A J O Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Mar 2018
- Last 24 months
- 0 permits filed
72 permits since 2000: 69 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2018 | Completed final sign-off Mar 2018 | 2973 Folsom St | revision to 201609238716Details
revision to 201609238716 | |
| Jan 22, 2018 | Expired or cancelled expired Feb 2025 | 700 Cabrillo St | revision to pa 201708316605 minor change to shear walls upgrade add two new sections of grade beamsDetails
revision to pa 201708316605 minor change to shear walls upgrade add two new sections of grade beams | $5,000 |
| Nov 22, 2017 | Completed final sign-off Dec 2017 | 47 Seward St | revisions to pa#2016-01-29-8289. minor shear walls changes.Details
revisions to pa#2016-01-29-8289. minor shear walls changes. | |
| Nov 14, 2017 | Completed final sign-off Jan 2018 | 2401 23rd Av | soft story upgrade - revision to pa #201704043168: minor graphic update & minor change to tie down schedule.Details
soft story upgrade - revision to pa #201704043168: minor graphic update & minor change to tie down schedule. | |
| Oct 12, 2017 | Completed final sign-off Oct 2017 | 81 Parnassus Av | for administration purposes, address correction for pa#201702099058Details
for administration purposes, address correction for pa#201702099058 | |
| Sep 12, 2017 | Completed final sign-off May 2018 | 1830 Beach St | comply with s.f. wood frame soft story seismic retrofit program, sfebc chapter 4d per cebc appendix a-4. n/a maher ordinanceDetails
comply with s.f. wood frame soft story seismic retrofit program, sfebc chapter 4d per cebc appendix a-4. n/a maher ordinance | $65,000 |
| Sep 12, 2017 | Completed final sign-off Jan 2018 | 125 San Felipe Av | replace damaged retaining wall in rear yard, total excavation is less than 3 c.u. yard. n/a maher ordinanceDetails
replace damaged retaining wall in rear yard, total excavation is less than 3 c.u. yard. n/a maher ordinance | $35,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2018 | 250 Kenwood Wy | gr fl remodel, convert storage room to living space by adding 1 bath, 1 bedroom, wet bar maher naDetails
gr fl remodel, convert storage room to living space by adding 1 bath, 1 bedroom, wet bar maher na | $35,000 |
| Sep 5, 2017 | Completed final sign-off Dec 2017 | 216 Jersey St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $60,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 700 Cabrillo St | common area-soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
common area-soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $20,000 |
| Aug 3, 2017 | Completed final sign-off Aug 2017 | 3124 Washington St | revision to pa 2016-1012-0031, relocate shear walls along grid line b from front toward back and additional minor structural changes; soft sotry retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4Details
revision to pa 2016-1012-0031, relocate shear walls along grid line b from front toward back and additional minor structural changes; soft sotry retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4 | |
| Apr 13, 2017 | Completed final sign-off Feb 2018 | 980 Green St | comply with sf wood frame seismic retrofit program soft story sfbc chap 34b per 2012 iebc appendix a4Details
comply with sf wood frame seismic retrofit program soft story sfbc chap 34b per 2012 iebc appendix a4 | $40,000 |
| Apr 4, 2017 | Completed final sign-off Jan 2018 | 2401 23rd Av | comply with sf wood frame seismic retrofit program - soft story. sfbc chapter 4d per 2012 iebc app a4Details
comply with sf wood frame seismic retrofit program - soft story. sfbc chapter 4d per 2012 iebc app a4 | $65,000 |
| Mar 17, 2017 | Completed final sign-off Feb 2018 | 1426 Taylor St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4 | $60,000 |
| Mar 17, 2017 | Completed final sign-off Jan 2018 | 170 Albion St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4. maher naDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4. maher na | $55,000 |
