Ac And Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 11 permits filed
321 permits since 2000: 248 completed, 7 in progress, 19 never finaled, 47 expired or cancelled.
Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 321.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2026 | Completed final sign-off Sep 2026 | 618 Natoma St | to obtain final inspection for work approved under pa# 201510230711 & 201302089819. all work is completeDetails
to obtain final inspection for work approved under pa# 201510230711 & 201302089819. all work is complete | |
| Aug 19, 2026 | Completed final sign-off Aug 2026 | 618 Natoma St | per nov 202660565 item #2: repair rear deck/stair assembely less then 50% and replace w/ like kind. comply with nov #202657769,202660482,202660567,202660551.Details
per nov 202660565 item #2: repair rear deck/stair assembely less then 50% and replace w/ like kind. comply with nov #202657769,202660482,202660567,202660551. | $3,900 |
| Jun 8, 2026 | In progress issued Jun 2026 | 3159 16th St | recommencement and completion of work approved under pa# 202504245138Details
recommencement and completion of work approved under pa# 202504245138 | $15,000 |
| May 14, 2026 | Completed final sign-off May 2026 | 30 Sycamore St | to comply with nov 202650704 #10: install new grab bars for 4 toilets and 4 showers on the 1st and 2nd floors.Details
to comply with nov 202650704 #10: install new grab bars for 4 toilets and 4 showers on the 1st and 2nd floors. | $2,000 |
| Mar 13, 2026 | Completed final sign-off Apr 2026 | 518 Anza St | 2/f -open walls as needed to allow insulation to be blown in walls and ceiling, bathroom remodel, ceiling fan, circuits, vent in exterior, remove and intsall shut off under sink.Details
2/f -open walls as needed to allow insulation to be blown in walls and ceiling, bathroom remodel, ceiling fan, circuits, vent in exterior, remove and intsall shut off under sink. | $10,000 |
| Oct 23, 2025 | Completed final sign-off Jun 2026 | 630 Jones St | legalize water closet (toilet and sink) at existing ground level storage space. to comply with nov #202182155Details
legalize water closet (toilet and sink) at existing ground level storage space. to comply with nov #202182155 | $10,000 |
| Jul 25, 2025 | In progress filed Jul 2025, not yet issued | 1400 Lombard St | install power door operator at front enter door.Details
install power door operator at front enter door. | $5,000 |
| Jul 25, 2025 | In progress filed Jul 2025, not yet issued | 1408 Lombard St | install power door operator at front enter door.Details
install power door operator at front enter door. | $5,000 |
| Apr 24, 2025 | In progress issued Apr 2025 | 1208 Jones St | to repair and replace less than 50% of the stairs/landing assembly in kind,at lightwell. using like in kind material (redwood or pressure treated). all work in kind.Details
to repair and replace less than 50% of the stairs/landing assembly in kind,at lightwell. using like in kind material (redwood or pressure treated). all work in kind. | $14,000 |
| Apr 24, 2025 | In progress issued Apr 2025 | 3159 16th St | comply with sf health dept correction list for bar/eating prep.sheetrock ceiling with 2 sheets of 5/8" type x s.r. for fire rating separation to living spaces. add utility sink adjacent to bar- 30 amp circuit for #8 approval perfect fry equipmentDetails
comply with sf health dept correction list for bar/eating prep.sheetrock ceiling with 2 sheets of 5/8" type x s.r. for fire rating separation to living spaces. add utility sink adjacent to bar- 30 amp circuit for #8 approval perfect fry equipment | $20,000 |
| Feb 26, 2025 | Completed final sign-off Mar 2025 | 1821 Hyde St | stucco repair in kind per leaks in unit #4 around one vinly window. remove window, waterproof and reinstall window. not visible to street.Details
stucco repair in kind per leaks in unit #4 around one vinly window. remove window, waterproof and reinstall window. not visible to street. | $3,500 |
| Aug 2, 2024 | Completed final sign-off Sep 2024 | 23 Los Palmos Dr | repairs to existing wood deck at rear of building(less than 50%). replace guardrail in kind, install structural upgrades. replace dryrot, horizontal tiedown.Details
repairs to existing wood deck at rear of building(less than 50%). replace guardrail in kind, install structural upgrades. replace dryrot, horizontal tiedown. | $7,500 |
