Permit GraphShortlistSan Francisco building permits since 2000

3 D Design & Construction Inc

Contractor license
888327
State license record
Based in
San Anselmo
On San Francisco permits
Nov 2009 to May 2015
Last 24 months
0 permits filed

28 permits since 2000: 27 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 2Deck 2Stairs 2Kitchen remodel 6Bathroom remodel 8
FiledOutcomeAddressWork described on the permitDeclared cost
May 28, 2015Completed
final sign-off Dec 2016
430 El Camino Del Marenclose 48 sf of (e). roof deck @ 4th flr to create (n) powder room. approved variance, case no.214.1376v (staff contact: alexandra kirby)
Details
Permit
201505287351
Status
complete
Filed
May 28, 2015
Permit issued
Nov 24, 2015
Final sign-off
Dec 7, 2016
Declared cost
$20,000
Address
430 El Camino Del Mar

enclose 48 sf of (e). roof deck @ 4th flr to create (n) powder room. approved variance, case no.214.1376v (staff contact: alexandra kirby)

Open the permit page

$20,000
May 28, 2015Completed
final sign-off Mar 2016
430 El Camino Del Marrevision to pa 2015 0114 5695 - minor changes due to (e) site conditions
Details
Permit
201505287357
Status
complete
Filed
May 28, 2015
Final sign-off
Mar 18, 2016
Address
430 El Camino Del Mar

revision to pa 2015 0114 5695 - minor changes due to (e) site conditions

Open the permit page

Apr 30, 2015Completed
final sign-off May 2016
151 Union Stremodel accessory spaces to existing cafe. two extg storage rooms to be converted to a scullery and modified storage. includes related plumbing connection to new sinks. n/a for maher.
Details
Permit
201504304976
Status
complete
Filed
Apr 30, 2015
Permit issued
May 22, 2015
Final sign-off
May 5, 2016
Declared cost
$35,000
Address
151 Union St

remodel accessory spaces to existing cafe. two extg storage rooms to be converted to a scullery and modified storage. includes related plumbing connection to new sinks. n/a for maher.

Open the permit page

$35,000
Feb 3, 2015Completed
final sign-off May 2015
154 Lombard Stremodel 2 bathrooms, replace plumbing and electrical fixtures, & 2 vent fans, create pass-thru at kitchen to diningroom wall. install new living room cabinetry, replace (1) sliding glass door & (1) window not visible from street; maher n/a
Details
Permit
201502037374
Status
complete
Filed
Feb 3, 2015
Permit issued
Feb 3, 2015
Final sign-off
May 15, 2015
Declared cost
$54,350
Address
154 Lombard St

remodel 2 bathrooms, replace plumbing and electrical fixtures, & 2 vent fans, create pass-thru at kitchen to diningroom wall. install new living room cabinetry, replace (1) sliding glass door & (1) window not visible from street; maher n/a

Open the permit page

$54,350
Jan 26, 2015Never finaled
issued Feb 2015, no final
83 Carmel Starchitectural and structural revision to 201207245630. reduce rear deck size to accomodate stair headroom. shift rear window to center with windows above. enlarge two windows on front elevation for egress.
Details
Permit
201501266641
Status
issued
Filed
Jan 26, 2015
Permit issued
Feb 5, 2015
Declared cost
$2,250
Address
83 Carmel St

architectural and structural revision to 201207245630. reduce rear deck size to accomodate stair headroom. shift rear window to center with windows above. enlarge two windows on front elevation for egress.

Open the permit page

$2,250
Jan 14, 2015Completed
final sign-off Mar 2016
430 El Camino Del Marbuild out former storage room to create guest room. add full bathroom, add windows and modify extg windows at back. no exterior expansion. mep under seperate permit.
Details
Permit
201501145695
Status
complete
Filed
Jan 14, 2015
Permit issued
Jan 26, 2015
Final sign-off
Mar 18, 2016
Declared cost
$20,000
Address
430 El Camino Del Mar

build out former storage room to create guest room. add full bathroom, add windows and modify extg windows at back. no exterior expansion. mep under seperate permit.

Open the permit page

$20,000
May 9, 2014Completed
final sign-off Dec 2014
340 Post St3rd floor culinary center:scope includes new student work stations with new kitchen equipment in the extg culinary center and new dishwasher in the extg scullery with associated plumbing work.
Details
Permit
201405095359
Status
complete
Filed
May 9, 2014
Permit issued
Nov 14, 2014
Final sign-off
Dec 17, 2014
Declared cost
$25,000
Address
340 Post St

3rd floor culinary center:scope includes new student work stations with new kitchen equipment in the extg culinary center and new dishwasher in the extg scullery with associated plumbing work.