| Mar 17, 2017 | Completed final sign-off Jul 2017 | 412 Green St | soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807Details
soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807 | $5,000 |
| Mar 2, 2017 | Completed final sign-off May 2017 | 1000 Cole St | to comply with 201764281. minor imprmnt of comm space due to soft story upgrade. ref 201512044174/201512044173 - repair/upgrade damaged plumbing affected by soft story pw20170202918,Details
to comply with 201764281. minor imprmnt of comm space due to soft story upgrade. ref 201512044174/201512044173 - repair/upgrade damaged plumbing affected by soft story pw20170202918, | |
| Feb 9, 2017 | Completed final sign-off Oct 2017 | 1000 Cole St | remodel of apartment on split level above 1st floor no exterior changesDetails
remodel of apartment on split level above 1st floor no exterior changes | $30,000 |
| Jan 19, 2017 | Completed final sign-off Jan 2018 | 301 18th Av | soft story retrofit: comply with san francisco wood frame seismic retrofit program (soft story), sfbc hapter 34b, per 2012 iebc, appendix a-4.Details
soft story retrofit: comply with san francisco wood frame seismic retrofit program (soft story), sfbc hapter 34b, per 2012 iebc, appendix a-4. | $50,000 |
| Dec 23, 2016 | Completed final sign-off Oct 2017 | 962 Greenwich St | comply with sf wood frame seusnuc soft story retrofit, sfpc chapter 34b per 2012 iebc appendix a-4.Details
comply with sf wood frame seusnuc soft story retrofit, sfpc chapter 34b per 2012 iebc appendix a-4. | $60,000 |
| Dec 8, 2016 | Completed final sign-off Apr 2018 | 2810 Washington St | comply with sfbc wood frame seismic retrofit program (soft story) sfbc chaper 34b per 2012 iebc appx a4Details
comply with sfbc wood frame seismic retrofit program (soft story) sfbc chaper 34b per 2012 iebc appx a4 | $80,000 |
| Dec 8, 2016 | Completed final sign-off Nov 2017 | 282 Castro St | comply with sfbc wood frame seismic retrofit program (soft story) sfbc chaper 34b per 2012 iebc appx a4Details
comply with sfbc wood frame seismic retrofit program (soft story) sfbc chaper 34b per 2012 iebc appx a4 | $70,000 |
| Dec 8, 2016 | Completed final sign-off Apr 2017 | 754 Great Hy | replace (e) damaged foundation at front wallDetails
replace (e) damaged foundation at front wall | $7,000 |
| Dec 8, 2016 | Completed final sign-off Nov 2017 | 4327 23rd St | comply with nov# 201624691. replace entirely (e) deteriorated rear deck @ 2nd floor. ground level deck less than 36". new 42" wood railing @ 3rd floor rear door.Details
comply with nov# 201624691. replace entirely (e) deteriorated rear deck @ 2nd floor. ground level deck less than 36". new 42" wood railing @ 3rd floor rear door. | $20,000 |
| Dec 8, 2016 | Completed final sign-off Nov 2017 | 1990 Filbert St | comply wth sf wood frame soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
comply wth sf wood frame soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $80,000 |
| Dec 8, 2016 | Completed final sign-off Jan 2017 | 2365 Francisco St | revision to 201610311565 & 201610311560 (no plan repair permits) to add replacing of damaged plywood on the ground level garage locally per planDetails
revision to 201610311565 & 201610311560 (no plan repair permits) to add replacing of damaged plywood on the ground level garage locally per plan | $500 |
| Oct 12, 2016 | Completed final sign-off Aug 2017 | 3124 Washington St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $60,000 |
| Sep 14, 2016 | Completed final sign-off Apr 2018 | 1501 Lombard St | retrofit gr flevel for wood frame seismic retrofit program per 2012 int'l existing bldge code iebc appendix a4Details
retrofit gr flevel for wood frame seismic retrofit program per 2012 int'l existing bldge code iebc appendix a4 | $90,000 |
| Sep 13, 2016 | Completed final sign-off Jun 2017 | 1025 Hyde St | soft story program seismic retrofit 2012 iebc a4Details
soft story program seismic retrofit 2012 iebc a4 | $10,000 |
| Sep 13, 2016 | Completed final sign-off May 2017 | 173 Parnassus Av | soft story program seismic retrofit 2012 iebc a4Details