| Feb 21, 2024 | In progress issued Feb 2024 | 2757 23rd St | revision pa#: 202312142544 and 202402015095 add: demo lathe+ plaster walls and ceiling thru out apt and replace with sheetrock 5/6 - tapet model (no change pn original layout)Details
revision pa#: 202312142544 and 202402015095 add: demo lathe+ plaster walls and ceiling thru out apt and replace with sheetrock 5/6 - tapet model (no change pn original layout) | |
| Feb 9, 2024 | Completed final sign-off Mar 2024 | 753 Webster St | for nov 202317310, apt#: d; look for leaks from above deck and wall per two apartments above. per item#: 2, 3, and 4. provide handrails, and repair damage walls.Details
for nov 202317310, apt#: d; look for leaks from above deck and wall per two apartments above. per item#: 2, 3, and 4. provide handrails, and repair damage walls. | $2,000 |
| Feb 1, 2024 | In progress issued Feb 2024 | 2757 23rd St | replace lower unit kitchen, remove existing single full bathroom and create two smaller bathrooms with showers. relocate the laundry (washer/dryer) to hallDetails
replace lower unit kitchen, remove existing single full bathroom and create two smaller bathrooms with showers. relocate the laundry (washer/dryer) to hall | $35,000 |
| Jan 9, 2024 | Completed final sign-off Mar 2024 | 141 Morse St | new dormer at north elevation to (e) attic space per nov # 202311713Details
new dormer at north elevation to (e) attic space per nov # 202311713 | $6,000 |
| Dec 14, 2023 | Completed final sign-off Dec 2023 | 2050 Lyon St | unit 1, remove + provde and install 6 window sash units, 4 on lyon/washington side. 1 in bathroom. 1 in rear bedroom. replacement to be wood/acceptable per code with proper galss rating.Details
unit 1, remove + provde and install 6 window sash units, 4 on lyon/washington side. 1 in bathroom. 1 in rear bedroom. replacement to be wood/acceptable per code with proper galss rating. | $4,800 |
| Dec 14, 2023 | Completed final sign-off May 2024 | 2757 23rd St | 1 kitchen and 1 bathroom remodel. no alteration of wall, window or door.Details
1 kitchen and 1 bathroom remodel. no alteration of wall, window or door. | $50,000 |
| Nov 29, 2023 | Completed final sign-off Sep 2024 | 2050 Lyon St | unit 1: (e) bathroom remodel: extend into (e) closet space to widen shower enclosureDetails
unit 1: (e) bathroom remodel: extend into (e) closet space to widen shower enclosure | $12,000 |
| Oct 17, 2023 | Completed final sign-off Dec 2023 | 2 Coleridge St | revision to 202305127708 to replace rear of building wood stairs serving as required second means of egress "to reflect as-is condition" that was incorrectly drafted.Details
revision to 202305127708 to replace rear of building wood stairs serving as required second means of egress "to reflect as-is condition" that was incorrectly drafted. | |
| Sep 20, 2023 | Completed final sign-off Dec 2024 | 2664 22nd St | restore unwarrented rooms at garage level (behind garage to storage space).Details
restore unwarrented rooms at garage level (behind garage to storage space). | $2,000 |
| Aug 25, 2023 | Completed final sign-off Oct 2023 | 2651 22nd St | repair/replace corner of agrage door (large) and replace 30 x 84 x 1 3/4 door. in like kind. vehicle struck the corner.Details
repair/replace corner of agrage door (large) and replace 30 x 84 x 1 3/4 door. in like kind. vehicle struck the corner. | $10,000 |
| Aug 16, 2023 | Completed final sign-off Aug 2023 | 1037 Stanyan St | to repair/replace dry rot to staircase (exterior) and landings. leass than 50% and replace with redwood or pressure treated in like kind.Details
to repair/replace dry rot to staircase (exterior) and landings. leass than 50% and replace with redwood or pressure treated in like kind. | $4,000 |
| Jul 5, 2023 | Completed final sign-off Jul 2023 | 642 Central Av | unit#3: remove, provide, and install (5) double hung tilt packs. (2) in front - (2) casements and (2) double hung tilt packs in rear. all sash windows.Details
unit#3: remove, provide, and install (5) double hung tilt packs. (2) in front - (2) casements and (2) double hung tilt packs in rear. all sash windows. | $10,000 |
