A+G Design+Build
- Based in
- San Francisco
- On San Francisco permits
- Jul 2023 to Aug 2026
- Last 24 months
- 10 permits filed
15 permits since 2000: 12 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 2126 24th St | remodel (e) kitchen, no structural changes, demolish selected non-structural partitions, new casework, appliances, plumbing fixtures,lighting,electrical and finishes.Details
remodel (e) kitchen, no structural changes, demolish selected non-structural partitions, new casework, appliances, plumbing fixtures,lighting,electrical and finishes. | $25,000 |
| Jul 1, 2026 | Completed final sign-off Sep 2026 | 600 Arkansas St | legalize (e) bathroom at ground floor as shown on sheet a-1, reference pa# 201911217857Details
legalize (e) bathroom at ground floor as shown on sheet a-1, reference pa# 201911217857 | $25,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 499 Alabama St | studio unit 317 on 3/f: install new floor cabinets, sink and gfi outlet.Details
studio unit 317 on 3/f: install new floor cabinets, sink and gfi outlet. | $6,500 |
| Feb 27, 2026 | Completed final sign-off Sep 2026 | 1930 Grove St | unit 3- remodel (e) kitchen no sturcrtural changes demo selected non structural partitions, new casework, appliances plumbing fixtures and electrical fnishes and lightings.Details
unit 3- remodel (e) kitchen no sturcrtural changes demo selected non structural partitions, new casework, appliances plumbing fixtures and electrical fnishes and lightings. | $51,144 |
| Feb 27, 2026 | In progress issued Apr 2026 | 600 Arkansas St | partial bathroom renovation. (n) tub, patch and repair floor at (e) tub. relocate wd, new finishes. (e) lighting and wall outlets to remain. (n) nonstructural partition and cabinet.Details
partial bathroom renovation. (n) tub, patch and repair floor at (e) tub. relocate wd, new finishes. (e) lighting and wall outlets to remain. (n) nonstructural partition and cabinet. | $10,000 |
| Oct 3, 2025 | Completed final sign-off Jun 2026 | 723 46th Av | infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath.Details
infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath. | $109,391 |
| Sep 4, 2025 | Completed final sign-off Dec 2025 | 22 Montezuma St | replace (e) gas furnace w/(n) heat pump roof mounted; reinforce (e) rafters under conderser unitDetails
replace (e) gas furnace w/(n) heat pump roof mounted; reinforce (e) rafters under conderser unit | $25,000 |
| Jun 30, 2025 | Completed final sign-off Dec 2025 | 25 Holyoke St | revision to pa# 2025-0602-7662 to add /change in scope of work: demolish walls at kitchen/living room-patch ceiling and floor. close kitchen ceiling with new 5/8 drywall. reinforce attic rafters and ceiling joists. to comply with nov#202538270.Details
revision to pa# 2025-0602-7662 to add /change in scope of work: demolish walls at kitchen/living room-patch ceiling and floor. close kitchen ceiling with new 5/8 drywall. reinforce attic rafters and ceiling joists. to comply with nov#202538270. | $30,000 |
| Jun 2, 2025 | Completed final sign-off Dec 2025 | 25 Holyoke St | remodel bathroom and kitchen. new cabinets, fixtures, appliance. (n) gfi circuits. (n) sink. (n) smoke detector.Details
remodel bathroom and kitchen. new cabinets, fixtures, appliance. (n) gfi circuits. (n) sink. (n) smoke detector. | $32,000 |
| Mar 4, 2025 | Completed final sign-off Mar 2025 | 666 Morse St | show skylight location @ kitchen revision to pa#2024-0726-7375Details
show skylight location @ kitchen revision to pa#2024-0726-7375 | |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 22 Montezuma St | voluntary foundation bolting and dry rot repair. add new gyp board at basement west property line wall. no exterior work.Details
voluntary foundation bolting and dry rot repair. add new gyp board at basement west property line wall. no exterior work. | $1,500 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 2126 24th St | demolition existing bathroom and replace in kind with new finishes, plumbing fixtures, accessories, lighting, and electrical.Details
demolition existing bathroom and replace in kind with new finishes, plumbing fixtures, accessories, lighting, and electrical. | $20,552 |
| Jul 26, 2024 | Completed final sign-off Mar 2025 | 666 Morse St | sfebc 405.2.1 repairs for less than 50% of structrural damage per special inspector report dated 7/10/24. no changes to structure or floor layout. replace windows (facing front), interior doors, new insulation, and mep fixtures and finishes due fire damageDetails
sfebc 405.2.1 repairs for less than 50% of structrural damage per special inspector report dated 7/10/24. no changes to structure or floor layout. replace windows (facing front), interior doors, new insulation, and mep fixtures and finishes due fire damage | $184,815 |
| Apr 10, 2024 | Completed final sign-off Jul 2024 | 2621 Bryant St | lower level demo kitchen finishes, fixture & appliances, install new of the same. no structural changes. new electrical & plumbingDetails
lower level demo kitchen finishes, fixture & appliances, install new of the same. no structural changes. new electrical & plumbing | $59,425 |
| Jul 6, 2023 | Completed final sign-off Dec 2023 | 1930 Grove St | bathroom remodel: change (e) layout add fanDetails
bathroom remodel: change (e) layout add fan | $15,000 |