Xiaopei Qi
- Listed as
- engineer
- Firm
- Qi Structural Engineering
- On San Francisco permits
- Oct 2018 to Sep 2026
13 permits since 2000 (engineer on 13 permits): 7 completed, 4 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 2262 30th Av | build new staircase interior to connect upper and lower levelsDetails
build new staircase interior to connect upper and lower levels | $10,000 | |
| Apr 6, 2026 | In progress filed Apr 2026, not yet issued | 748 San Bruno Av | demolish 2-story, type 5b, single family residential building.Details
demolish 2-story, type 5b, single family residential building. | $5,000 | |
| Apr 6, 2026 | In progress filed Apr 2026, not yet issued | 748 San Bruno Av | erect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423.Details
erect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423. | $1,500,000 | |
| May 29, 2024 | In progress filed May 2024, not yet issued | 3529 Mission St | Hong's General Construction Inc | to comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building.Details
to comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building. | $180,000 |
| Feb 16, 2023 | Completed final sign-off Feb 2026 | 1665 Haight St | Occidental Express | revision to pa# 202208029749, complying with complaint 20229992 & 20229994, installing support beam beneath e cracked wood built-up beam. accessibility upgrade of existing front entryDetails
revision to pa# 202208029749, complying with complaint 20229992 & 20229994, installing support beam beneath e cracked wood built-up beam. accessibility upgrade of existing front entry | $8,500 |
| Nov 29, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | 4-Mac Construction, T & R Contractors Inc, Miracle Building Maintenance | revision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall.Details
revision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall. | $75,000 |
| Nov 18, 2021 | Completed final sign-off Mar 2025 | 331 Capitol Av | Van Jones Construction | convert (e) den 1/f to family rm, add approx 72 sq. ft. walk-in closet/storage @ rear of bedrm, convert closet to laundry 1/f, create wall/doorway between new primary/(e) bedroom, add 14 sq ft to (e) bathrm 1/f, expand (e) bath 2/f into (e) closet, remodel kitchen in-kindDetails
convert (e) den 1/f to family rm, add approx 72 sq. ft. walk-in closet/storage @ rear of bedrm, convert closet to laundry 1/f, create wall/doorway between new primary/(e) bedroom, add 14 sq ft to (e) bathrm 1/f, expand (e) bath 2/f into (e) closet, remodel kitchen in-kind | $104,000 |
| Aug 11, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | 4-Mac Construction, T & R Contractors Inc, Miracle Building Maintenance, D A Construction | installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)Details
installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf) | $75,000 |
| May 28, 2021 | Never finaled filed May 2021, never issued | 1503 Dolores St | Jesus Henriquez | 1)comply with nov 20205067 debating increase size of deck. 2)no deck work second floor. 3)first floor revised, bottom 4 steps are wider and configured the same,the next 3 steps will go in a straight line versus the original turn, therefor changing in configuration.Details
1)comply with nov 20205067 debating increase size of deck. 2)no deck work second floor. 3)first floor revised, bottom 4 steps are wider and configured the same,the next 3 steps will go in a straight line versus the original turn, therefor changing in configuration. | $2,500 |
| May 11, 2021 | Completed final sign-off Jan 2022 | 92 Forest View Dr | Kmh Construction Company | revising design to (1) sliding door instead of (2) sliding doors. reference to pa #201912179813Details
revising design to (1) sliding door instead of (2) sliding doors. reference to pa #201912179813 | |
| Jul 10, 2020 | Completed final sign-off Mar 2021 | 382 21st Av | Pineda Construction Inc | 2/f -ti for dance stuio as per cua to establish a service instructional use (dba dance training center/sf) within a 6969sqft 2nd fl & mezz lvl of (e) vacant space to include new partitions walls, 4 dance studios, dressing rooms, office & lounge area. maher naDetails
2/f -ti for dance stuio as per cua to establish a service instructional use (dba dance training center/sf) within a 6969sqft 2nd fl & mezz lvl of (e) vacant space to include new partitions walls, 4 dance studios, dressing rooms, office & lounge area. maher na | $70,000 |
| Dec 17, 2019 | Completed final sign-off Jan 2022 | 92 Forest View Dr | Benjamin Builder, Kmh Construction Company | add the playroom and bathroom on 1st flDetails
add the playroom and bathroom on 1st fl | $40,000 |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 125 Marview Wy | removal of 1 partition wall and 1 bearing wall at 2nd fl. reinforcement of footings at lower fl and installation of new beam upper fl. patch walls and ceiling , paint to match interior colorsDetails
removal of 1 partition wall and 1 bearing wall at 2nd fl. reinforcement of footings at lower fl and installation of new beam upper fl. patch walls and ceiling , paint to match interior colors | $12,000 |