Yuk Loong Kwan
- Listed as
- engineer
- On San Francisco permits
- Sep 2020 to Sep 2020
1 permit since 2000 (engineer on 1 permit): 1 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 26, 2020 | Never finaled issued Dec 2020, no final | 1 Post St | Emcor Services/Mesa Energy Systems Inc | replace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan.Details
replace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan. | $1,400,000 |