| Jun 6, 2023 | Completed final sign-off Aug 2023 | 2760 Polk St | to repair/replace in like kind per auto that caused damage to garage door. north side including stucco that surrounds the garage door- this includes framing sheetrock and repair of auto door opener.Details
to repair/replace in like kind per auto that caused damage to garage door. north side including stucco that surrounds the garage door- this includes framing sheetrock and repair of auto door opener. | $10,000 |
| May 12, 2023 | Completed final sign-off Dec 2023 | 2 Coleridge St | replace in-kind rear wood stairs serviing as second means of egress complying with complaint#: 202299746Details
replace in-kind rear wood stairs serviing as second means of egress complying with complaint#: 202299746 | $15,000 |
| May 4, 2023 | Completed final sign-off Oct 2023 | 1037 Stanyan St | check for dry rot exposed at rear porch (where washer and dry are located), ceiling, and two walls - open floor and check joists. replace with like kind. provide new insulation, sheetrock, flooring and paint.Details
check for dry rot exposed at rear porch (where washer and dry are located), ceiling, and two walls - open floor and check joists. replace with like kind. provide new insulation, sheetrock, flooring and paint. | $12,800 |
| Apr 14, 2023 | Completed final sign-off Mar 2024 | 4465 Mission St | tenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867).Details
tenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867). | $15,000 |
| Apr 7, 2023 | Completed final sign-off Jul 2023 | 1590 Sutter St | unit# 211: provide accessibility upgrade to remove architectural barrier for equal disability access. proposed interior upgrade shall be limited to hotel unit #211, as represented on sht a1.Details
unit# 211: provide accessibility upgrade to remove architectural barrier for equal disability access. proposed interior upgrade shall be limited to hotel unit #211, as represented on sht a1. | $35,000 |
| Mar 15, 2023 | Completed final sign-off Apr 2023 | 72 Fountain St | to comply with nov 202301989 item 5: handrails repair less than 50% & replace with like in-kind.Details
to comply with nov 202301989 item 5: handrails repair less than 50% & replace with like in-kind. | $590 |
| Jan 17, 2023 | Completed final sign-off Jan 2023 | 2730 Oakdale Av | replacing damaged exterior metal building panels, replace insolation replace interior sheet rock, paint repairss, making reparis for violation #202294074; street facing.Details
replacing damaged exterior metal building panels, replace insolation replace interior sheet rock, paint repairss, making reparis for violation #202294074; street facing. | $9,185 |
| Nov 29, 2022 | Completed final sign-off Jan 2023 | 185 Sussex St | compliance to nov 2022-92033 to reinforce (e) rear of building decks to guardrail and horizontal tiesDetails
compliance to nov 2022-92033 to reinforce (e) rear of building decks to guardrail and horizontal ties | $10,000 |
| Sep 26, 2022 | Completed final sign-off Dec 2022 | 2110 33rd Av | remove existing roof covering - remove any rot to existing plywood. replace with new and provide install. new db ten flat modified rubber bitumen to comply with complaint #202296183.Details
remove existing roof covering - remove any rot to existing plywood. replace with new and provide install. new db ten flat modified rubber bitumen to comply with complaint #202296183. | $14,000 |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 1016 Potrero Av | apts 5 + 6: close up/patch walls 40sf per plumbing repairs in bathroom walls. ref pp20220819623. to comply with complaint 202294026.Details
apts 5 + 6: close up/patch walls 40sf per plumbing repairs in bathroom walls. ref pp20220819623. to comply with complaint 202294026. | $2,700 |
| Jun 24, 2022 | Completed final sign-off Jun 2022 | 4579 Mission St | for administrative purpose to verify building use as one dwelling unit at 2nd floor and commercial space at 1st floor per city records (assessor's, water dept and sfdbi site visit). no work under this permit.Details
for administrative purpose to verify building use as one dwelling unit at 2nd floor and commercial space at 1st floor per city records (assessor's, water dept and sfdbi site visit). no work under this permit. | |
| Jun 24, 2022 | Completed final sign-off Jun 2022 | 4581 Mission St | rear unit #b: for administrative purose to verify building use as one dwelling unit per city records (assessors, water dept, sfdbi site visit).Details
