A Step Ahead Construction Llc
- Based in
- Oakland
- On San Francisco permits
- Jan 2018 to Mar 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2023 | Expired or cancelled expired May 2026 | 1569 16th Av | add a new front door at foyer area.reconfig main staircase with pen design.add new bath,closet and mud room on 1/f per plan.remodel (e) kitchen and diing with open design.remodel the (e) living room and (e) bathroom on 2/f conert 1 bedroom into master suite.Details
add a new front door at foyer area.reconfig main staircase with pen design.add new bath,closet and mud room on 1/f per plan.remodel (e) kitchen and diing with open design.remodel the (e) living room and (e) bathroom on 2/f conert 1 bedroom into master suite. | $60,000 |
| May 3, 2019 | Never finaled issued May 2019, no final | 416 Capp St | rev to pa# 201811095525; to add 2 windows at 1st fl.Details
rev to pa# 201811095525; to add 2 windows at 1st fl. | $2,000 |
| Nov 9, 2018 | Never finaled issued Apr 2019, no final | 416 Capp St | convert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor.Details
convert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor. | $20,000 |
| Mar 6, 2018 | Completed final sign-off Aug 2018 | 207 Juanita Wy | reno (e) bathroom, only replace shower tub, sink, wc, and tiles. replace kitchen cabinets countertops on 2nd flr. sfdDetails
reno (e) bathroom, only replace shower tub, sink, wc, and tiles. replace kitchen cabinets countertops on 2nd flr. sfd | $8,500 |
| Jan 30, 2018 | Never finaled issued Jan 2018, no final | 601 Van Ness Av | unit 302: replace (e) kitchen countertop & cabiet, replace (e) 2 bathrooms fixtures, 2 bathtubs, 2 lavatory & 2 wc , floor tiles, replace 2 lights on ceilingDetails
unit 302: replace (e) kitchen countertop & cabiet, replace (e) 2 bathrooms fixtures, 2 bathtubs, 2 lavatory & 2 wc , floor tiles, replace 2 lights on ceiling | $40,000 |