A C F Construction Inc.
- Based in
- Sacramento
- On San Francisco permits
- Jun 2014 to Mar 2017
- Last 24 months
- 0 permits filed
12 permits since 2000: 6 completed, 6 never finaled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2017 | Completed final sign-off Apr 2017 | 2250 Hayes St | fire alarm new strobe lights and replace 1 existing corridor strobe light with new horn strobe; bpa#201612155060Details
fire alarm new strobe lights and replace 1 existing corridor strobe light with new horn strobe; bpa#201612155060 | $8,000 |
| Dec 21, 2016 | Never finaled issued Feb 2017, no final | 2340 Clay St | 5th floor: revision to 2015-1211-4881 -barrier removal: provide new han washing fixture, new wall supports. fire alarm deferred.Details
5th floor: revision to 2015-1211-4881 -barrier removal: provide new han washing fixture, new wall supports. fire alarm deferred. | $147,863 |
| Dec 15, 2016 | Completed final sign-off Apr 2017 | 2250 Hayes St | remodel on the 3rd of an (e) 6 story medical office building. maher naDetails
remodel on the 3rd of an (e) 6 story medical office building. maher na | $208,000 |
| Oct 28, 2016 | Never finaled issued Oct 2016, no final | 2333 Buchanan St | street spaceDetails
street space | |
| May 27, 2016 | Completed final sign-off Oct 2016 | 711 Van Ness Av | unit #250: revision to bpa 201603091597, change air handler unit location from roof to 2nd flr balcony. revise floor plan to include i.t. room.Details
unit #250: revision to bpa 201603091597, change air handler unit location from roof to 2nd flr balcony. revise floor plan to include i.t. room. | |
| Mar 9, 2016 | Completed final sign-off Oct 2016 | 711 Van Ness Av | suite #250,2nd flr: tenant improvement ophthalmology center build out of architectural, mechanical & electrical buildout. building is fully sprinklered. sprinkler work on deferred submittal.Details
suite #250,2nd flr: tenant improvement ophthalmology center build out of architectural, mechanical & electrical buildout. building is fully sprinklered. sprinkler work on deferred submittal. | $400,000 |
| Jan 12, 2016 | Never finaled issued Aug 2016, no final | 2333 Buchanan St | voluntary access barrier removal, remodel doors in acccessible path of travel, replace & provide (n) accessible signage, remodel public toilets on all floors, add cane detection crossbars @ drinking fountains & exterior standpipe, striping at stairs, parking striping, (n) handrails at ramp.Details
voluntary access barrier removal, remodel doors in acccessible path of travel, replace & provide (n) accessible signage, remodel public toilets on all floors, add cane detection crossbars @ drinking fountains & exterior standpipe, striping at stairs, parking striping, (n) handrails at ramp. | $120,000 |
| Dec 11, 2015 | Never finaled issued Aug 2016, no final | 2340 Clay St | remodel e doors with accessible path of travel. add powered auto door operators push plate to e doors, accessible door levers, widening of door opening. remove vertical rods below door opening push bar. relocate or replace accessible signage remodel e toilets public on selected floors cane detectorDetails
remodel e doors with accessible path of travel. add powered auto door operators push plate to e doors, accessible door levers, widening of door opening. remove vertical rods below door opening push bar. relocate or replace accessible signage remodel e toilets public on selected floors cane detector | $80,000 |
| Nov 18, 2015 | Never finaled issued Aug 2016, no final | 2401 Clay St | all levels: voluntary access barrier removal in common spaces to include, doors in path of travel, accessible signage, parking stalls, cane detection bars at protruding objects, & upgrade to stairways.Details
all levels: voluntary access barrier removal in common spaces to include, doors in path of travel, accessible signage, parking stalls, cane detection bars at protruding objects, & upgrade to stairways. | $140,000 |
| Jun 4, 2015 | Completed final sign-off Mar 2016 | 1635 Divisadero St | suite 200 - comply w/nov #200871523 - addition of 2 private patient rooms to existing outpatient surgery center & relocation of staff break, locker room & business office. life safety deferred.Details
suite 200 - comply w/nov #200871523 - addition of 2 private patient rooms to existing outpatient surgery center & relocation of staff break, locker room & business office. life safety deferred. | $120,000 |
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 2250 Hayes St | revision to 201406269605. change location of toilet, change in finishes, change door frames and hardware.Details
revision to 201406269605. change location of toilet, change in finishes, change door frames and hardware. | |
| Jun 26, 2014 | Never finaled issued Aug 2014, no final | 2250 Hayes St | removal of currently unoccupied space into an ultrasound doctors office.Details
removal of currently unoccupied space into an ultrasound doctors office. | $135,000 |