A A 58 Construction Co
- Based in
- Daly City
- On San Francisco permits
- Sep 2002 to Oct 2002
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2002 | Completed final sign-off Oct 2002 | 62 Parnassus Av | replace rotten floor joists as shown on pest control report drawing, place # 2Details
replace rotten floor joists as shown on pest control report drawing, place # 2 | $1,540 |
| Sep 19, 2002 | Completed final sign-off Oct 2002 | 62 Parnassus Av | replace rotten studs & supports as shown on pest control report drawing place#2. repair < 50% @ rearDetails
replace rotten studs & supports as shown on pest control report drawing place#2. repair < 50% @ rear | $2,850 |