38 Construction
- Based in
- Benicia
- On San Francisco permits
- Mar 2025 to Mar 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2025 | In progress issued Mar 2025 | 1333 Masonic Av | unit b: 5' x 7' bathroom remodel to include: removal and in-kind replacement of toilet, sink, faucet, tub shower w/new sink, faucet, and tile shower. floor: new tile flooring to include underfloor electric radiant heating. walls: remove plaster, wood wainscot and trim replace w/ tile board and...Details
unit b: 5' x 7' bathroom remodel to include: removal and in-kind replacement of toilet, sink, faucet, tub shower w/new sink, faucet, and tile shower. floor: new tile flooring to include underfloor electric radiant heating. walls: remove plaster, wood wainscot and trim replace w/ tile board and... | $25,000 |