4l Artistic Tile
- Based in
- Vallejo
- On San Francisco permits
- May 2024 to Feb 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2025 | In progress issued Feb 2025 | 1177 California St | convert (e) shower tub/to shower tile. remove old tiles and replace with new. no change anything, no structural touch. same locationDetails
convert (e) shower tub/to shower tile. remove old tiles and replace with new. no change anything, no structural touch. same location | $15,000 |
| May 2, 2024 | In progress issued May 2024 | 1177 California St | convert (e) shower tub/to shower tile. remove tile only -what is necessary/replace. no structural changes. no moving wallsDetails
convert (e) shower tub/to shower tile. remove tile only -what is necessary/replace. no structural changes. no moving walls | $14,500 |