Open the permit page

$25,000
Aug 5, 2013Completed
final sign-off Dec 2013
150 Lombard Stunit 901j - remodel kitchen & 2 bathrooms; new hardwood flooring ; relocate elec. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitchen & bathrooms, exist bathroom exhaust fan to remain.
Details
Permit
201308053533
Status
complete
Filed
Aug 5, 2013
Permit issued
Aug 5, 2013
Final sign-off
Dec 16, 2013
Declared cost
$72,000
Address
150 Lombard St

unit 901j - remodel kitchen & 2 bathrooms; new hardwood flooring ; relocate elec. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitchen & bathrooms, exist bathroom exhaust fan to remain.

Open the permit page

$72,000
Jul 10, 2013Completed
final sign-off Sep 2013
101 Lombard Stremodel bathroom. replace bathtub with shower, install new tile, shower doors, vanity, sink, fuacet and bentilation fan. relocate light fixture location. relocate gfci location. install built in bookshelves in master bedroom and living room. install new carpet. install new countertop and mirrors.
Details
Permit
201307101452
Status
complete
Filed
Jul 10, 2013
Permit issued
Jul 10, 2013
Final sign-off
Sep 18, 2013
Declared cost
$14,800
Address
101 Lombard St

remodel bathroom. replace bathtub with shower, install new tile, shower doors, vanity, sink, fuacet and bentilation fan. relocate light fixture location. relocate gfci location. install built in bookshelves in master bedroom and living room. install new carpet. install new countertop and mirrors.

Open the permit page

$14,800
May 23, 2013Completed
final sign-off Jan 2014
2015 Chestnut Stinterior t.i to repair and restore (e) cafe that was damaged by fire. scope of work include exterior awning over new walk-in unit. mech, electrcial and plumbing work to be submitted under sep permit.
Details
Permit
201305237793
Status
complete
Filed
May 23, 2013
Permit issued
Jul 10, 2013
Final sign-off
Jan 6, 2014
Declared cost
$35,000
Address
2015 Chestnut St

interior t.i to repair and restore (e) cafe that was damaged by fire. scope of work include exterior awning over new walk-in unit. mech, electrcial and plumbing work to be submitted under sep permit.

Open the permit page

$35,000
Oct 16, 2012Completed
final sign-off Feb 2013
3250 Van Ness Avtenant improvement of accessory use of the space for test kitchen, new appliances, cabinetry, finishes & non structural partitions
Details
Permit
201210162139
Status
complete
Filed
Oct 16, 2012
Permit issued
Oct 19, 2012
Final sign-off
Feb 13, 2013
Declared cost
$425,000
Address
3250 Van Ness Av

tenant improvement of accessory use of the space for test kitchen, new appliances, cabinetry, finishes & non structural partitions

Open the permit page

$425,000
Sep 6, 2012Completed
final sign-off Mar 2013
101 Lombard Stremodel bathroom, reface kitchen cabinets, install new lighting, new counter top, refinish floors, paint, install new built in cabinets.
Details
Permit
201209069069
Status
complete
Filed
Sep 6, 2012
Permit issued
Sep 6, 2012
Final sign-off
Mar 8, 2013
Declared cost
$80,000
Address
101 Lombard St

remodel bathroom, reface kitchen cabinets, install new lighting, new counter top, refinish floors, paint, install new built in cabinets.

Open the permit page

$80,000
Aug 22, 2012Completed
final sign-off Feb 2013
3250 Van Ness Avinstallation of green wall. structural modifications to an existing walls. amendment to pa# 201207064227.
Details
Permit
201208228032
Status
complete
Filed
Aug 22, 2012
Permit issued
Aug 23, 2012
Final sign-off
Feb 13, 2013
Declared cost
$10,000
Address
3250 Van Ness Av

installation of green wall. structural modifications to an existing walls. amendment to pa# 201207064227.

Open the permit page

$10,000
Jul 30, 2012Completed
final sign-off Feb 2013
3250 Van Ness Avrevision to appl #2012.0515.0473 - installation of light weight stock shelving.
Details
Permit
201207306045
Status
complete
Filed
Jul 30, 2012
Permit issued
Aug 13, 2012
Final sign-off
Feb 7, 2013
Declared cost
$3,000
Address
3250 Van Ness Av

revision to appl #2012.0515.0473 - installation of light weight stock shelving.

