5 K Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Feb 2007 to Feb 2007
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2007 | Never finaled issued May 2007, no final | 486 Belvedere St | interior remodel on all 3 levels + (n) deck at rear of property on 1st floor. replace (e) aluminum with wood double-hung windows at building. replace exist gas heating system at both units with new infloor radiant system with single boiler gas.Details
interior remodel on all 3 levels + (n) deck at rear of property on 1st floor. replace (e) aluminum with wood double-hung windows at building. replace exist gas heating system at both units with new infloor radiant system with single boiler gas. | $45,000 |