Yaghoub Tarashandegan
- Listed as
- engineer
- Firm
- Powell & Associates Inc.
- Based in
- Benicia
- On San Francisco permits
- Dec 2017 to Sep 2025
7 permits since 2000 (engineer on 7 permits): 4 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2025 | In progress issued Mar 2026 | 1505 Quesada Av | Service Master Restoration Svcs/Sharjo | comply nov 202425674: fire damage repair: r/r damaged roofing, roof sheathing & framing; wall framing, doors, patch siding, r/r damaged drywall & insulation. test electrical. r/r plumbing, add smoke and c.o. detectors.Details
comply nov 202425674: fire damage repair: r/r damaged roofing, roof sheathing & framing; wall framing, doors, patch siding, r/r damaged drywall & insulation. test electrical. r/r plumbing, add smoke and c.o. detectors. | $500,000 |
| Nov 15, 2021 | Completed final sign-off Aug 2025 | 1555 Innes Av | Giuliani Construction Incorp | remove/replace like-for-like: damaged foundation, roof sheating/framing, ceiling joists, wall framing, windows, doors, siding, drywall, insulastion - all per plans. remove/replace damaged electrical & plumbing per plans. add smoke/monoxide detectors.Details
remove/replace like-for-like: damaged foundation, roof sheating/framing, ceiling joists, wall framing, windows, doors, siding, drywall, insulastion - all per plans. remove/replace damaged electrical & plumbing per plans. add smoke/monoxide detectors. | $120,000 |
| Oct 8, 2019 | Never finaled filed Oct 2019, never issued | 1001 Franklin St | proposed roof and walls at (e) staircaseDetails
proposed roof and walls at (e) staircase | $5,000 | |
| Feb 26, 2018 | Expired or cancelled withdrawn Jul 2018 | 1479 Shafter Av | 1-story addition kitchen & 1 new bath.Details
1-story addition kitchen & 1 new bath. | $100,000 | |
| Dec 29, 2017 | Completed final sign-off Feb 2019 | 1831 Polk St | Belfor Usa Group Inc | units 103 and 105: remove and replace sheetrock, replace windows. installation, 2x framing, remodel kitchen.Details
units 103 and 105: remove and replace sheetrock, replace windows. installation, 2x framing, remodel kitchen. | $40,000 |
| Dec 8, 2017 | Completed final sign-off Feb 2019 | 1829 Polk St | Belfor Usa Group Inc | repair to fire damage & add ada bath. remove & replace electrical, repair, upgrades, 2x framing.Details
repair to fire damage & add ada bath. remove & replace electrical, repair, upgrades, 2x framing. | $20,000 |
| Dec 8, 2017 | Completed final sign-off Feb 2019 | 1833 Polk St | Belfor Usa Group Inc | repair to fire damage & add ada bath, upgrades. remove & replace electrical, repair some 2x framing, ceiling joist, remove and replace roof framing per plan.Details
repair to fire damage & add ada bath, upgrades. remove & replace electrical, repair some 2x framing, ceiling joist, remove and replace roof framing per plan. | $20,000 |