Above Engineering Corporation
- Based in
- San Francisco
- On San Francisco permits
- May 2024 to May 2026
- Last 24 months
- 2 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | Completed final sign-off Jun 2026 | 1349 Hampshire St | remove (e) roofing material , replace plywood; and replace with (n) class a asphalt shingles roofing system. install (n) underlayment flashing vents and related roofing components. no structural changes.Details
remove (e) roofing material , replace plywood; and replace with (n) class a asphalt shingles roofing system. install (n) underlayment flashing vents and related roofing components. no structural changes. | $4,000 |
| May 6, 2026 | Completed final sign-off Jun 2026 | 1349 Hampshire St | re-roofing; no torch down.Details
re-roofing; no torch down. | $20,000 |
| May 31, 2024 | Completed final sign-off Mar 2026 | 1080 Hampshire St | add 1 unit at gr fl zoning rh2,add 29 sf under 2nd fl overhang at rear, remodel 2nd fl unit. correct deck and stair rear violation 202183612Details
add 1 unit at gr fl zoning rh2,add 29 sf under 2nd fl overhang at rear, remodel 2nd fl unit. correct deck and stair rear violation 202183612 | $350,000 |