2 Y Construction
- Based in
- Castro Valley
- On San Francisco permits
- Mar 2015 to May 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2015 | Expired or cancelled cancelled Jan 2026 | 1016 Haight St | convert basement to habitable space by lifting house and remove & install new foundations & concrete slab.Details
convert basement to habitable space by lifting house and remove & install new foundations & concrete slab. | $98,000 |
| Mar 16, 2015 | Never finaled issued Mar 2015, no final | 1016 Haight St | kitchen remodel - demo existing kitchen, install new cabinets, new counter top, new sink, new faucet, new appliances - no rough changes. bathroom remodel - demo existing bathroom, new tile floor, new bath tub, new vanity, new toilet, new tub, new shower surround, new sink, faucet (x2), no rough chaDetails
kitchen remodel - demo existing kitchen, install new cabinets, new counter top, new sink, new faucet, new appliances - no rough changes. bathroom remodel - demo existing bathroom, new tile floor, new bath tub, new vanity, new toilet, new tub, new shower surround, new sink, faucet (x2), no rough cha | $40,000 |