rear unit #b: for administrative purose to verify building use as one dwelling unit per city records (assessors, water dept, sfdbi site visit). | |
| Jun 16, 2022 | Completed final sign-off Jun 2022 | 4579 Mission St | per nov #202290905 per item #2. to comply with nov. replace bath window frame.Details
per nov #202290905 per item #2. to comply with nov. replace bath window frame. | $700 |
| Dec 29, 2021 | Completed final sign-off Mar 2022 | 2965 Sacramento St | unit 304: remodel one kitchen and one bathroom. provide & install kitchen cabinets with countertop with new fixtures, new bathtub, vanity and associated plumbing- new sub-panel with lights. non structural, in kind.Details
unit 304: remodel one kitchen and one bathroom. provide & install kitchen cabinets with countertop with new fixtures, new bathtub, vanity and associated plumbing- new sub-panel with lights. non structural, in kind. | $38,000 |
| Dec 29, 2021 | Completed final sign-off Jun 2022 | 900 Bush St | remove provide install new kitchen cabinets, countertop, sink, small appliance- remove and provide install #2 new lavatory faucets. in kindDetails
remove provide install new kitchen cabinets, countertop, sink, small appliance- remove and provide install #2 new lavatory faucets. in kind | $28,000 |
| Nov 22, 2021 | Completed final sign-off Jan 2022 | 1520 15th St | per nov# 202182526 item #4 to replace in like-kind less than 50% to stair/hand rail accessibleDetails
per nov# 202182526 item #4 to replace in like-kind less than 50% to stair/hand rail accessible | $3,800 |
| Oct 15, 2021 | Completed final sign-off Dec 2021 | 46 Sumner St | to comply with physical inspection report cc-8346.Details
to comply with physical inspection report cc-8346. | $2,000 |
| Sep 24, 2021 | Completed final sign-off Oct 2021 | 500 Fillmore St | prior work performed was to correct damage caused by fire- repaired ceilings and walls. renewal of permit#201812208911.Details
prior work performed was to correct damage caused by fire- repaired ceilings and walls. renewal of permit#201812208911. | |
| Jul 20, 2021 | Completed final sign-off Aug 2021 | 2965 Sacramento St | unit #102: remodel kitchen and bathroo, provide and install kitchen cabinets with counter top d/w, new fixtures, new bath tops vanity and associated plumbing new sub pannel with can lights thru outDetails
unit #102: remodel kitchen and bathroo, provide and install kitchen cabinets with counter top d/w, new fixtures, new bath tops vanity and associated plumbing new sub pannel with can lights thru out | $38,000 |
| Jun 7, 2021 | Completed final sign-off Aug 2021 | 2664 22nd St | to comply with nov# 202022503 and 20190781. removal of hot water structure and handrail repair on rear deck. move dryer vent 3 ft away from property line. plumging permit was pull sep.Details
to comply with nov# 202022503 and 20190781. removal of hot water structure and handrail repair on rear deck. move dryer vent 3 ft away from property line. plumging permit was pull sep. | $1,000 |
| May 14, 2021 | Completed final sign-off Jun 2021 | 2965 Sacramento St | unit 203: remodel one kitchen & one bathroom. provide & install kitchen & cabinets with countertop with new fixture. new bathtub, vanity and associated plumbing. new subpanel with light. non structural.Details
unit 203: remodel one kitchen & one bathroom. provide & install kitchen & cabinets with countertop with new fixture. new bathtub, vanity and associated plumbing. new subpanel with light. non structural. | $38,000 |
| Jan 11, 2021 | Completed final sign-off Jul 2021 | 2825 23rd St | remodel kitchen & bahtroom like for like. new cabinets, countertop, sink, faucet, dish/washer. bathroom - new tub, faucet, toilet.Details
remodel kitchen & bahtroom like for like. new cabinets, countertop, sink, faucet, dish/washer. bathroom - new tub, faucet, toilet. | $39,000 |
| Jan 11, 2021 | Completed final sign-off Mar 2021 | 2965 Sacramento St | unit #205: remodel kitchen & bahtroom. provide 7 install new cabinets, countertop, sink, faucet, new fixtures. bathroom - new tub, vanity, & associated plumbing. new subpanel with can lights throughout.Details
unit #205: remodel kitchen & bahtroom. provide 7 install new cabinets, countertop, sink, faucet, new fixtures. bathroom - new tub, vanity, & associated plumbing. new subpanel with can lights throughout. | $38,000 |
