new dispenser lines along with healy fittings. cover and reconcrete. non structural work | $75,000 |
| Aug 15, 2007 | Never finaled issued Aug 2007, no final | 4769 Mission St | install dual phase(grdwater&soil vapor)remediation sys as per health dept local oversight program request.complete piping/conduit fr (e)monitoring well in sidewalk to vapor extraction&effluent treatment sys.install blower&related equip.tie-in to sanitory sewer for treated grdwater discharge........Details
install dual phase(grdwater&soil vapor)remediation sys as per health dept local oversight program request.complete piping/conduit fr (e)monitoring well in sidewalk to vapor extraction&effluent treatment sys.install blower&related equip.tie-in to sanitory sewer for treated grdwater discharge........ | $60,000 |
| Mar 19, 2007 | Completed final sign-off Nov 2007 | 135 Shotwell St | install replacement 500-gallon waste oil tank according to manufacturer's specifications. connect (e) compressed air source to tank pump. anchor tank down through six (6) anchor bolt hole locations. install two (2) collision protection bollards by way of burying them in concrete.Details
install replacement 500-gallon waste oil tank according to manufacturer's specifications. connect (e) compressed air source to tank pump. anchor tank down through six (6) anchor bolt hole locations. install two (2) collision protection bollards by way of burying them in concrete. | $5,000 |
| Oct 15, 2004 | Never finaled issued Nov 2004, no final | 1095 Indiana St | repair motor oil, automatic transmission fluid lines, telephone lines, & eled lines, at muni woods fDetails
repair motor oil, automatic transmission fluid lines, telephone lines, & eled lines, at muni woods f | |
| Jan 2, 2004 | Completed final sign-off Jan 2004 | 2575 Marin St | rev. to pa#2003/10/30/9050-concrete foundation padDetails
rev. to pa#2003/10/30/9050-concrete foundation pad | |
| Apr 23, 2002 | Expired or cancelled expired Jan 2005 | 550 Townsend St | excavateDetails
excavate | $20,000 |
| Jan 30, 2002 | Expired or cancelled expired Jun 2010 | 2175 Market St | repairs to underground sumps, upgrade dispensers & related piping connectionDetails
repairs to underground sumps, upgrade dispensers & related piping connection | $40,000 |
| Jan 30, 2002 | Expired or cancelled expired Mar 2007 | 2559 Van Ness Av | repairs to underground pumps, upgrade dispensers & relacted piping connectionsDetails
repairs to underground pumps, upgrade dispensers & relacted piping connections | $40,000 |
| May 25, 2001 | Completed final sign-off Nov 2001 | 2949 18th St | removal of underground storage , fuel/oil under permit from sf health depDetails
removal of underground storage , fuel/oil under permit from sf health dep | $15,000 |