Aaa Flag & Banner Mfg Co Inc
- Based in
- Los Angeles
- On San Francisco permits
- Aug 2009 to Jan 2026
- Last 24 months
- 1 permit filed
25 permits since 2000: 5 completed, 1 in progress, 14 never finaled, 5 expired or cancelled.
Of the 14 never-finaled permits, 9 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2026 | In progress filed Jan 2026, not yet issued | 88 04th St | install 3 decal window signs at (3) above ground elevations. each sign is 165ft x 5ft total 825 ft area. decal attached direct to window. decal installing from a swing stage.Details
install 3 decal window signs at (3) above ground elevations. each sign is 165ft x 5ft total 825 ft area. decal attached direct to window. decal installing from a swing stage. | $30,142 |
| Oct 27, 2021 | Expired or cancelled cancelled Jan 2026 | 55 Chumasero Dr | attach (1) 97"x55' tall mesh banner to existing cable frame on outside of bldg with metal clip hook. existing cable frame has 3/16" cable, stainless aircraft cable attached to eyebolts into (e) wall anchors. mesh material with 50% wind blowthrough, astm e84-08 compliant.Details
attach (1) 97"x55' tall mesh banner to existing cable frame on outside of bldg with metal clip hook. existing cable frame has 3/16" cable, stainless aircraft cable attached to eyebolts into (e) wall anchors. mesh material with 50% wind blowthrough, astm e84-08 compliant. | $4,500 |
| Mar 18, 2021 | Never finaled issued May 2021, no final | 100 Font Bl | install (1) 97"x55' mesh banner to (e) cable frame. non-electric. single faced. 444 sqft. (now leasing! parkmerced.com)Details
install (1) 97"x55' mesh banner to (e) cable frame. non-electric. single faced. 444 sqft. (now leasing! parkmerced.com) | $4,500 |
| Feb 1, 2021 | Never finaled filed Feb 2021, never issued | 55 Chumasero Dr | install (6) 8'6" x 8'6" non electric single faced mesh banners to wall using cement tapcon every 24" on each side. these will replace (e) set of banners. mesh material allows 50% blow through.Details
install (6) 8'6" x 8'6" non electric single faced mesh banners to wall using cement tapcon every 24" on each side. these will replace (e) set of banners. mesh material allows 50% blow through. | $2,500 |
| Feb 14, 2019 | Never finaled issued Feb 2020, no final | 100 Font Bl | attach temporary banner 97" x 55' mesh material, existing cable frame.Details
attach temporary banner 97" x 55' mesh material, existing cable frame. | $4,500 |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 55 Chumasero Dr | temporary bannerDetails
temporary banner | $4,500 |
| May 1, 2018 | Never finaled issued May 2018, no final | 100 Font Bl | "for lease": - install (1) 97"x55" tall mesh banner to (e) cable frame on outsideof the bld w/metal clip hooks. (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. mesh material, 50% blow through temporary signDetails
"for lease": - install (1) 97"x55" tall mesh banner to (e) cable frame on outsideof the bld w/metal clip hooks. (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. mesh material, 50% blow through temporary sign | $4,500 |
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 125 Cambon Dr | relocate attach banner to existing cable frameon outside of bldg w/metal clip hooks, (e) cable frame has 3/16" cable stainless aircraft cable is attached to eye bolts into wal anchors, mesh material 50% blow throughDetails
relocate attach banner to existing cable frameon outside of bldg w/metal clip hooks, (e) cable frame has 3/16" cable stainless aircraft cable is attached to eye bolts into wal anchors, mesh material 50% blow through | $4,500 |
| Jul 17, 2017 | Never finaled issued Jul 2017, no final | 55 Chumasero Dr | attach (1) banner to existing cable frame.Details
attach (1) banner to existing cable frame. | $4,500 |
| Mar 9, 2017 | Never finaled issued Mar 2017, no final | 55 Chumasero Dr | wall mounted vinyl sign - single facedDetails
wall mounted vinyl sign - single faced | $2,500 |
| Jan 5, 2017 | Never finaled issued Jan 2017, no final | 125 Cambon Dr | - attach (1) 97"w x 55" tall mesh banner to extg cable frame on outside of bldg w/ metal clip hooks. - (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. - mesh material, 50% blow trough. non-electric single facedDetails