| Nov 10, 2020 | Completed final sign-off Jan 2022 | 637 Masonic Av | revision to no plan pa# 202006299272: relocate kitchen in 2nd fl unit.Details
revision to no plan pa# 202006299272: relocate kitchen in 2nd fl unit. | $15,000 |
| Nov 7, 2020 | Completed final sign-off Aug 2022 | 802 Potrero Av | partial demo of (e) rear porch to install sauna w/ access stairs - all interior work. enlarge rear facade window - not visible from street.Details
partial demo of (e) rear porch to install sauna w/ access stairs - all interior work. enlarge rear facade window - not visible from street. | $8,900 |
| Oct 1, 2020 | Completed final sign-off Nov 2020 | 2965 Sacramento St | unit 201: remodel kitchen & bathroom, provide/install kitchen cabinets w/countertop, d/w, new fixtures, new bath tub vanity, associated plumbing, new subpanel w/can lights throughoutDetails
unit 201: remodel kitchen & bathroom, provide/install kitchen cabinets w/countertop, d/w, new fixtures, new bath tub vanity, associated plumbing, new subpanel w/can lights throughout | $38,000 |
| Sep 30, 2020 | Completed final sign-off Jan 2021 | 1181 Treat Av | reroofing 1181-83 treat ave.Details
reroofing 1181-83 treat ave. | $12,000 |
| Sep 28, 2020 | Completed final sign-off Jan 2021 | 2225 23rd St | bathroom remodel in-kind. demo tub, sink, tiles. install new tub, lav cabinet, new tiles surround. fan unitDetails
bathroom remodel in-kind. demo tub, sink, tiles. install new tub, lav cabinet, new tiles surround. fan unit | $14,000 |
| Jun 29, 2020 | Completed final sign-off Jan 2022 | 637 Masonic Av | remodel kitchen in kind, repair wall dryrot in kitchen & bathroom area. work will be done on 2nd floorDetails
remodel kitchen in kind, repair wall dryrot in kitchen & bathroom area. work will be done on 2nd floor | $15,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2020 | 1034 14th St | r & p plywood on roof 1/2 cd x w. 8d common at 4" e.n.Details
r & p plywood on roof 1/2 cd x w. 8d common at 4" e.n. | $4,000 |
| Feb 18, 2020 | Completed final sign-off Apr 2020 | 2050 Lyon St | #2: remodel bathroom: provide & install new toilet, lav sink, tub fixture and tile on floor & wall of tub surround, fan unit. gas water & drain. provide & install new plumbing & electrical for washer dryer in dining room.Details
#2: remodel bathroom: provide & install new toilet, lav sink, tub fixture and tile on floor & wall of tub surround, fan unit. gas water & drain. provide & install new plumbing & electrical for washer dryer in dining room. | $19,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2020 | 38 Conrad St | repair/ replace in kind of front stair assembly - less than 50%.Details
repair/ replace in kind of front stair assembly - less than 50%. | $3,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2020 | 1034 14th St | reroofingDetails
reroofing | $11,000 |
| Oct 23, 2019 | Completed final sign-off Feb 2020 | 1331 Thomas Av | repair damage to corner of building. stucco reair in-kind from vehicle damage striking corner of garage. no changes to existing front entry.Details
repair damage to corner of building. stucco reair in-kind from vehicle damage striking corner of garage. no changes to existing front entry. | $10,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 881 Guerrero St | in kind remodel kitchen cabinets & skik & countertop- new electric stove. remodel partial bathroom. reconfigure lav sink. electrical and plumbing as needed.Details
in kind remodel kitchen cabinets & skik & countertop- new electric stove. remodel partial bathroom. reconfigure lav sink. electrical and plumbing as needed. | $35,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2019 | 625 Scott St | apt 206: remodel kitchen with new cabinets, countertop, sink, sheetrock. repair per new utilities and tile. no changes to wall configuration.Details
apt 206: remodel kitchen with new cabinets, countertop, sink, sheetrock. repair per new utilities and tile. no changes to wall configuration. | $20,000 |
| May 15, 2019 | Completed final sign-off May 2019 | 445 Scott St | unit # 2: lightwell on 1st floor: repair dry rot to the lid as needed- 7'x14' and repair /replace in kind/ non street facing.Details
unit # 2: lightwell on 1st floor: repair dry rot to the lid as needed- 7'x14' and repair /replace in kind/ non street facing. | $4,000 |
