3 D Design & Construction
- Based in
- San Anselmo
- On San Francisco permits
- Jul 2000 to Jun 2005
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2005 | Completed final sign-off Feb 2006 | 1333 Jones St | unit#1603- remodel entire interior of unit #1603 including kitchen,bathroom #2,master bathroom.Details
unit#1603- remodel entire interior of unit #1603 including kitchen,bathroom #2,master bathroom. | $86,505 |
| May 11, 2005 | Completed final sign-off Jul 2005 | 220 Lombard St | remodel kitchen, smoke detectors.Details
remodel kitchen, smoke detectors. | $42,409 |
| Oct 14, 2004 | Completed final sign-off Jan 2005 | 101 Lombard St | remodel existing kitchen. remove existing cabinetry, appliances, soffets, & sheetrock to ran new wirDetails
remodel existing kitchen. remove existing cabinetry, appliances, soffets, & sheetrock to ran new wir | $36,083 |
| Aug 31, 2004 | Completed final sign-off Dec 2004 | 1333 Jones St | #609-remodel kitchen floor to ceiling,new lighting for entire condo,relocate (e)electrical serviceDetails
#609-remodel kitchen floor to ceiling,new lighting for entire condo,relocate (e)electrical service | $62,000 |
| Jun 9, 2004 | Completed final sign-off Oct 2004 | 658 29th Av | kitchen & bathroom remodel. replace cabinetry, plumbing & electrical fixtures, appliances, flooring,Details
kitchen & bathroom remodel. replace cabinetry, plumbing & electrical fixtures, appliances, flooring, | $62,000 |
| May 18, 2004 | Completed final sign-off Aug 2004 | 101 Lombard St | master bathroom remodel: replace bathtub, sinks, cabinetry, toilet and lightingDetails
master bathroom remodel: replace bathtub, sinks, cabinetry, toilet and lighting | $24,000 |
| Jul 9, 2003 | Completed final sign-off Aug 2003 | 120 Shrader St | add deck extension to deck in backyard, add staircase to ground level for egressDetails
add deck extension to deck in backyard, add staircase to ground level for egress | $10,600 |
| Jul 9, 2003 | Completed final sign-off Sep 2003 | 101 Lombard St | bathrm rremodel.removeshower, sink, faucet, vanity fan, lights, flooring and wallsfloor to ceiling.Details
bathrm rremodel.removeshower, sink, faucet, vanity fan, lights, flooring and wallsfloor to ceiling. | $27,426 |
| Feb 24, 2003 | Completed final sign-off Jun 2003 | 120 Shrader St | remove extng kitchen.install new kitchen;flooring,cabinetry,countertops,appliances,plumbing &Details
remove extng kitchen.install new kitchen;flooring,cabinetry,countertops,appliances,plumbing & | $76,959 |
| Feb 24, 2003 | Completed final sign-off May 2003 | 1333 Jones St | remove existing kitchen. install new kitchen, flooring, cabinetry, countertops,appliances,plumbing &Details
remove existing kitchen. install new kitchen, flooring, cabinetry, countertops,appliances,plumbing & | $37,307 |
| Oct 21, 2002 | Completed final sign-off Jan 2003 | 2120 Jefferson St | kitchen remodel, and bathrm, electricalDetails
kitchen remodel, and bathrm, electrical | $135,395 |
| Feb 28, 2002 | Completed final sign-off Jun 2002 | 1755 Filbert St | install new light fixtures and switches and outlets new flooring and fireplace inDetails
install new light fixtures and switches and outlets new flooring and fireplace in | $22,000 |
| Nov 26, 2001 | Completed final sign-off Dec 2001 | 781 University St | install new ventilation hood to (e) roof jack, install upper cabinets, patch/paint kitchenDetails
install new ventilation hood to (e) roof jack, install upper cabinets, patch/paint kitchen | $6,677 |
| Oct 17, 2001 | Completed final sign-off Mar 2002 | 52 Martha Av | kitchen remodel including electrical upgrades/plumbing upgrades and framing for skylightDetails
kitchen remodel including electrical upgrades/plumbing upgrades and framing for skylight | $44,000 |
| Aug 7, 2001 | Completed final sign-off Sep 2001 | 101 Lombard St | kchn remodel/remove and replace cabinets/counters/electrical fixtures and plmg and electricalDetails
kchn remodel/remove and replace cabinets/counters/electrical fixtures and plmg and electrical | $45,000 |
| Jul 11, 2000 | Completed final sign-off Jan 2001 | 101 Lombard St | complete remodel of interior to condo all plumb/elec to be repla/new cabinetry/partition walls relocDetails
complete remodel of interior to condo all plumb/elec to be repla/new cabinetry/partition walls reloc | $147,500 |