Wo Tang Huang
- Listed as
- authorized agent-others, contractor
- Firm
- Ht Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Aug 2026
74 permits since 2000 (contractor on 73 permits, authorized agent-others on 1 permit): 53 completed, 5 in progress, 16 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 500 Head St | Ht Construction Company | expand existing rooms down: remodel bedroom #3, relocate bath #2, provide media room, kitchenette and powder room. relocate existing laundry & furnace in garage. provide new tankless water heater in garage. no work on the upper floor. new added conditioned space 256 sq ft.Details
expand existing rooms down: remodel bedroom #3, relocate bath #2, provide media room, kitchenette and powder room. relocate existing laundry & furnace in garage. provide new tankless water heater in garage. no work on the upper floor. new added conditioned space 256 sq ft. | $100,000 |
| May 28, 2026 | In progress issued May 2026 | 50 Lupine Av | Ht Construction Company | apt 10 & 11: recommencement and completion of work approved under pa #2019-0610-2974.Details
apt 10 & 11: recommencement and completion of work approved under pa #2019-0610-2974. | $5,000 |
| May 28, 2026 | In progress issued May 2026 | 1 Wood St | Ht Construction Company | apt 2: recommencement and completion of work approved under pa #2020-0203-3393.Details
apt 2: recommencement and completion of work approved under pa #2020-0203-3393. | $600 |
| Sep 18, 2025 | In progress issued Sep 2025 | 907 Dwight St | Ht Construction Company | stucco repair in the front of house.Details
stucco repair in the front of house. | $3,000 |
| Jan 30, 2025 | In progress filed Jan 2025, not yet issued | 225 Rutland St | Ht Construction Company | re-roofing. hot works. ref #202401309412 for roof repair work.Details
re-roofing. hot works. ref #202401309412 for roof repair work. | $12,000 |
| Jan 30, 2025 | Completed final sign-off Sep 2025 | 225 Rutland St | Ht Construction Company | rewire entire house and install new subpanel, kitchen and bathroom remodel in kind on main floor, replace window at rear of house, replace central heat unit, roof vents repair.Details
rewire entire house and install new subpanel, kitchen and bathroom remodel in kind on main floor, replace window at rear of house, replace central heat unit, roof vents repair. | $60,000 |
| Jul 18, 2024 | Completed final sign-off Jan 2025 | 220 Diamond St | Ht Construction Company | replace 6 double hung wood windows in front. 2 vinyl in the back of building.Details
replace 6 double hung wood windows in front. 2 vinyl in the back of building. | $10,000 |
| Apr 4, 2024 | Completed final sign-off Jul 2025 | 2258 35th Av | Ht Construction Company | convert (e) bonus room to 1 bedroom& 1 full bathroom on 1/f.Details
convert (e) bonus room to 1 bedroom& 1 full bathroom on 1/f. | $20,000 |
| Feb 26, 2024 | Completed final sign-off Jul 2024 | 126 Ralston St | Ht Construction Company | to comply w/ nov 202031364. legalize kitcheneette at g/f. replace 4 burner stove to 2 burner cooktop wlo oven. ref to 7706452. new storage in garageDetails
to comply w/ nov 202031364. legalize kitcheneette at g/f. replace 4 burner stove to 2 burner cooktop wlo oven. ref to 7706452. new storage in garage | $12,000 |
| Sep 20, 2023 | Never finaled issued Sep 2023, no final | 372 Stratford Dr | Ht Construction Company | repair stucco around rear windows in the back / rear wall along the window.Details
repair stucco around rear windows in the back / rear wall along the window. | $2,000 |
| Aug 21, 2023 | Completed final sign-off Mar 2024 | 108 Waverly Pl | Lai Yang Construction, Ht Construction Company | interior remodel, propose to upgrade the (e) bathroom with new fixtures at same location, add one new door to access to the office, replacing the (e) water heater, replacing flooring and new paint to the interior of the 3rd fl. unitDetails
