A K Home Improvement Inc
- Based in
- Daly City
- On San Francisco permits
- Feb 2013 to Sep 2023
- Last 24 months
- 0 permits filed
34 permits since 2000: 26 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2023 | Completed final sign-off Dec 2023 | 780 Guerrero St | unit # 15: kitchen remodel in-kind. paint. approx. 100 sq. feet.Details
unit # 15: kitchen remodel in-kind. paint. approx. 100 sq. feet. | $10,000 |
| Jul 18, 2022 | Never finaled issued Jul 2022, no final | 2640 Lyon St | repair stairs and railing less than 50%.Details
repair stairs and railing less than 50%. | $5,000 |
| May 22, 2020 | Expired or cancelled cancelled Jan 2026 | 3154 Fillmore St | remove existing granite countertop frame the fron and top of the bar. install new wooden counter top with a decorative molding.Details
remove existing granite countertop frame the fron and top of the bar. install new wooden counter top with a decorative molding. | $18,000 |
| Jan 10, 2019 | Completed final sign-off Jun 2019 | 2036 Lombard St | tenant improvement: mechanical plans for pa201807275704. make-up air unit in kitchen, fans in bathrooms. maher n/a.Details
tenant improvement: mechanical plans for pa201807275704. make-up air unit in kitchen, fans in bathrooms. maher n/a. | $10,000 |
| Dec 7, 2018 | Completed final sign-off Jan 2019 | 4075 17th St | converting (e) closet to new bathroom. all work on the second floor.Details
converting (e) closet to new bathroom. all work on the second floor. | $10,000 |
| Jul 30, 2018 | Completed final sign-off Sep 2018 | 777 Noriega St | to comply with nov#201874493, revision to 201805290311, build new concrete wallDetails
to comply with nov#201874493, revision to 201805290311, build new concrete wall | $1,800 |
| Jul 27, 2018 | Completed final sign-off Jun 2019 | 2036 Lombard St | tenant improvement from e restaurant to new restaurant. work to include new interior partitoins, new finishes, new bar equipment, new ligh fixtures, new plumbinb fixtures, e fire life safety systems to remain. e havac systems to remain. e kitchen hood and equip to 201 / seperate permit for relocateDetails
tenant improvement from e restaurant to new restaurant. work to include new interior partitoins, new finishes, new bar equipment, new ligh fixtures, new plumbinb fixtures, e fire life safety systems to remain. e havac systems to remain. e kitchen hood and equip to 201 / seperate permit for relocate | $150,000 |
| May 29, 2018 | Completed final sign-off Sep 2018 | 777 Noriega St | replace the stucco at the front and back of the house in kind, change the windows to wood on the front and back, fiberglass on the side of the house.Details
replace the stucco at the front and back of the house in kind, change the windows to wood on the front and back, fiberglass on the side of the house. | $35,000 |
| May 29, 2018 | Completed final sign-off Sep 2018 | 777 Noriega St | house remodeling: kitchen & 2 bathrooms, remodeling. no structural work, no wall modification.Details
house remodeling: kitchen & 2 bathrooms, remodeling. no structural work, no wall modification. | $35,000 |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 2018 16th Av | (e) deck in the back repair & replace less than 50% of the deck & replace one post 4/6 approx 20 sq ft of the deck.Details
(e) deck in the back repair & replace less than 50% of the deck & replace one post 4/6 approx 20 sq ft of the deck. | $3,500 |
| Feb 28, 2018 | Completed final sign-off May 2018 | 349 Tara St | two replacement windows at bldg.front at same openings: marvin clad wood with extruded aluminum ext. & pine interior. u<=0.32: 48"-56" clad ult.slider (egress 20 5/64" width x 51 9/32/' h)for bedrm @ top flr;ro 72" x 48" clad ult.window grd.flr.kitchenDetails
two replacement windows at bldg.front at same openings: marvin clad wood with extruded aluminum ext. & pine interior. u<=0.32: 48"-56" clad ult.slider (egress 20 5/64" width x 51 9/32/' h)for bedrm @ top flr;ro 72" x 48" clad ult.window grd.flr.kitchen | $2,000 |
| Feb 27, 2018 | Completed final sign-off Apr 2018 | 3295 Clay St | unit #5: bathroom remodeling, install the new bath tub, runa new drain line and electrical power for the washer and dryer. exhaust to exterior, termnate 3' from property line & openings into bldg. clothes dryer per cmc 504.4Details
unit #5: bathroom remodeling, install the new bath tub, runa new drain line and electrical power for the washer and dryer. exhaust to exterior, termnate 3' from property line & openings into bldg. clothes dryer per cmc 504.4 | $9,800 |
| Dec 5, 2017 | Completed final sign-off Jan 2018 | 3018 Clay St | bathtub & shower tile replacement.Details
bathtub & shower tile replacement. | $2,800 |
| Jun 28, 2017 | Completed final sign-off Nov 2018 | 349 Tara St | proposed kitchen remodel. proposed renovation 165 sq ft along rear of garage to be converted to a bedroom w/full bath. change rear windows at living room to doors. move (e) fau unit under (e) living room to crawl space.Details
proposed kitchen remodel. proposed renovation 165 sq ft along rear of garage to be converted to a bedroom w/full bath. change rear windows at living room to doors. move (e) fau unit under (e) living room to crawl space. | $75,000 |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 2018 16th Av | street space permitDetails