| May 8, 2019 | Completed final sign-off May 2019 | 2654 22nd St | repair/replace less than 50% of rear stair assembly, to match in material (wood) and design.Details
repair/replace less than 50% of rear stair assembly, to match in material (wood) and design. | $2,950 |
| May 8, 2019 | Expired or cancelled cancelled Oct 2019 | 455 Scott St | repair lightwell (7'x14') on 1/f & repair dryrot to lid as needed, repair in-kind, non street facingDetails
repair lightwell (7'x14') on 1/f & repair dryrot to lid as needed, repair in-kind, non street facing | $4,000 |
| Mar 18, 2019 | Completed final sign-off Jun 2019 | 3655 16th St | per nov# 201919191 items #4: upon investigation if necessary replace flooring. item 6. dryrot as needed. pillars at backroof stairway. #8. replace window in middle & rear 3653 & 3655. replace like kind less than 50%.Details
per nov# 201919191 items #4: upon investigation if necessary replace flooring. item 6. dryrot as needed. pillars at backroof stairway. #8. replace window in middle & rear 3653 & 3655. replace like kind less than 50%. | $12,000 |
| Feb 21, 2019 | Completed final sign-off Apr 2019 | 3191 Washington St | revision to 201709066971 clarification of detail 4/s3 with new detail 1/s2 hardy frame revisde to hfx-24x10Details
revision to 201709066971 clarification of detail 4/s3 with new detail 1/s2 hardy frame revisde to hfx-24x10 | |
| Aug 27, 2018 | Expired or cancelled expired Aug 2026 | 5 Santa Rosa Av | to comply with nov201879891: all units. ref pa#201701177299.Details
to comply with nov201879891: all units. ref pa#201701177299. | |
| Jun 29, 2018 | Completed final sign-off Jul 2018 | 1131 Treat Av | repair in lik ind of rear stairs less than 50%. comply with nov 201870702 elec l/f front stairs install #6 comply with nove 201870762Details
repair in lik ind of rear stairs less than 50%. comply with nov 201870702 elec l/f front stairs install #6 comply with nove 201870762 | $5,000 |
| Jun 29, 2018 | Completed final sign-off Aug 2018 | 312 Duncan St | repair of west wall of garage per dryrot siding and framing in kind. less than 200 sq ftDetails
repair of west wall of garage per dryrot siding and framing in kind. less than 200 sq ft | $8,000 |
| Jun 29, 2018 | Completed final sign-off Mar 2021 | 2725 Broadway | repair stucco wall on west side of 1st level. replace hw heater, repair in kind 22f sf less than , replace 5 toilets, and repair lav faucets, add 4 cans behind kitchen on 1st lvelDetails
repair stucco wall on west side of 1st level. replace hw heater, repair in kind 22f sf less than , replace 5 toilets, and repair lav faucets, add 4 cans behind kitchen on 1st lvel | $20,000 |
| May 4, 2018 | Never finaled issued May 2018, no final | 1511 Gough St | replace counter top, replace bath vanity, toilet and tub. paint apartment, replace fan unit if necessary n/a maherDetails
replace counter top, replace bath vanity, toilet and tub. paint apartment, replace fan unit if necessary n/a maher | $25,000 |
| Mar 6, 2018 | Completed final sign-off Apr 2018 | 625 Scott St | unit 303: kitchen remodel, new cabinets, counter top, gas line per stove; bathroom: new toilet & vanity, new bath fan unit. no new wall oralteration of any (e) walls.Details
unit 303: kitchen remodel, new cabinets, counter top, gas line per stove; bathroom: new toilet & vanity, new bath fan unit. no new wall oralteration of any (e) walls. | $15,000 |
| Dec 21, 2017 | Completed final sign-off Jan 2019 | 800 Potrero Av | residential remodel maher not reqDetails
residential remodel maher not req | $12,000 |
| Oct 16, 2017 | Completed final sign-off Nov 2017 | 1514 Washington St | per notice of viol. 201653372 #6, #201652051 #2,201625773 #2, repair, replace provide or repair eletric heaters/trac light fixture per nov. #201625773 #3. provide t and p valve with drain - scrapping per nov #201697161#9, #201625773.. bathroom, remove tub and toilet and lav sink to allow floor toDetails
per notice of viol. 201653372 #6, #201652051 #2,201625773 #2, repair, replace provide or repair eletric heaters/trac light fixture per nov. #201625773 #3. provide t and p valve with drain - scrapping per nov #201697161#9, #201625773.. bathroom, remove tub and toilet and lav sink to allow floor to | $15,000 |