Open the permit page

$3,000
Jul 24, 2012Completed
final sign-off Sep 2016
83 Carmel Sthorizontal & vertical addition on third floor. interior remodel of (e) second fl and rear bedroom extension, including a (n) rear deck @ 2nd floor level.
Details
Permit
201207245630
Status
complete
Filed
Jul 24, 2012
Permit issued
Apr 18, 2014
Final sign-off
Sep 20, 2016
Declared cost
$150,000
Address
83 Carmel St

horizontal & vertical addition on third floor. interior remodel of (e) second fl and rear bedroom extension, including a (n) rear deck @ 2nd floor level.

Open the permit page

$150,000
Jul 6, 2012Completed
final sign-off Jan 2013
120 Shrader Stmaster bathroom remodel - relocate toilet and vanity sink. remove tub and install new shower. all new finishes. no structural changes. install new forced air unit to service upstairs of sfd, in closet located in upstairs hallway.
Details
Permit
201207064280
Status
complete
Filed
Jul 6, 2012
Permit issued
Jul 6, 2012
Final sign-off
Jan 16, 2013
Declared cost
$65,000
Address
120 Shrader St

master bathroom remodel - relocate toilet and vanity sink. remove tub and install new shower. all new finishes. no structural changes. install new forced air unit to service upstairs of sfd, in closet located in upstairs hallway.

Open the permit page

$65,000
Jul 6, 2012Completed
final sign-off Oct 2013
3250 Van Ness Avtenant improvement-3rd. floor of existing office building wall removal, movable partition install, new finishes & casework. work in bay cafe only.
Details
Permit
201207064227
Status
complete
Filed
Jul 6, 2012
Permit issued
Jul 13, 2012
Final sign-off
Oct 8, 2013
Declared cost
$200,000
Address
3250 Van Ness Av

tenant improvement-3rd. floor of existing office building wall removal, movable partition install, new finishes & casework. work in bay cafe only.

Open the permit page

$200,000
Jun 27, 2012Completed
final sign-off Feb 2013
3250 Van Ness Avrevision to appl #2012.05.15.0473: new wall, adjustment of walls. sprinklers and fire alarm under separate permit
Details
Permit
201206273540
Status
complete
Filed
Jun 27, 2012
Permit issued
Jun 28, 2012
Final sign-off
Feb 13, 2013
Declared cost
$10,000
Address
3250 Van Ness Av

revision to appl #2012.05.15.0473: new wall, adjustment of walls. sprinklers and fire alarm under separate permit

Open the permit page

$10,000
May 15, 2012Completed
final sign-off Nov 2012
3250 Van Ness Av1st floor-tenant improvement-re design of office, storage & exhibit space. selective removal of walls, new non structural walls & finishes.
Details
Permit
201205150473
Status
complete
Filed
May 15, 2012
Permit issued
Jun 8, 2012
Final sign-off
Nov 30, 2012
Declared cost
$350,000
Address
3250 Van Ness Av

1st floor-tenant improvement-re design of office, storage & exhibit space. selective removal of walls, new non structural walls & finishes.

Open the permit page

$350,000
Jan 27, 2012Completed
final sign-off Jun 2012
156 02nd Stinterior non structural remodel on basement and ground floor areas
Details
Permit
201201273059
Status
complete
Filed
Jan 27, 2012
Permit issued
Feb 3, 2012
Final sign-off
Jun 6, 2012
Declared cost
$65,000
Address
156 02nd St

interior non structural remodel on basement and ground floor areas

Open the permit page

$65,000
Dec 15, 2011Completed
final sign-off Jan 2013
156 02nd Stdemolition of partitions, doors, ceilings. non structural demo only at 1st fl and basement. tenant improvement under sep permit
Details
Permit
201112150772
Status
complete
Filed
Dec 15, 2011
Permit issued
Dec 16, 2011
Final sign-off
Jan 18, 2013
Declared cost
$32,000
Address
156 02nd St

demolition of partitions, doors, ceilings. non structural demo only at 1st fl and basement. tenant improvement under sep permit

Open the permit page

$32,000
Sep 29, 2011Completed
final sign-off Feb 2013
3250 Van Ness Av3rd floor demolish (1) existing exterior wall & demo (e) planter & exterior pauers. enclose (e) ext courtyard w/eifs constr on mtl stud wall including steel roof joists, mtl roof deck w.foam roof insulation . install int partion (mtl stud wall) & exterior entry door.no mechanical work.
Details
Permit
201109295808
Status
complete
Filed
Sep 29, 2011
Permit issued
Jun 28, 2012
Final sign-off
Feb 13, 2013
Declared cost
$100,000
Address
3250 Van Ness Av

3rd floor demolish (1) existing exterior wall & demo (e) planter & exterior pauers. enclose (e) ext courtyard w/eifs constr on mtl stud wall including steel roof joists, mtl roof deck w.foam roof insulation . install int partion (mtl stud wall) & exterior entry door.no mechanical work.

