A B F Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to May 2025
- Last 24 months
- 3 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2025 | Completed final sign-off Jan 2026 | 1618 Alabama St | bathroom remodeling = a combine shower room & toilet room into one full bath; remove 2 existing windows & replaced with one fixed glass 45 minutes window. existing windows are singel hung 2'x4'& 30" x4'Details
bathroom remodeling = a combine shower room & toilet room into one full bath; remove 2 existing windows & replaced with one fixed glass 45 minutes window. existing windows are singel hung 2'x4'& 30" x4' | $15,000 |
| Feb 14, 2025 | Completed final sign-off Apr 2025 | 2084 14th Av | remodeling in-kind 1 bathrom on 2nd fl in full; install new shower pan put out the tub and install double sinkDetails
remodeling in-kind 1 bathrom on 2nd fl in full; install new shower pan put out the tub and install double sink | $20,000 |
| Oct 21, 2024 | Completed final sign-off Sep 2025 | 806 Russia Av | 2 story addition (11ft x 14) to existing bldg.Details
2 story addition (11ft x 14) to existing bldg. | $45,000 |
| Aug 29, 2024 | Completed final sign-off Aug 2025 | 806 Russia Av | to comply with nov 202421515 demo all unpermitted works including bathroom in garage, expansion on ground floor 1st fl rearDetails
to comply with nov 202421515 demo all unpermitted works including bathroom in garage, expansion on ground floor 1st fl rear | $50,000 |
| Jun 20, 2024 | Completed final sign-off Nov 2024 | 1797 Haight St | restaurant ti to replace/refrubish (e) kitchen equipment and appliances and remodel (e) bathroom to be ada complaintDetails
restaurant ti to replace/refrubish (e) kitchen equipment and appliances and remodel (e) bathroom to be ada complaint | $55,000 |
| Oct 25, 2023 | Completed final sign-off Jul 2024 | 30 Rockaway Av | remodel of 2(e) bathrooms; add 6 can lightsDetails
remodel of 2(e) bathrooms; add 6 can lights | $20,000 |
| Jan 18, 2023 | Completed final sign-off Feb 2023 | 2709 22nd St | to obtain final inspection for work approved under pa#201112160865 and 201112160861Details
to obtain final inspection for work approved under pa#201112160865 and 201112160861 | |
| Feb 25, 2016 | Completed final sign-off May 2017 | 2709 22nd St | rear bldg - revision to pa 2011-1216-0861, replace existing foundation as shown on planDetails
rear bldg - revision to pa 2011-1216-0861, replace existing foundation as shown on plan | $6,000 |
| Jul 18, 2014 | Completed final sign-off Oct 2014 | 3135 Pacific Av | replace existing dry-rotted joists at unit #3.Details
replace existing dry-rotted joists at unit #3. | $3,000 |
| May 1, 2014 | Completed final sign-off Jul 2014 | 1944 Webster St | fix dry rot approx 5%, replace two bottom window sashes on front bay.; compliance with maher ord 155-13 not requiredDetails
fix dry rot approx 5%, replace two bottom window sashes on front bay.; compliance with maher ord 155-13 not required | $9,000 |
| Apr 2, 2014 | Completed final sign-off Oct 2014 | 3135 Pacific Av | apt 3. demolish floors, drywalls, walls and ceilings drywalls and clean area for fix clean mold. install insulation and put drywall back finish. trim and painting. no structural work.Details
apt 3. demolish floors, drywalls, walls and ceilings drywalls and clean area for fix clean mold. install insulation and put drywall back finish. trim and painting. no structural work. | $30,000 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 2700 Union St | fix damage shingle on 3rd floor and repair part of exterior wall shingles between 2700-2815 broderick st. adding shingle wall at the stucco areas on top of 3rd floor. repair & replace in kind. no structural work.Details
fix damage shingle on 3rd floor and repair part of exterior wall shingles between 2700-2815 broderick st. adding shingle wall at the stucco areas on top of 3rd floor. repair & replace in kind. no structural work. | $30,000 |
| Mar 8, 2011 | Completed final sign-off Jun 2012 | 2971 Lake St | 3rd flr remodeling one master bathroom plumbing, tiling floor, lighting to comply with cec 150(k); basement- 1/2 bathroom, 2nd flr, 1 full bathrm , water heater tankless install, drywall, no change to wall windows or doorsDetails
3rd flr remodeling one master bathroom plumbing, tiling floor, lighting to comply with cec 150(k); basement- 1/2 bathroom, 2nd flr, 1 full bathrm , water heater tankless install, drywall, no change to wall windows or doors | $25,000 |