Abm Electrical Solutions Dba Linc Lighti
- Based in
- Tustin
- On San Francisco permits
- Jun 2019 to Feb 2026
- Last 24 months
- 2 permits filed
4 permits since 2000: 2 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2026 | Completed final sign-off Feb 2026 | 505 Howard St | revision to pa #2025-0527-7274 provide additional scope to previous permit: installation of (1) l2 dual hose charger and (2) l2 single hose chargers in valet only parking garageDetails
revision to pa #2025-0527-7274 provide additional scope to previous permit: installation of (1) l2 dual hose charger and (2) l2 single hose chargers in valet only parking garage | |
| Jun 6, 2025 | Completed final sign-off Feb 2026 | 505 Howard St | installation of 2-boltdown level 2 ev chargers for used by valet service in garage. install (4) 40amp 2-pole breakers into existing electrical panel. run conduit on existing racks and pull wire to accommodate ev chargers. bolt down (2) bollards per charger.Details
installation of 2-boltdown level 2 ev chargers for used by valet service in garage. install (4) 40amp 2-pole breakers into existing electrical panel. run conduit on existing racks and pull wire to accommodate ev chargers. bolt down (2) bollards per charger. | $48,740 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 840 Post St | install 12 electrical car charges in parking garage: insatll 12 vehicle car charges and ckts. install (3) 100a 3p surface mount panels, 12-2 pole 40a ckt breakers, 100ft 100a 3 phase feeder conduit, 12-40a 1 phase branch ckt in emt, 12 jb's.Details
install 12 electrical car charges in parking garage: insatll 12 vehicle car charges and ckts. install (3) 100a 3p surface mount panels, 12-2 pole 40a ckt breakers, 100ft 100a 3 phase feeder conduit, 12-40a 1 phase branch ckt in emt, 12 jb's. | $6,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 1390 Market St | install exterior led lightingDetails
install exterior led lighting | $175,600 |