Permit GraphShortlistSan Francisco building permits since 2000

A Barrios General Building Contrctor Pai

Contractor license
785178
State license record
Based in
Redwood City
On San Francisco permits
Nov 2008 to Apr 2019
Last 24 months
0 permits filed

4 permits since 2000: 4 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllStairs 1Kitchen remodel 1Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 22, 2019Completed
final sign-off Aug 2019
1201 California Stunit 904:new gfci outlets. relocate gas line. remodel 1 kitchen & 1 bathroom. kitchen:install new cabinets, new countertops, new sink, new faucet, garbage disposal.p trap new appliances & new tile floor & backsplash. bath: install new tub, new tiles on wall & floor, new valves, new sink, new toilet.
Details
Permit
201904228580
Status
complete
Filed
Apr 22, 2019
Permit issued
Apr 22, 2019
Final sign-off
Aug 27, 2019
Declared cost
$40,000
Address
1201 California St

unit 904:new gfci outlets. relocate gas line. remodel 1 kitchen & 1 bathroom. kitchen:install new cabinets, new countertops, new sink, new faucet, garbage disposal.p trap new appliances & new tile floor & backsplash. bath: install new tub, new tiles on wall & floor, new valves, new sink, new toilet.

Open the permit page

$40,000
Oct 22, 2015Completed
final sign-off May 2021
2010 Filbert St(rear bldg) vertical 3rd story addition on the existing rear building to convert a new dwelling residence with a separate lot from the existing lot #6
Details
Permit
201510220476
Status
complete
Filed
Oct 22, 2015
Permit issued
May 17, 2019
Final sign-off
May 21, 2021
Declared cost
$180,000
Address
2010 Filbert St

(rear bldg) vertical 3rd story addition on the existing rear building to convert a new dwelling residence with a separate lot from the existing lot #6

Open the permit page

$180,000
May 14, 2009Completed
final sign-off Jun 2009
34 Sola Avremove old stone from 3 steps & 7.5x6.5 landing. water proof it & replace it with new stone. . stairs are (e) & to remain as same design
Details
Permit
200905148395
Status
complete
Filed
May 14, 2009
Permit issued
May 14, 2009
Final sign-off
Jun 11, 2009
Declared cost
$13,475
Address
34 Sola Av

remove old stone from 3 steps & 7.5x6.5 landing. water proof it & replace it with new stone. . stairs are (e) & to remain as same design

Open the permit page

$13,475
Nov 7, 2008Completed
final sign-off Dec 2008
3455 26th Stanchoring the sill plate to foundation using 5/8"x16" bolts w/ 3"x3"x1/4" thick washers every 4' o.c. through all the foundation.
Details
Permit
200811076142
Status
complete
Filed
Nov 7, 2008
Permit issued
Nov 7, 2008
Final sign-off
Dec 5, 2008
Declared cost
$8,865
Address
3455 26th St

anchoring the sill plate to foundation using 5/8"x16" bolts w/ 3"x3"x1/4" thick washers every 4' o.c. through all the foundation.

Open the permit page

$8,865