interior remodel, propose to upgrade the (e) bathroom with new fixtures at same location, add one new door to access to the office, replacing the (e) water heater, replacing flooring and new paint to the interior of the 3rd fl. unit | $17,000 |
| Aug 14, 2023 | Never finaled issued Aug 2023, no final | 44 Del Monte St | kitchen remodel in kind. upgrade electrical service to 200 amp.Details
kitchen remodel in kind. upgrade electrical service to 200 amp. | $12,000 | |
| May 19, 2023 | Completed final sign-off Aug 2023 | 1275 26th Av | Ht Construction Company | bathroom remodel in upstairs. in kind remodelDetails
bathroom remodel in upstairs. in kind remodel | $10,000 |
| Dec 7, 2022 | Completed final sign-off Feb 2024 | 243 Peabody St | Ht Construction Company | add 1 bedroom, 1 full bathroom at ground floor.Details
add 1 bedroom, 1 full bathroom at ground floor. | $35,000 |
| Nov 23, 2022 | Completed final sign-off Dec 2022 | 250 03rd Av | Ht Construction Company | to obtain final inspection for work approved under pa #202102235151. all work is complete.Details
to obtain final inspection for work approved under pa #202102235151. all work is complete. | |
| Nov 15, 2022 | Completed final sign-off Apr 2023 | 70 Lupine Av | Ht Construction Company | apt# 2 - kitchen and bathroom remodel in kind, repairs doors in kind to comply with nov 201903992Details
apt# 2 - kitchen and bathroom remodel in kind, repairs doors in kind to comply with nov 201903992 | $15,000 |
| Oct 24, 2022 | Completed final sign-off Nov 2022 | 243 Peabody St | Ht Construction Company | dry wall repair in the ground floor ceiling. approx 100 sq ft. no structural work.Details
dry wall repair in the ground floor ceiling. approx 100 sq ft. no structural work. | $600 |
| Sep 23, 2022 | Completed final sign-off Oct 2023 | 373 Rolph St | Ht Construction Company | add 1 bedroom, and 1 family room at g/f. approx 271 sq ft. replace 2 windows, one in the back and one on left side of bldg. replace existing tank water heater to tankless water heater. remodel existing bathroom at g/fDetails
add 1 bedroom, and 1 family room at g/f. approx 271 sq ft. replace 2 windows, one in the back and one on left side of bldg. replace existing tank water heater to tankless water heater. remodel existing bathroom at g/f | $50,000 |
| Sep 15, 2022 | Completed final sign-off Apr 2023 | 1150 Greenwich St | Ht Construction Company | apt 4: 1 kitchen and 1 bathroom remodelDetails
apt 4: 1 kitchen and 1 bathroom remodel | $28,000 |
| Jul 7, 2022 | Completed final sign-off Nov 2024 | 2016 Taylor St | Ht Construction Company | one kitchen and one bathroom remodel. install tankless water heater. rewire entire unit. install electrical subpanel. non structuralDetails
one kitchen and one bathroom remodel. install tankless water heater. rewire entire unit. install electrical subpanel. non structural | $35,000 |
| May 11, 2022 | Never finaled issued May 2022, no final | 250 03rd Av | Ht Construction Company | window replacement at front - 2nd floor only unit 250. (19) total.Details
window replacement at front - 2nd floor only unit 250. (19) total. | $7,000 |
| Apr 13, 2022 | Completed final sign-off May 2022 | 455 Union St | Ht Construction Company | in-kind back stair repair (25%)Details
in-kind back stair repair (25%) | $3,500 |
| Apr 4, 2022 | Completed final sign-off Oct 2022 | 1 Wood St | Ht Construction Company | (apt 4, 5, 8) kitchen and bathroom remodelDetails
(apt 4, 5, 8) kitchen and bathroom remodel | $50,000 |
| Dec 10, 2021 | Completed final sign-off May 2022 | 1525 Powell St | Ht Construction Company | 1525b powell street: remodel kitchen & bathroom. install new subpanel & rewire unit.Details
1525b powell street: remodel kitchen & bathroom. install new subpanel & rewire unit. | $25,000 |
| Nov 2, 2021 | Never finaled issued Nov 2021, no final | 135 Middlefield Dr | Ht Construction Company | one bath room remodel on 1/f, non structural.Details
