Zihan Yang
- Listed as
- architect
- Firm
- Unbound Books Design Team
- On San Francisco permits
- Jan 2025 to Jul 2026
3 permits since 2000 (architect on 3 permits): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Aug 2026 | 1761 Fillmore St | Gregory Davis Construction Incgregory Da | demo only all existng floor coverings, remove all drywall on ceiling and walls up to 10" for future restaurant buildoutDetails
demo only all existng floor coverings, remove all drywall on ceiling and walls up to 10" for future restaurant buildout | $40,000 |
| Jul 8, 2026 | In progress issued Aug 2026 | 1761 Fillmore St | Gregory Davis Construction Incgregory Da | ti to renovate (e) ground level tenant space. no changes to existing building footprint, structure, area or height. reconfigure layout that will accomodate the korean noodle restaurant. kitchen remodel with (n) kitchen equipment and fixtures. (n) interior and patio millwork and finishes. remodel theDetails
ti to renovate (e) ground level tenant space. no changes to existing building footprint, structure, area or height. reconfigure layout that will accomodate the korean noodle restaurant. kitchen remodel with (n) kitchen equipment and fixtures. (n) interior and patio millwork and finishes. remodel the | $400,000 |
| Jan 6, 2025 | Completed final sign-off Feb 2026 | 38 Waverly Pl | Promodeling Inc. | prop h: reconfigure layout that will accommodate various uses including retial space and a coffee station with front counter & back kitchen, coffee equipment to support beverage program.interior millwork and finishes. electrical/plumbing systems to suport proposed design. outdoor seating.Details
prop h: reconfigure layout that will accommodate various uses including retial space and a coffee station with front counter & back kitchen, coffee equipment to support beverage program.interior millwork and finishes. electrical/plumbing systems to suport proposed design. outdoor seating. | $150,000 |