| Sep 21, 2017 | Completed final sign-off Oct 2017 | 731 Florida St | repair of roof deck, less than 50%Details
repair of roof deck, less than 50% | $1,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 4579 Mission St | to comply with his nov 201791241 dated 7/11/2017, item 2-handrails; item 3-window repair/replace kitchen window not visible from street. max u-factor 0.32Details
to comply with his nov 201791241 dated 7/11/2017, item 2-handrails; item 3-window repair/replace kitchen window not visible from street. max u-factor 0.32 | $3,500 |
| Sep 21, 2017 | Completed final sign-off Oct 2017 | 731 Florida St | reroofingDetails
reroofing | $20,000 |
| Sep 20, 2017 | Completed final sign-off Nov 2017 | 1127 Treat Av | repair/replacement in-kind of existing wood stairs at rear of building, less than 50%; no other work. not visible from street or back of building.Details
repair/replacement in-kind of existing wood stairs at rear of building, less than 50%; no other work. not visible from street or back of building. | $5,000 |
| Sep 6, 2017 | Completed final sign-off Apr 2019 | 3191 Washington St | compliance w/ mandatory seismic retrofit program per 2016 sfebc sec 4d & 2016 cebc appx a-4Details
compliance w/ mandatory seismic retrofit program per 2016 sfebc sec 4d & 2016 cebc appx a-4 | $65,000 |
| Aug 1, 2017 | Completed final sign-off Aug 2017 | 2543 Larkin St | re-roofingDetails
re-roofing | $25,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 2543 Larkin St | remodel of kitchen: replace cabinet and countertop, sink, bathroom: replace toilet and lav sink - new plumbing fixtures. no walls moved, removed, added or installed. all (e) layout to remain unchangedDetails
remodel of kitchen: replace cabinet and countertop, sink, bathroom: replace toilet and lav sink - new plumbing fixtures. no walls moved, removed, added or installed. all (e) layout to remain unchanged | $25,000 |
| Jun 12, 2017 | Completed final sign-off Jun 2017 | 753 Webster St | to comply with nov#20176882 line items #2 & #3: repair stair/deck less than 50% like in-kind. add handrails as needed; at rear of building.Details
to comply with nov#20176882 line items #2 & #3: repair stair/deck less than 50% like in-kind. add handrails as needed; at rear of building. | $12,000 |
| May 26, 2017 | Completed final sign-off Aug 2017 | 625 Scott St | kitchen remodel, new cabinets, countertop, sink, sheetrock, repair per new utilities and tile. no change to wall locationsDetails
kitchen remodel, new cabinets, countertop, sink, sheetrock, repair per new utilities and tile. no change to wall locations | $20,000 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 2543 Larkin St | replacement of all windows in upper flat and all street-visible on lower flat. all front windows to be wood or aluminum-clad wood.Details
replacement of all windows in upper flat and all street-visible on lower flat. all front windows to be wood or aluminum-clad wood. | $25,000 |
| Apr 5, 2017 | Completed final sign-off May 2017 | 1127 Treat Av | repair/reduce less than 50% in like-kind. rear stairs.Details
repair/reduce less than 50% in like-kind. rear stairs. | $6,000 |
| Apr 5, 2017 | Completed final sign-off May 2017 | 5311 Mission St | to satisfy nov# 201768001. item #2, #7, #8, #10, #11, #13. #2 remove fiberglass awning & bring guardrails to code. #7 pull plumbing permit to satisfy nov# 201765601: #2, #4, #6, #7, #9. #2 remove unapproved walls, #4, #5 pull electrical permitDetails
to satisfy nov# 201768001. item #2, #7, #8, #10, #11, #13. #2 remove fiberglass awning & bring guardrails to code. #7 pull plumbing permit to satisfy nov# 201765601: #2, #4, #6, #7, #9. #2 remove unapproved walls, #4, #5 pull electrical permit | $4,000 |
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 1511 Gough St | apt 301: replace kitchen cabinets - replace bath vanity, toilet, new fan unit. paint apartment - rugs & lino & tile on third floor. no structural work.Details
apt 301: replace kitchen cabinets - replace bath vanity, toilet, new fan unit. paint apartment - rugs & lino & tile on third floor. no structural work. | $25,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2018 | 618 Natoma St | foundation repair along centerline of property approx 46'-6"Details
foundation repair along centerline of property approx 46'-6" | $10,000 |