Open the permit page

$100,000
Aug 23, 2011Completed
final sign-off Jun 2012
156 02nd Stinterior non structural remodel of floors 2-6 new partitions, finishes and lighting. fire alarm and mechanical work under seperate permit.
Details
Permit
201108233070
Status
complete
Filed
Aug 23, 2011
Permit issued
Sep 13, 2011
Final sign-off
Jun 11, 2012
Declared cost
$200,000
Address
156 02nd St

interior non structural remodel of floors 2-6 new partitions, finishes and lighting. fire alarm and mechanical work under seperate permit.

Open the permit page

$200,000
Sep 1, 2010Completed
final sign-off May 2011
2132 Bryant Stas-build revision per plan: "framing approval subject to revision & approval of changes to bedroom#1 @ rear of bldg. ok to insulate all areas except bed #1".revision to app #201002257117
Details
Permit
201009010033
Status
complete
Filed
Sep 1, 2010
Permit issued
Sep 2, 2010
Final sign-off
May 2, 2011
Declared cost
$1,500
Address
2132 Bryant St

as-build revision per plan: "framing approval subject to revision & approval of changes to bedroom#1 @ rear of bldg. ok to insulate all areas except bed #1".revision to app #201002257117

Open the permit page

$1,500
Feb 25, 2010Completed
final sign-off May 2011
2132 Bryant Stremodel e dwelling. reconfigure interior halls, remodel kitchen and 1 bath, 1 new bath. partial n roof framing, replacment of windows and doors, replace interior stair, reconfigure interior lightwell/court, n gas furnaces, hot water and gas fireplace insert
Details
Permit
201002257117
Status
complete
Filed
Feb 25, 2010
Permit issued
Feb 26, 2010
Final sign-off
May 2, 2011
Declared cost
$85,000
Address
2132 Bryant St

remodel e dwelling. reconfigure interior halls, remodel kitchen and 1 bath, 1 new bath. partial n roof framing, replacment of windows and doors, replace interior stair, reconfigure interior lightwell/court, n gas furnaces, hot water and gas fireplace insert

Open the permit page

$85,000
Feb 1, 2010Completed
final sign-off May 2011
2132 Bryant Strevision to pa# 2009.12.10.2963 1st floor to structural details shown as delta 1 on plans, dated jan.28.2010
Details
Permit
201002015636
Status
complete
Filed
Feb 1, 2010
Permit issued
Feb 1, 2010
Final sign-off
May 2, 2011
Declared cost
$3,500
Address
2132 Bryant St

revision to pa# 2009.12.10.2963 1st floor to structural details shown as delta 1 on plans, dated jan.28.2010

Open the permit page

$3,500
Dec 10, 2009Completed
final sign-off May 2011
2132 Bryant Stpartial remodel of existing 2 story building. scope includes tenant improvment of 1st floor only. includes replace existing light fixtures, add outlets, replace gas furnace, add ada bath,voluntary install steel rigid frames on the ground floor per plans. change use under separate permit.
Details
Permit
200912102963
Status
complete
Filed
Dec 10, 2009
Permit issued
Dec 11, 2009
Final sign-off
May 2, 2011
Declared cost
$48,500
Address
2132 Bryant St

partial remodel of existing 2 story building. scope includes tenant improvment of 1st floor only. includes replace existing light fixtures, add outlets, replace gas furnace, add ada bath,voluntary install steel rigid frames on the ground floor per plans. change use under separate permit.

Open the permit page

$48,500
Nov 2, 2009Completed
final sign-off Apr 2010
430 El Camino Del Marrepair water damaged sheetrock and flooring. remove tile decking. new waterproofing roof, reinstall shweetrock, flooring, decking, and any dryrot associated in demolition. replace existing tile deck in kind. no structural
Details
Permit
200911020362
Status
complete
Filed
Nov 2, 2009
Permit issued
Nov 2, 2009
Final sign-off
Apr 2, 2010
Declared cost
$101,800
Address
430 El Camino Del Mar

repair water damaged sheetrock and flooring. remove tile decking. new waterproofing roof, reinstall shweetrock, flooring, decking, and any dryrot associated in demolition. replace existing tile deck in kind. no structural

Open the permit page

$101,800