A M J Swan Construction
- Based in
- Piedmont
- On San Francisco permits
- May 2006 to Nov 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2010 | Completed final sign-off Mar 2011 | 840 Clipper Tr | remove existing drywll from ceiling upstairs, r-38 insulation into upstairs ceiling, install fire-rated sound proof drywall, repair drywall, master bedrm downstairs- install insulation, drywall; replace upstairs flooring, replace upstairs baseboard trim; all work in lower unitDetails
remove existing drywll from ceiling upstairs, r-38 insulation into upstairs ceiling, install fire-rated sound proof drywall, repair drywall, master bedrm downstairs- install insulation, drywall; replace upstairs flooring, replace upstairs baseboard trim; all work in lower unit | $35,000 |
| Mar 20, 2007 | Completed final sign-off Apr 2007 | 3633 16th St | volunatary lateral improvemnt(including); 1/2" cdx plywood shearwall on all garage sides from foundation to top plate nailed with 8d at 6" on edge 12" infield, foundation bolts (5/8" 4'0.6, 7" deep wedge andchor with 2"x2" square washer), h25 steel ties where ceiling joist meets tip plate.Details
volunatary lateral improvemnt(including); 1/2" cdx plywood shearwall on all garage sides from foundation to top plate nailed with 8d at 6" on edge 12" infield, foundation bolts (5/8" 4'0.6, 7" deep wedge andchor with 2"x2" square washer), h25 steel ties where ceiling joist meets tip plate. | $8,000 |
| May 12, 2006 | Completed final sign-off May 2006 | 126 Monterey Bl | voluntary lateral improvements including: 1/2" cdx 8d w 6" edge, 12" filed shearwalling over garage door both garage sides (from foundation to top plate). and top half of rear wall. foundation bolts (5/8" every 4' o.c. 7" deep-set with epoxy 2x2 washer sq #25 steel ties where garage roof joists runDetails
voluntary lateral improvements including: 1/2" cdx 8d w 6" edge, 12" filed shearwalling over garage door both garage sides (from foundation to top plate). and top half of rear wall. foundation bolts (5/8" every 4' o.c. 7" deep-set with epoxy 2x2 washer sq #25 steel ties where garage roof joists run | $5,850 |