one bath room remodel on 1/f, non structural. | $8,000 |
| Feb 23, 2021 | Never finaled issued Jul 2021, no final | 250 03rd Av | Ht Construction Company | remodel existing kitchen & bathroom, add 1 full bathroom. convert existing dining space to bedrooom. all work at 2nd fl. replacement of front window will be under separated permit.Details
remodel existing kitchen & bathroom, add 1 full bathroom. convert existing dining space to bedrooom. all work at 2nd fl. replacement of front window will be under separated permit. | $42,000 |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 1 Wood St | Ht Construction Company | unit # 2: partial bathroom remodel: change bathtub and tile install new electrical sub panell in the unit.Details
unit # 2: partial bathroom remodel: change bathtub and tile install new electrical sub panell in the unit. | $6,000 |
| Feb 3, 2020 | Completed final sign-off Feb 2020 | 70 Lupine Av | Ht Construction Company | repair stairs at rear of building. (less than 50%) only post.Details
repair stairs at rear of building. (less than 50%) only post. | $1,000 |
| Oct 15, 2019 | Completed final sign-off Mar 2020 | 30 Salmon St | Ht Construction Company | kitchen remodel, new electric subpanel, rewire whole unit. remodel in-kind.Details
kitchen remodel, new electric subpanel, rewire whole unit. remodel in-kind. | $18,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 135 Middlefield Dr | Ht Construction Company | replace stucco in the side wall and back wall. in kind stucco replacement.Details
replace stucco in the side wall and back wall. in kind stucco replacement. | $15,000 |
| Jun 10, 2019 | Never finaled issued Jun 2019, no final | 50 Lupine Av | Ht Construction Company | apts 10 & 11: each unit: changing the kitchen caibnets, countertop; changing bathtub and tile.Details
apts 10 & 11: each unit: changing the kitchen caibnets, countertop; changing bathtub and tile. | $18,000 |
| Mar 25, 2019 | Completed final sign-off Jun 2019 | 50 Lupine Av | Ht Construction Company | changing kitchen cabinets & counter top, bat tub & tileDetails
changing kitchen cabinets & counter top, bat tub & tile | $12,000 |
| Jan 22, 2019 | Completed final sign-off Feb 2019 | 1 Oak Park Dr | Ht Construction Company | to obtain final inspection for work approved under pa# 2015-0821-4900. all work is complete.Details
to obtain final inspection for work approved under pa# 2015-0821-4900. all work is complete. | |
| Jan 22, 2019 | Completed final sign-off Jan 2020 | 643 38th Av | Ht Construction Company | to obtain final inspection for work approved under pa# 201707262928. all work is complete.Details
to obtain final inspection for work approved under pa# 201707262928. all work is complete. | |
| Jan 22, 2019 | Completed final sign-off Jun 2019 | 1 Wood St | Ht Construction Company | apartment #11. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7).Details
apartment #11. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7). | $7,000 |
| Jan 22, 2019 | Completed final sign-off Jun 2019 | 70 Lupine Av | Ht Construction Company | apartment 6. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7).Details
apartment 6. change kitchen cabinets and counter top only (7x7). change bathtub and tiles (5x7). | $7,000 |
| Nov 13, 2018 | Completed final sign-off Mar 2019 | 1288 17th Av | Ht Construction Company | apt 4: remodel 1 kitchen & 1 bathroom. install new electrical subpanel, rewire for unit. no alteration to walls, windows and doors.Details
apt 4: remodel 1 kitchen & 1 bathroom. install new electrical subpanel, rewire for unit. no alteration to walls, windows and doors. | $18,000 |
| Sep 13, 2018 | Completed final sign-off Jan 2019 | 2022 Taylor St | Ht Construction Company | remodel kitchen & bathroom. no changes on walls.Details
remodel kitchen & bathroom. no changes on walls. | $18,000 |
| Jun 1, 2018 | Completed final sign-off Sep 2018 | 1288 17th Av | Ht Construction Company | dry rot and stucco repair in front of building. at bottom of right side bay window.Details