street space permit | |
| May 26, 2017 | Completed final sign-off Sep 2017 | 2018 16th Av | stucco replacement, like for like, no character defining features to be removed. entire building.Details
stucco replacement, like for like, no character defining features to be removed. entire building. | $35,000 |
| Jan 26, 2017 | Completed final sign-off Sep 2022 | 800 29th Av | legalize unit via adu programDetails
legalize unit via adu program | |
| Dec 30, 2016 | Completed final sign-off Mar 2017 | 3295 Clay St | #5 -remodel kitchen. n/a for maher.Details
#5 -remodel kitchen. n/a for maher. | $7,000 |
| Nov 1, 2016 | Completed final sign-off Dec 2016 | 4001 Ocean Av | front of building damage repair per ak home improvement inc. report of 10-14-16; foundation work, reinforce framwork, approx 40-70 sq. ft., stucco work approx 160 sq. ft., garage door replacementDetails
front of building damage repair per ak home improvement inc. report of 10-14-16; foundation work, reinforce framwork, approx 40-70 sq. ft., stucco work approx 160 sq. ft., garage door replacement | $20,000 |
| Aug 16, 2016 | Completed final sign-off Sep 2016 | 87 Escondido Av | revision to pa #2016-07-27-3445. dry rot repair. not visible to the street.Details
revision to pa #2016-07-27-3445. dry rot repair. not visible to the street. | $900 |
| Jul 27, 2016 | Completed final sign-off Sep 2016 | 87 Escondido Av | replace the stucco on the back of the house in kind 300 sfDetails
replace the stucco on the back of the house in kind 300 sf | $3,000 |
| Apr 27, 2016 | Completed final sign-off May 2016 | 1454 Church St | sheetrock insulation in garage area.Details
sheetrock insulation in garage area. | $7,000 |
| Nov 2, 2015 | Completed final sign-off Dec 2015 | 443 Gold Mine Dr | existing balcony repair and replacement.Details
existing balcony repair and replacement. | $4,800 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 1244 30th Av | repair and replace in-kind brick steps at front entrance of single-family dwelling. less than 50% of the stairs. replacing brick veneer steps only. no structural repair.Details
repair and replace in-kind brick steps at front entrance of single-family dwelling. less than 50% of the stairs. replacing brick veneer steps only. no structural repair. | $2,800 |
| Jun 5, 2015 | Completed final sign-off Aug 2015 | 1240 30th Av | remove one kitchen bearing wall.Details
remove one kitchen bearing wall. | $2,600 |
| May 19, 2015 | Completed final sign-off Aug 2015 | 1240 30th Av | kitchen & bathroom remodeling, new kitche hood to replace existing and bath fan. swap toilet vanity locations, all other fixtures are same location, no walls moved.Details
kitchen & bathroom remodeling, new kitche hood to replace existing and bath fan. swap toilet vanity locations, all other fixtures are same location, no walls moved. | $32,000 |
| Mar 30, 2015 | Completed final sign-off Apr 2015 | 255 Dalewood Wy | front deck repair in kind (18ft x 6ft). replace membrane and tile only - no strucutral repairs. no stairsDetails
front deck repair in kind (18ft x 6ft). replace membrane and tile only - no strucutral repairs. no stairs | $2,600 |
| Feb 20, 2015 | Completed final sign-off Jun 2016 | 157 Marview Wy | 2nd floor exterior deck and stair. replace window to the patio door and 2nd window to the new window.Details
2nd floor exterior deck and stair. replace window to the patio door and 2nd window to the new window. | $9,500 |
| Jan 8, 2015 | Never finaled issued Jan 2015, no final | 157 Marview Wy | remodel kitchen and 2 bathrooms in kindDetails
remodel kitchen and 2 bathrooms in kind | $23,000 |
| Dec 9, 2014 | Expired or cancelled withdrawn Jan 2015 | 157 Marview Wy | remodel (e) kitchen and enlarge one (e) bathroom. relocate one bathroom per plan.Details
remodel (e) kitchen and enlarge one (e) bathroom. relocate one bathroom per plan. | $40,000 |
| Sep 25, 2014 | Completed final sign-off Jun 2018 | 75 Starview Wy | (n) 261 sf rear deck. replace (e) rear fence in-kindDetails
(n) 261 sf rear deck. replace (e) rear fence in-kind | $12,000 |
| Jan 10, 2014 | Completed final sign-off Jan 2014 | 2299 Post St | revision to pa#201311141853 - as built for reference only ada bathroom not installed. compliance with ordinance no. 155-13 not required.Details
revision to pa#201311141853 - as built for reference only ada bathroom not installed. compliance with ordinance no. 155-13 not required. | |
| Nov 14, 2013 | Never finaled issued Nov 2013, no final | 2299 Post St | tenant improvement including demolition of existing partitions (interior) and doors, new ada bathroom, construction of new non-structural partitions. sprinklers under separate permit. mep under separate permit.Details
tenant improvement including demolition of existing partitions (interior) and doors, new ada bathroom, construction of new non-structural partitions. sprinklers under separate permit. mep under separate permit. | $13,500 |
| Feb 7, 2013 | Completed final sign-off Mar 2013 | 1501 Monterey Bl | less than 50% deck and stair case dry rot repair in the rear, rear windows replacement of window frames only to comply with bid 201386182Details
less than 50% deck and stair case dry rot repair in the rear, rear windows replacement of window frames only to comply with bid 201386182 | $10,000 |