soft story program seismic retrofit 2012 iebc a4 | $10,000 |
| Sep 7, 2016 | Completed final sign-off Dec 2016 | 1155 Leavenworth St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13 | $50,000 |
| Sep 7, 2016 | Completed final sign-off Oct 2018 | 250 Kenwood Wy | voluntary structural/seismic upgrade of ground floor, n/a ordinance #155-13Details
voluntary structural/seismic upgrade of ground floor, n/a ordinance #155-13 | $65,000 |
| Aug 24, 2016 | Completed final sign-off Feb 2017 | 1855 Turk St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $85,000 |
| Aug 17, 2016 | Completed final sign-off Oct 2016 | 748 Page St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $10,000 |
| Aug 4, 2016 | Completed final sign-off Dec 2017 | 3550 23rd St | comply with soft story sfbc chapter 34b wood frame seismic retrofit program. per iebc 2012 appx a4Details
comply with soft story sfbc chapter 34b wood frame seismic retrofit program. per iebc 2012 appx a4 | $65,000 |
| Aug 4, 2016 | Completed final sign-off Dec 2016 | 1228 Grove St | comply with soft story sfbc chapter 34b wood frame seismic retrofit program. per iebc 2012 appx a4 maher naDetails
comply with soft story sfbc chapter 34b wood frame seismic retrofit program. per iebc 2012 appx a4 maher na | $65,000 |
| Jul 26, 2016 | Completed final sign-off Jun 2018 | 754 Broadway | comply with san francisco wood frame seismic retrofit program sfbc chapter 34b, per 2012 iebc appx a4 - residentialDetails
comply with san francisco wood frame seismic retrofit program sfbc chapter 34b, per 2012 iebc appx a4 - residential | $58,500 |
| Jul 26, 2016 | Completed final sign-off Jul 2018 | 754 Broadway | comply with san francisco wood frame seismic retrofit program sfbc chapter 34b, per 2012 iebc appx a4 - commercialDetails
comply with san francisco wood frame seismic retrofit program sfbc chapter 34b, per 2012 iebc appx a4 - commercial | $17,500 |
| Jun 21, 2016 | Completed final sign-off Jun 2017 | 1950 Franklin St | comply w/san francisco wood-frame seismic retrofit program (soft story),sfbc chapter 34b,per 2012 iebc appendix a-4.Details
comply w/san francisco wood-frame seismic retrofit program (soft story),sfbc chapter 34b,per 2012 iebc appendix a-4. | $65,000 |
| Jun 13, 2016 | Completed final sign-off Jul 2016 | 1855 Turk St | replace water proofing on (3) (e) roof decks; (1) deck on 3/f, (1) deck on 2/f both on east side of building, (1) deck on 2/f on southside of building.Details
replace water proofing on (3) (e) roof decks; (1) deck on 3/f, (1) deck on 2/f both on east side of building, (1) deck on 2/f on southside of building. | $6,000 |
| May 26, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | revision to pa 2016-0108-6656 - change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4Details
revision to pa 2016-0108-6656 - change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4 | |
| May 26, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | revision to pa 2016-0114-7107 - commercial/market change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4Details
revision to pa 2016-0114-7107 - commercial/market change shear wall design in back wall & moment frame beam to column connection. soft story retrofit per sfbc chapter 34b engineering criteria - 2012 iebc appendix a4 | |
| May 6, 2016 | Completed final sign-off Aug 2016 | 2805 Van Ness Av | revision to ref pa 2016 0112 6868: move shear wall along grid line 2. add new shear wall near grid line 3. maher naDetails
revision to ref pa 2016 0112 6868: move shear wall along grid line 2. add new shear wall near grid line 3. maher na | |
| Apr 25, 2016 | Completed final sign-off Aug 2017 | 1125 Taylor St | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a4. maher naDetails
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a4. maher na | $60,000 |
| Mar 25, 2016 | Completed final sign-off Oct 2016 | 1249 18th Av | soft storey retrofit sfbc chapter 34b, per 2012 iebc app. a4Details
soft storey retrofit sfbc chapter 34b, per 2012 iebc app. a4 | $60,000 |