dry rot and stucco repair in front of building. at bottom of right side bay window. | $2,000 |
| Feb 22, 2018 | Completed final sign-off Aug 2018 | 50 Lupine Av | Ht Construction Company | apt. #4: kitchen remodel and install new electrical sub-panelDetails
apt. #4: kitchen remodel and install new electrical sub-panel | $8,000 |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 482 Lansdale Av | Ht Construction Company | replace 10 existing aluminum windows (2 at front) in-kind with new aluminum windows, same style and dimensions.Details
replace 10 existing aluminum windows (2 at front) in-kind with new aluminum windows, same style and dimensions. | $5,000 |
| Feb 22, 2018 | Completed final sign-off Sep 2018 | 2022 Taylor St | Ht Construction Company | #2024 -kitchen and bath room remodel. install new tankless water heater; # 2022 - install new tankless water heaterDetails
#2024 -kitchen and bath room remodel. install new tankless water heater; # 2022 - install new tankless water heater | $18,000 |
| Jan 5, 2018 | Completed final sign-off Sep 2018 | 1288 17th Av | Ht Construction Company | apt. #1: kitchen and bath remodel. install new electrical sub-panel and re-wiring in the apartmentDetails
apt. #1: kitchen and bath remodel. install new electrical sub-panel and re-wiring in the apartment | $17,000 |
| Oct 3, 2017 | Never finaled issued Oct 2017, no final | 2479 30th Av | Ht Construction Company | replace siding on back wall of house, remove old siding and install new entire rear of buildingDetails
replace siding on back wall of house, remove old siding and install new entire rear of building | $5,000 |
| Aug 15, 2017 | Completed final sign-off Mar 2018 | 1 Wood St | Ht Construction Company | #7 - kitchen remodelDetails
#7 - kitchen remodel | $7,000 |
| Aug 15, 2017 | Completed final sign-off Jun 2018 | 50 Lupine Av | Ht Construction Company | apt 3 - kitchen & bath remodel; apt 12 - kitchen remodelDetails
apt 3 - kitchen & bath remodel; apt 12 - kitchen remodel | $20,000 |
| Jul 26, 2017 | Completed final sign-off Jan 2020 | 643 38th Av | Ht Construction Company | project proposed an existing kitchen remodel & enlarging a lightwell facing window (not visivle form st).Details
project proposed an existing kitchen remodel & enlarging a lightwell facing window (not visivle form st). | $25,000 |
| Jul 19, 2017 | Never finaled issued Jul 2017, no final | 254 Ramsell St | Ht Construction Company | stucco repair on the side of the house.Details
stucco repair on the side of the house. | $2,000 |
| Jul 17, 2017 | Completed final sign-off Mar 2018 | 1 Wood St | Ht Construction Company | unit #6: kitchen remodel and electrical subpanel.Details
unit #6: kitchen remodel and electrical subpanel. | $8,000 |
| Jul 17, 2017 | Completed final sign-off Dec 2017 | 2775 34th Av | Ht Construction Company | stucco repair on front/driveway side of building, visible to the street about 300 sf.Details
stucco repair on front/driveway side of building, visible to the street about 300 sf. | $3,000 |
| Jul 5, 2017 | Never finaled issued Jul 2017, no final | 1722 17th Av | Ht Construction Company | kitchen remodel, add (n) electrical subpanel.Details
kitchen remodel, add (n) electrical subpanel. | $16,000 |
| Jun 23, 2017 | Completed final sign-off Feb 2019 | 1 Oak Park Dr | Ht Construction Company | to obtain a final inspection for work approved under pa#201508214900. all work is complete.Details
to obtain a final inspection for work approved under pa#201508214900. all work is complete. | |
| Feb 13, 2017 | Completed final sign-off Feb 2018 | 270 Ramsell St | Ht Construction Company | reroofing.Details
reroofing. | $2,000 |
| Feb 10, 2017 | Completed final sign-off Apr 2017 | 3354 Sacramento St | Ht Construction Company | replace window in the front of building with aluminum windows in second floor in kind. same size, same location. u-factor less than .40Details