- attach (1) 97"w x 55" tall mesh banner to extg cable frame on outside of bldg w/ metal clip hooks. - (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. - mesh material, 50% blow trough. non-electric single faced | $4,500 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 55 Chumasero Dr | install non-electric, single faced banner to existing cable frame.Details
install non-electric, single faced banner to existing cable frame. | $4,500 |
| Nov 13, 2014 | Expired or cancelled withdrawn Oct 2017 | 900 Folsom St | temporary decal 8 total galss surfaces on balconys (non-structural sign). n/a maher ordinanceDetails
temporary decal 8 total galss surfaces on balconys (non-structural sign). n/a maher ordinance | $16,000 |
| Nov 13, 2014 | Expired or cancelled withdrawn Oct 2017 | 900 Folsom St | erect a 4'x40' vinyl banner secured to paraphit. n/a maher ordinanceDetails
erect a 4'x40' vinyl banner secured to paraphit. n/a maher ordinance | $4,000 |
| Oct 22, 2014 | Completed final sign-off Jun 2015 | 701 China Basin St | temporary banners 4 5 x 20 bannersDetails
temporary banners 4 5 x 20 banners | $10,000 |
| Sep 3, 2014 | Never finaled issued Sep 2014, no final | 2175 Market St | attach (1) temporary vinyl mesh banner to existing wooden piers, which are a part of the buildingDetails
attach (1) temporary vinyl mesh banner to existing wooden piers, which are a part of the building | $10,000 |
| Aug 28, 2014 | Expired or cancelled cancelled Jan 2026 | 701 China Basin St | temporary banners for leasing purposes. 4 - 5x20 bannersDetails
temporary banners for leasing purposes. 4 - 5x20 banners | $10,000 |
| Aug 20, 2013 | Expired or cancelled expired Nov 2021 | 1 Dr. Carlton B. Goodlett Pl | erect a non electric single faced non illuminated temp bannerDetails
erect a non electric single faced non illuminated temp banner | $10,000 |
| Feb 15, 2013 | Never finaled issued Feb 2013, no final | 335 Powell St | mount 2 banners for "all star game" 10 mounting pts/banner. concrete anchors used or attachment to bldg. temp banners to celebrate mlb world baseball classic to be removed march 20-21, 2013, install set for mar 6-8, 2013Details
mount 2 banners for "all star game" 10 mounting pts/banner. concrete anchors used or attachment to bldg. temp banners to celebrate mlb world baseball classic to be removed march 20-21, 2013, install set for mar 6-8, 2013 | $25,000 |
| Feb 14, 2013 | Completed final sign-off Apr 2014 | 55 Chumasero Dr | remove all vinly banners in violation as detailed in the follwoing pages and per the attached nov removal of banners and hardware to be done using swingstage work platform.Details
remove all vinly banners in violation as detailed in the follwoing pages and per the attached nov removal of banners and hardware to be done using swingstage work platform. | $7,000 |
| Feb 14, 2013 | Completed final sign-off Apr 2014 | 125 Cambon Dr | remove all vinly banners in violation as detailed in the following pages and per the attached nov removal of banners and hardware to be done using swingstage work platform.Details
remove all vinly banners in violation as detailed in the following pages and per the attached nov removal of banners and hardware to be done using swingstage work platform. | $7,000 |
| Feb 14, 2013 | Completed final sign-off Apr 2014 | 310 Arballo Dr | remove all vinyl banners in violation as detailed in the follwoing pages and per the attached nov removal of banners and hardware to be done using swingstage work platform.Details
remove all vinyl banners in violation as detailed in the follwoing pages and per the attached nov removal of banners and hardware to be done using swingstage work platform. | $7,000 |
| Jul 28, 2010 | Completed final sign-off Nov 2011 | 113 10th St | to comply with nov 201053715 , dated 6/29/10 to legalize existing flag pole on roofDetails
to comply with nov 201053715 , dated 6/29/10 to legalize existing flag pole on roof | $500 |
| Apr 27, 2010 | Never finaled issued May 2010, no final | 1 Kearny St | install 1-tight mesh banner 15'x70.4', banner 15% windclad passthrough "reuable". install using expansion anchors and cable frame. anchors in mortar not brick.Details
install 1-tight mesh banner 15'x70.4', banner 15% windclad passthrough "reuable". install using expansion anchors and cable frame. anchors in mortar not brick. | $10,000 |
| Aug 6, 2009 | Never finaled issued Aug 2009, no final | 1335 Market St | install sign on 10th. st. close to corner to market st. (167"x130").Details
install sign on 10th. st. close to corner to market st. (167"x130"). | $825 |