| Jan 29, 2016 | Completed final sign-off Dec 2017 | 47 Seward St | comply with san franisco wood frame seismic retrofit program - soft storey. sfbc charter 34b, per 2012 iebc app. a-4Details
comply with san franisco wood frame seismic retrofit program - soft storey. sfbc charter 34b, per 2012 iebc app. a-4 | $60,000 |
| Jan 22, 2016 | Completed final sign-off Apr 2017 | 3450 Broderick St | comply with sf wood frame seismic retrofit program, soft story, sfbc chapter 34b, per 2012 iebc chapter a-4Details
comply with sf wood frame seismic retrofit program, soft story, sfbc chapter 34b, per 2012 iebc chapter a-4 | $45,000 |
| Jan 14, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | commercial- comply with s.f. wood frame seismic retrofit program(soft story) sfbc chapter 34b, per 2012 iebc appendix a-4. commercial/market.Details
commercial- comply with s.f. wood frame seismic retrofit program(soft story) sfbc chapter 34b, per 2012 iebc appendix a-4. commercial/market. | $32,500 |
| Jan 13, 2016 | Completed final sign-off Feb 2016 | 2170 Filbert St | revision to pa 2015-1020-0188 resize new steel frame. maher naDetails
revision to pa 2015-1020-0188 resize new steel frame. maher na | |
| Jan 8, 2016 | Completed final sign-off Jun 2016 | 625 Divisadero St | residential- to comply with s.f. wood frame seismic retrofit program soft story sfbc chapter 34b, per 2012 iebc appendix a-4.Details
residential- to comply with s.f. wood frame seismic retrofit program soft story sfbc chapter 34b, per 2012 iebc appendix a-4. | $65,000 |
| Dec 15, 2015 | Completed final sign-off May 2016 | 172 Langton St | to comply with physical inspection report#cc-7935Details
to comply with physical inspection report#cc-7935 | $50,000 |
| Dec 4, 2015 | Completed final sign-off Feb 2017 | 1000 Cole St | comply with sf wood frame seismic retrofit program (soft story) sfbc chapter 34 b, per 2012 iebc appendiex a4 for residentialDetails
comply with sf wood frame seismic retrofit program (soft story) sfbc chapter 34 b, per 2012 iebc appendiex a4 for residential | $60,000 |
| Dec 4, 2015 | Never finaled issued Dec 2016, no final | 1000 Cole St | comply with sf wood frame seismic retrofit program (soft story) sfbc chapter 34 b, per 2012 iebc appendiex a4 for commercial/restaurant ada workDetails
comply with sf wood frame seismic retrofit program (soft story) sfbc chapter 34 b, per 2012 iebc appendiex a4 for commercial/restaurant ada work | $20,900 |
| Nov 19, 2015 | Completed final sign-off May 2016 | 1238 Page St | mandatory soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
mandatory soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $30,000 |
| Oct 20, 2015 | Completed final sign-off Feb 2016 | 2170 Filbert St | comply with sf wood frame seismic retrofit program - soft storey, sfbc chapter 34b, per 2012 iebc, app a-4. maher naDetails
comply with sf wood frame seismic retrofit program - soft storey, sfbc chapter 34b, per 2012 iebc, app a-4. maher na | $60,000 |
| Oct 20, 2015 | Completed final sign-off Nov 2015 | 2952 Folsom St | voluntary structural upgrade of exterior wallDetails
voluntary structural upgrade of exterior wall | $5,000 |
| Sep 15, 2015 | Completed final sign-off Nov 2015 | 1266 18th Av | relocate (e) garage door on interior wall to building front wall; install (n) anti-climb metal hardware on top of (e) wood fence at rear yardDetails
relocate (e) garage door on interior wall to building front wall; install (n) anti-climb metal hardware on top of (e) wood fence at rear yard | $2,000 |
| Sep 8, 2015 | Completed final sign-off Nov 2015 | 172 Langton St | replace (e) 18 front windows with new wood double-hung white windows with ogee lugsDetails
replace (e) 18 front windows with new wood double-hung white windows with ogee lugs | $15,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2015 | 670 08th Av | revision to app#201505206783. new foundation at line f. new grade beam at line k moved to keep extg front foundation.Details
revision to app#201505206783. new foundation at line f. new grade beam at line k moved to keep extg front foundation. | |
