360 Construction Co
- Based in
- San Jose
- On San Francisco permits
- Jan 2013 to Mar 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2013 | Completed final sign-off Jun 2014 | 575 34th Av | replace 4 windows and 1 sliding door. install new wood slsiding over (e) panel siding. some windows are facing the street. u factor mor or less .4Details
replace 4 windows and 1 sliding door. install new wood slsiding over (e) panel siding. some windows are facing the street. u factor mor or less .4 | $70,000 |
| Jan 15, 2013 | Completed final sign-off Jun 2014 | 575 34th Av | remodel (2) kitchens and (4) bathrooms (change lighting , change new plumbing fixtures new tile floor, counter tops, wall panels, hardwood floor. painting, replace interior door new cabinets, no structural work. replace 2 hood exhaust, replace 2 gas insert fireplace.Details
remodel (2) kitchens and (4) bathrooms (change lighting , change new plumbing fixtures new tile floor, counter tops, wall panels, hardwood floor. painting, replace interior door new cabinets, no structural work. replace 2 hood exhaust, replace 2 gas insert fireplace. | $130,000 |