8 Success Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Aug 2025
- Last 24 months
- 4 permits filed
19 permits since 2000: 17 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2025 | Completed final sign-off Dec 2025 | 1008 Treat Av | one bathroom, one kitchen remodeling ( in kind) at main floor. kitchen approx. 120 sq ft. bathroom approx. 45 sq ft. add a subpanel in the hallway, rewire the house. replace (7) windows - (3 windows in the front, 4 windows in the back). all windows to be replaced in kind in existing openings.Details
one bathroom, one kitchen remodeling ( in kind) at main floor. kitchen approx. 120 sq ft. bathroom approx. 45 sq ft. add a subpanel in the hallway, rewire the house. replace (7) windows - (3 windows in the front, 4 windows in the back). all windows to be replaced in kind in existing openings. | $92,500 |
| May 22, 2025 | In progress issued May 2025 | 654 Head St | replace (2) windows at frontDetails
replace (2) windows at front | $1,000 |
| May 22, 2025 | Completed final sign-off Jul 2025 | 1750 46th Av | replace (4) windows: (2) at rear, (2) at frontDetails
replace (4) windows: (2) at rear, (2) at front | $2,000 |
| Apr 15, 2025 | Completed final sign-off Jul 2025 | 1750 46th Av | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $35,000 |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 179 Victoria St | remove the back wall old sidig wood approx 4' hx 25'w) then install new one. repair in kind. not visible from street.Details
remove the back wall old sidig wood approx 4' hx 25'w) then install new one. repair in kind. not visible from street. | $4,800 |
| Jun 18, 2019 | Completed final sign-off Jul 2019 | 201 Shields St | increase valuation by 49000 to pa# 201812077750. per senior inspector correction notice.Details
increase valuation by 49000 to pa# 201812077750. per senior inspector correction notice. | $49,000 |
| Dec 11, 2018 | Completed final sign-off Jan 2019 | 631 Taraval St | revision to pa #201802211848. existing issued permit need to change occupancy class form e to i4. to remove interior door, turn existing door frome (push out), and add hardware.Details
revision to pa #201802211848. existing issued permit need to change occupancy class form e to i4. to remove interior door, turn existing door frome (push out), and add hardware. | |
| Dec 7, 2018 | Completed final sign-off Jul 2019 | 201 Shields St | remodel kitchen and 2 baths on the 2nd fl add a laundry room 2 bedrooms w full baths 1st fl replace furnaceDetails
remodel kitchen and 2 baths on the 2nd fl add a laundry room 2 bedrooms w full baths 1st fl replace furnace | $80,000 |
| Feb 21, 2018 | Completed final sign-off Sep 2018 | 631 Taraval St | ti of (e) ground fl commercial space in (e) 3-story building into day care. work includes partial demolition of (e) interior non-structural walls & interior finishes and the construction of new interior walls & interior finishes.Details
ti of (e) ground fl commercial space in (e) 3-story building into day care. work includes partial demolition of (e) interior non-structural walls & interior finishes and the construction of new interior walls & interior finishes. | $50,000 |
| Aug 25, 2015 | Completed final sign-off Feb 2017 | 4400 Pacheco St | comply with complaint 201389401; 1st flr, add 3 bedrooms, 3 full bath, 2nd flr: remodel (e) bath & add one bath, 3rd flr: remodel (e) bath, legalize one bath & add one bath per plan. add windows at side.Details
comply with complaint 201389401; 1st flr, add 3 bedrooms, 3 full bath, 2nd flr: remodel (e) bath & add one bath, 3rd flr: remodel (e) bath, legalize one bath & add one bath per plan. add windows at side. | $86,000 |
| Aug 24, 2015 | Completed final sign-off Aug 2017 | 1008 Treat Av | bathroom, kitchen remodelling; high efficacy lighting (e) exhaust to remain. n/a maher ord. 155-13Details
bathroom, kitchen remodelling; high efficacy lighting (e) exhaust to remain. n/a maher ord. 155-13 | $18,000 |
| Jul 20, 2015 | Completed final sign-off Feb 2017 | 4400 Pacheco St | one bathroom remodel. non-structural.Details
one bathroom remodel. non-structural. | $6,000 |
| Feb 23, 2015 | Completed final sign-off Sep 2016 | 555 07th Av | change cabinets, counter top, sink, faucet, floor tile in the kitchen. remodeling 2 bathrooms.Details
change cabinets, counter top, sink, faucet, floor tile in the kitchen. remodeling 2 bathrooms. | $16,000 |
| Aug 13, 2014 | Completed final sign-off Mar 2015 | 100 Sargent St | change 4 windows - face to street.Details
change 4 windows - face to street. | $4,000 |
| Aug 13, 2014 | Completed final sign-off Mar 2015 | 100 Sargent St | repair the backyard stairs less than 50%, change windows, 3 windows face the back.Details
repair the backyard stairs less than 50%, change windows, 3 windows face the back. | $3,000 |
| Jun 9, 2014 | Completed final sign-off Jun 2014 | 100 Sargent St | replace bathroom window with fibergalss sash within existing openning.Details
replace bathroom window with fibergalss sash within existing openning. | $400 |
| May 12, 2014 | Completed final sign-off Sep 2014 | 2728 Ulloa St | remodel kitchen and 2 bathrooms, add 1 bathroom, add partition wall on 2/f, add 3 bedrooms, 1 exercise room and 4 bathrooms on 1/f, new furnace and new water heater.Details
remodel kitchen and 2 bathrooms, add 1 bathroom, add partition wall on 2/f, add 3 bedrooms, 1 exercise room and 4 bathrooms on 1/f, new furnace and new water heater. | $95,000 |
| May 1, 2014 | Completed final sign-off Jun 2014 | 100 Sargent St | change cabinet & countertop in kitchen; change floor tiles in the kitchen; change vanity cabinet & tiles in the bathroom. to comply with cec150(k) 8Details
change cabinet & countertop in kitchen; change floor tiles in the kitchen; change vanity cabinet & tiles in the bathroom. to comply with cec150(k) 8 | $7,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2014 | 2875 25th St | remodeling one bathroom non structuralDetails
remodeling one bathroom non structural | $6,000 |