| Jul 31, 2015 | Completed final sign-off Sep 2015 | 172 Langton St | existing rear stairs to be replaced (partially). no change to location, look, configuration of (e) stairs.Details
existing rear stairs to be replaced (partially). no change to location, look, configuration of (e) stairs. | $5,000 |
| Jul 28, 2015 | Completed final sign-off Oct 2015 | 670 08th Av | minor interior remodel, move kitchen abnd create new bedroom at gr fl0orDetails
minor interior remodel, move kitchen abnd create new bedroom at gr fl0or | $15,000 |
| May 20, 2015 | Completed final sign-off Oct 2015 | 670 08th Av | soft storey retrofit, sfbc chapter 34b, per 2012 iebc appendix a4Details
soft storey retrofit, sfbc chapter 34b, per 2012 iebc appendix a4 | $40,000 |
| May 20, 2015 | Completed final sign-off Oct 2016 | 2209 Gough St | soft storey retrofit, sfbc chapter 34b, per 2012, iebc appendix a4Details
soft storey retrofit, sfbc chapter 34b, per 2012, iebc appendix a4 | $50,000 |
| Apr 29, 2015 | Completed final sign-off Jul 2015 | 726 14th St | comply with s.f. wood-frame seismic retrofit program (soft story), sfbc chapter 34b, per 2012 iebc appendix a-4Details
comply with s.f. wood-frame seismic retrofit program (soft story), sfbc chapter 34b, per 2012 iebc appendix a-4 | $30,000 |
| Apr 14, 2015 | Completed final sign-off Dec 2015 | 10 Castle Manor Av | soft story retrofit to comply with sfbc chapter 34b. install new plywood shearwalls, install 2 ndc steel frame, install nw foundation under steel frame. 2012 iebc appendix a-4Details
soft story retrofit to comply with sfbc chapter 34b. install new plywood shearwalls, install 2 ndc steel frame, install nw foundation under steel frame. 2012 iebc appendix a-4 | $90,000 |
| Mar 19, 2015 | Expired or cancelled expired Apr 2019 | 2810 Washington St | remove patio and replace with new two cars garage and deck and one half bath.Details
remove patio and replace with new two cars garage and deck and one half bath. | $80,000 |
| Feb 9, 2015 | Completed final sign-off Oct 2015 | 1870 Washington St | comply with s.f. wood frame seismic retrofit program soft story. sfbc chapter 34b, per 2012 iebc appendix a-4.Details
comply with s.f. wood frame seismic retrofit program soft story. sfbc chapter 34b, per 2012 iebc appendix a-4. | $90,000 |
| Oct 29, 2014 | Completed final sign-off Mar 2015 | 172 Langton St | comply with san francisco wood frame seismic retrofit program soft story per sfbc chapter 34b 2012 iebc appendix a-4Details
comply with san francisco wood frame seismic retrofit program soft story per sfbc chapter 34b 2012 iebc appendix a-4 | $50,000 |
| Sep 30, 2014 | Completed final sign-off Jan 2015 | 45 Bosworth St | comply with san francisco wood frame seismic retrofit program (soft story)sfbc 34b per iebc 2012 a-4; install steel frame (2 units) at ground level, install (n) plywood shearwall @ ground level.Details
comply with san francisco wood frame seismic retrofit program (soft story)sfbc 34b per iebc 2012 a-4; install steel frame (2 units) at ground level, install (n) plywood shearwall @ ground level. | $50,000 |
| Aug 18, 2014 | Completed final sign-off Mar 2015 | 1242 Sacramento St | soft story seismic upgrade comply with san francisco wood frame seismic retrofit program, sfbc chapter 34b, per 2012 iebc, appendix a-4; maher n/aDetails
soft story seismic upgrade comply with san francisco wood frame seismic retrofit program, sfbc chapter 34b, per 2012 iebc, appendix a-4; maher n/a | $5,000 |
| Jul 18, 2014 | Completed final sign-off Nov 2014 | 421 14th Av | comply with soft story retrofit program. engineering criteria: 2012 iebc appendix a-4.Details
comply with soft story retrofit program. engineering criteria: 2012 iebc appendix a-4. | $80,000 |
| Jul 18, 2014 | Completed final sign-off Dec 2014 | 1266 18th Av | comply with sf soft story retrofit program sf bc chapter 34-b per iebc appendix a-4.Details
comply with sf soft story retrofit program sf bc chapter 34-b per iebc appendix a-4. | $80,000 |