| Jan 17, 2017 | Completed final sign-off Aug 2026 | 5 Santa Rosa Av | create 3(n) dwelling units, conversion of(e) office & storage on 2/f to make 6-unit bldg. (n) windows on mission st. new roof deck. nfpa-13 sprinkler & voluntary alarm deferred. 3rd fl work w/o permit to be removed. ref pa#201703010437Details
create 3(n) dwelling units, conversion of(e) office & storage on 2/f to make 6-unit bldg. (n) windows on mission st. new roof deck. nfpa-13 sprinkler & voluntary alarm deferred. 3rd fl work w/o permit to be removed. ref pa#201703010437 | $100,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2017 | 3119 Jackson St | compliance w/ mandatory seismic retrofit program 2012 iebc appendix a-4Details
compliance w/ mandatory seismic retrofit program 2012 iebc appendix a-4 | $50,000 |
| Sep 2, 2016 | Completed final sign-off Dec 2016 | 637 Masonic Av | unit #639: bathroom replace tub with shower - add 1 toilet, tile shower surround add 1 lav sink. add washer/dryer unit #637: water closet add 1 lav sink. add 1 washer/dryerDetails
unit #639: bathroom replace tub with shower - add 1 toilet, tile shower surround add 1 lav sink. add washer/dryer unit #637: water closet add 1 lav sink. add 1 washer/dryer | $15,000 |
| Aug 19, 2016 | Completed final sign-off Nov 2016 | 101 Lombard St | kitchen remodel: replace (e) counter top, caibnets and sink and faucet w/ new range hood. run ckts for stove/overn. add new gfi's & add 6 can lights. maintain fire raiting at ceiling at recessed lights.Details
kitchen remodel: replace (e) counter top, caibnets and sink and faucet w/ new range hood. run ckts for stove/overn. add new gfi's & add 6 can lights. maintain fire raiting at ceiling at recessed lights. | $15,000 |
| Aug 15, 2016 | Completed final sign-off Apr 2017 | 909 Haight St | unit 5: revision to ref pa 201607081908: install new gas furnance 80% afve and new aire ducts with r6 insluationDetails
unit 5: revision to ref pa 201607081908: install new gas furnance 80% afve and new aire ducts with r6 insluation | $7,000 |
| Jul 8, 2016 | Completed final sign-off Apr 2017 | 909 Haight St | unit 5: interior renovation in 1 apartment. renovate kitchen, replace bath fixtures, add new shower, expand opening in 1 interior wallDetails
unit 5: interior renovation in 1 apartment. renovate kitchen, replace bath fixtures, add new shower, expand opening in 1 interior wall | $19,000 |
| Jun 1, 2016 | Completed final sign-off Apr 2017 | 484 Douglass St | voluntary foundation repairs.Details
voluntary foundation repairs. | $8,500 |
| Apr 7, 2016 | Completed final sign-off Aug 2016 | 2033 Leavenworth St | renovate (e) master bathroom, remove bidet, tile floor, tub surround , reposition toilet, add one sink, add (1) can light over tub, fan unit & two sconces, retile by others. no walls to be added.Details
renovate (e) master bathroom, remove bidet, tile floor, tub surround , reposition toilet, add one sink, add (1) can light over tub, fan unit & two sconces, retile by others. no walls to be added. | $7,500 |
| Apr 6, 2016 | Completed final sign-off May 2016 | 88 Winfield St | to repair in like kind stairs/landing (exterior), less than 50%Details
to repair in like kind stairs/landing (exterior), less than 50% | $8,500 |
| Apr 6, 2016 | Completed final sign-off Apr 2016 | 116 Cherry St | reroofingDetails
reroofing | $14,500 |
| Apr 6, 2016 | Completed final sign-off Apr 2016 | 185 Sussex St | pest control report 2/24/2015. repaired /replace 10 steps, #2, 2x8 cross bracing, replaced two sets of casings. one 4x4 post, replace less than 50%Details
pest control report 2/24/2015. repaired /replace 10 steps, #2, 2x8 cross bracing, replaced two sets of casings. one 4x4 post, replace less than 50% | $5,250 |
| Mar 3, 2016 | Completed final sign-off Sep 2016 | 23 Los Palmos Dr | replace landscaping retaining walls in rear yard.Details
replace landscaping retaining walls in rear yard. | $37,000 |
| Oct 23, 2015 | Never finaled issued Nov 2015, no final | 618 Natoma St | unit #3: remodel kitchen and bath in unit 3. replace flooring cabinets, countertop and lighting. replace all windows in unit in kind. replace elec heating units maher not reqDetails
unit #3: remodel kitchen and bath in unit 3. replace flooring cabinets, countertop and lighting. replace all windows in unit in kind. replace elec heating units maher not req | $28,000 |