A M A Design Build Incorporated
- Based in
- El Segundo
- On San Francisco permits
- Dec 2013 to Oct 2018
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2018 | Completed final sign-off Feb 2019 | 201 Mission St | suite #2750: t.i. includes demolition of extg non-structural partitions, lighting, electrical, plumbing, mechanical, casework and finishes. n/a for maher.Details
suite #2750: t.i. includes demolition of extg non-structural partitions, lighting, electrical, plumbing, mechanical, casework and finishes. n/a for maher. | $600,000 |
| Jan 2, 2018 | Never finaled issued Feb 2018, no final | 360 03rd St | 6th floor #615 - renovation of room #002 open office (one room only) for new broadcast equipment & freestanding furniture layout. n/a maher ordinanceDetails
6th floor #615 - renovation of room #002 open office (one room only) for new broadcast equipment & freestanding furniture layout. n/a maher ordinance | $340,000 |
| Feb 17, 2016 | Completed final sign-off Mar 2016 | 360 03rd St | office ti on 6th fl (suite 650): of existing high rise office b occupancy. 6th fl is a multi tennant floor. project consists of new interior partitionDetails
office ti on 6th fl (suite 650): of existing high rise office b occupancy. 6th fl is a multi tennant floor. project consists of new interior partition | $2,000 |
| Jan 26, 2016 | Completed final sign-off Mar 2016 | 360 03rd St | suite 650 - addition of supplemental ac unit for after hours use. minor rework of existing ductwork & vav boxes to accommodate new supplemental equipment. no architectural work, no electrical, no plumbing. n/a maher ordinanceDetails
suite 650 - addition of supplemental ac unit for after hours use. minor rework of existing ductwork & vav boxes to accommodate new supplemental equipment. no architectural work, no electrical, no plumbing. n/a maher ordinance | $100,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2016 | 360 03rd St | revision to app 2015-0814-4273 for t.i. on 6th floor for new parttions. minor mechanical and electrical work. there is no plbmg work associated scope. enlarge noc room. n/a for maher. life safety deferred.Details
revision to app 2015-0814-4273 for t.i. on 6th floor for new parttions. minor mechanical and electrical work. there is no plbmg work associated scope. enlarge noc room. n/a for maher. life safety deferred. | $25,000 |
| Aug 14, 2015 | Completed final sign-off Jan 2016 | 360 03rd St | ti on 6th floor of (e) office building. construction of new partitions and minor mechanical, elelctrical. fire sprinkler & fire alarm work under separate permit. there is no plumbing work associated with scope. n/a for maher.Details
ti on 6th floor of (e) office building. construction of new partitions and minor mechanical, elelctrical. fire sprinkler & fire alarm work under separate permit. there is no plumbing work associated with scope. n/a for maher. | $500,000 |
| Feb 2, 2015 | Completed final sign-off May 2016 | 360 03rd St | ste 615. installation of new optional emergency generator located on exterior of bldg at sw side at grade. work includes generator on new concrete pad with active diesel particulate filter. n/a for the maherDetails
ste 615. installation of new optional emergency generator located on exterior of bldg at sw side at grade. work includes generator on new concrete pad with active diesel particulate filter. n/a for the maher | $30,000 |
| Apr 8, 2014 | Completed final sign-off Jul 2014 | 360 03rd St | the scope of this submittal is limted to the deferred structural submittals of calculation for appl. 201312184460. n/a maher ordinance # 155-13Details
the scope of this submittal is limted to the deferred structural submittals of calculation for appl. 201312184460. n/a maher ordinance # 155-13 | |
| Dec 18, 2013 | Completed final sign-off Jul 2014 | 360 03rd St | 6th floor suite 615. tenant interior improvement with mechanical, electrical & plumbing. sprinklers & fire alarm submitted under separate permit. compliance with ordinance #155-13 not required.Details
6th floor suite 615. tenant interior improvement with mechanical, electrical & plumbing. sprinklers & fire alarm submitted under separate permit. compliance with ordinance #155-13 not required. | $1,078,859 |