A D K Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2003 to Aug 2021
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2021 | Completed final sign-off Jul 2022 | 959 14th St | remodel (e) kitchen new cabinets, floor, electrical fixtures, plumbing insatll new bathroom with toilet, sink, shower/tub. installing (4) new windows @ exterior rearDetails
remodel (e) kitchen new cabinets, floor, electrical fixtures, plumbing insatll new bathroom with toilet, sink, shower/tub. installing (4) new windows @ exterior rear | $140,000 |
| Aug 11, 2020 | Completed final sign-off Oct 2020 | 1324 Clayton St | remodel powder room. relocate toilet and sink. same location. same location.Details
remodel powder room. relocate toilet and sink. same location. same location. | $14,000 |
| Nov 19, 2019 | Expired or cancelled cancelled Jan 2026 | 3956 Clay St | common area - remove existing railint & add a new block wall/stucco & new partial railingDetails
common area - remove existing railint & add a new block wall/stucco & new partial railing | $50,000 |
| Sep 18, 2018 | Completed final sign-off Jan 2019 | 374 Arkansas St | new shower, bathtub, showerpan, kitchen counters, 2 bathroom vanities, fixtures, toiles, re-tile bathroom floors, replace light fixtures as needed throughout remodel.Details
new shower, bathtub, showerpan, kitchen counters, 2 bathroom vanities, fixtures, toiles, re-tile bathroom floors, replace light fixtures as needed throughout remodel. | $70,000 |
| Oct 16, 2014 | Completed final sign-off Sep 2016 | 1034 Filbert St | remodel existing study, add a bathroom, replace existing property-line windows in lightwell.Details
remodel existing study, add a bathroom, replace existing property-line windows in lightwell. | $20,000 |
| Oct 23, 2013 | Completed final sign-off Apr 2014 | 801 Castro St | at lower unit only - remove (e) plaster on all ceilings and replace with insulation & double sheetrock for sound proofing purposes. install new recessed light, replace 2 windows at lightwell & 1 door at back yard, u factor 0.40 max.Details
at lower unit only - remove (e) plaster on all ceilings and replace with insulation & double sheetrock for sound proofing purposes. install new recessed light, replace 2 windows at lightwell & 1 door at back yard, u factor 0.40 max. | $70,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 1701 Broadway | remodel 2 bathrooms, new plumbing fixtures tile, floorsDetails
remodel 2 bathrooms, new plumbing fixtures tile, floors | $40,000 |
| Oct 9, 2012 | Completed final sign-off Feb 2013 | 28 Panorama Dr | kitchen remodel: install hood intead of microwave w/vent, remove wall between kitchen & dining area, move sink and dishwasher to right 3', replace cabinets, replace appliancesDetails
kitchen remodel: install hood intead of microwave w/vent, remove wall between kitchen & dining area, move sink and dishwasher to right 3', replace cabinets, replace appliances | $40,000 |
| Jun 21, 2012 | Completed final sign-off Dec 2012 | 2760 19th Av | remodel kitchen & 2 bathrooms. lighting must comply cec 150(1c). kitchen=90 sq ft, bathroom #1=54 sq ft, bathroom #2=60 sq ft.Details
remodel kitchen & 2 bathrooms. lighting must comply cec 150(1c). kitchen=90 sq ft, bathroom #1=54 sq ft, bathroom #2=60 sq ft. | $50,000 |
| Aug 12, 2011 | Completed final sign-off Feb 2012 | 3956 Clay St | replace existing wood rear stairs with metal spiral stairs/ revision to previous approved addition permit #2010-0317-8421Details
replace existing wood rear stairs with metal spiral stairs/ revision to previous approved addition permit #2010-0317-8421 | $7,500 |
| Feb 11, 2011 | Completed final sign-off Feb 2012 | 3956 Clay St | revision to appl #2011.01.25.9014 with (n) window size & type.Details
revision to appl #2011.01.25.9014 with (n) window size & type. | |
| Jan 25, 2011 | Completed final sign-off Feb 2012 | 3956 Clay St | fill in part of lightwell on first floor.Details
fill in part of lightwell on first floor. | $1,500 |
| Mar 17, 2010 | Completed final sign-off Feb 2012 | 3956 Clay St | lower unit rear addition, replacement of (e) rear stairs from upper unit, new pallet deck walkway access from uper unit exit to new stairs.Details
lower unit rear addition, replacement of (e) rear stairs from upper unit, new pallet deck walkway access from uper unit exit to new stairs. | $35,000 |
| May 12, 2008 | Completed final sign-off Dec 2008 | 28 Panorama Dr | conversion of an unfinished first floor (ground level) to add one bedroom & one bathroom, add a french door & three windows, relocate hot water heater, install a new 97% furnace (new location).Details
conversion of an unfinished first floor (ground level) to add one bedroom & one bathroom, add a french door & three windows, relocate hot water heater, install a new 97% furnace (new location). | $50,000 |
| May 16, 2006 | Completed final sign-off Aug 2006 | 28 Panorama Dr | bathroom remodel- replace all fixtures in place, replace enclosed walaled shower with glass shower surround, add 2 motion sensor switches, 1 timer switch, 3 gfi outlets, 3 recessed lights, 2 wall sconce lights, vent fanDetails
bathroom remodel- replace all fixtures in place, replace enclosed walaled shower with glass shower surround, add 2 motion sensor switches, 1 timer switch, 3 gfi outlets, 3 recessed lights, 2 wall sconce lights, vent fan | $30,000 |
| Dec 22, 2003 | Completed final sign-off Aug 2004 | 116 De Soto St | revision to deck framing changes on 2nd floor & foundation changes on 1st floor deck. app#2003070789Details
revision to deck framing changes on 2nd floor & foundation changes on 1st floor deck. app#2003070789 | $5,000 |
| Sep 16, 2003 | Completed final sign-off Nov 2003 | 2845 Lake St | dry-rot repair to south east side of house approx. 200-250 sqftDetails
dry-rot repair to south east side of house approx. 200-250 sqft | $8,000 |