replace window in the front of building with aluminum windows in second floor in kind. same size, same location. u-factor less than .40 | $2,500 |
| Jan 26, 2017 | Completed final sign-off May 2017 | 3354 Sacramento St | Ht Construction Company | repair a part of the stcco located on the front facade approx 50 sf in kind.Details
repair a part of the stcco located on the front facade approx 50 sf in kind. | $1,800 |
| Jan 26, 2017 | Completed final sign-off Aug 2017 | 70 Lupine Av | Ht Construction Company | apt #1 #3 remodel kitchen - new sink, new cabinets, new tile floor, like for like.Details
apt #1 #3 remodel kitchen - new sink, new cabinets, new tile floor, like for like. | $24,000 |
| Nov 7, 2016 | Completed final sign-off Mar 2017 | 1282 34th Av | Ht Construction Company | remodel bathroom.Details
remodel bathroom. | $14,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2018 | 270 Ramsell St | Ht Construction Company | expand/remodel (e) bathroom by infilling (e) lightwell at the 2nd flr. modify (e) front facade.Details
expand/remodel (e) bathroom by infilling (e) lightwell at the 2nd flr. modify (e) front facade. | $17,800 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 465 17th Av | Ht Construction Company | dryrot repair at rear of building. repair damanged rear stairs (ext). in-kind less than 50%.Details
dryrot repair at rear of building. repair damanged rear stairs (ext). in-kind less than 50%. | $4,000 |
| Jun 20, 2016 | Completed final sign-off Oct 2016 | 50 Lupine Av | Ht Construction Company | unit# 8 remodel kitchen & install new sub panel.Details
unit# 8 remodel kitchen & install new sub panel. | $16,000 |
| Jun 20, 2016 | Completed final sign-off Oct 2016 | 1 Wool St | Ht Construction Company | unit#12 remodel kitchen & install new sub panel.Details
unit#12 remodel kitchen & install new sub panel. | $16,000 |
| Jun 2, 2016 | Completed final sign-off Feb 2019 | 1 Oak Park Dr | Ht Construction Company | revision to app#201508214900 to change window design.Details
revision to app#201508214900 to change window design. | |
| Apr 25, 2016 | Completed final sign-off Jul 2016 | 1026 Montgomery St | Ht Construction Company | remodel kitchen and bathroom install new subpanel, light in hall way.Details
remodel kitchen and bathroom install new subpanel, light in hall way. | $25,000 |
| Mar 1, 2016 | Completed final sign-off May 2026 | 50 Lupine Av | Ht Construction Company | apt #1: rev. pa#201510230682 - remodel (e) 1 bathroom in-kind.Details
apt #1: rev. pa#201510230682 - remodel (e) 1 bathroom in-kind. | $6,000 |
| Feb 10, 2016 | Completed final sign-off Feb 2019 | 1 Oak Park Dr | Ht Construction Company | revision to pa #201508214900: reframe partial ceiling joists at top story living room area.Details
revision to pa #201508214900: reframe partial ceiling joists at top story living room area. | $3,000 |
| Oct 23, 2015 | Completed final sign-off May 2016 | 50 Lupine Av | Ht Construction Company | unit #1: remodel kitchen: new cabinets, sink, tile floor.Details
unit #1: remodel kitchen: new cabinets, sink, tile floor. | $12,000 |
| Aug 21, 2015 | Never finaled issued Dec 2015, no final | 1 Oak Park Dr | Ht Construction Company | (e) 2nd flr: replace windows, remodel kitchen & 2 bathrooms, stair replacement, (n) skylight. (e) grnd flr: (n) bathroom, (n) office, (n) bedroom, (n) family room w/kitchenette, (n) window @ office. garage door replacement, (n) sliding glass door replacement.Details
(e) 2nd flr: replace windows, remodel kitchen & 2 bathrooms, stair replacement, (n) skylight. (e) grnd flr: (n) bathroom, (n) office, (n) bedroom, (n) family room w/kitchenette, (n) window @ office. garage door replacement, (n) sliding glass door replacement. | $85,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2015 | 176 Seal Rock Dr | Ht Construction Company | remove existing stucco; replace rotted wood and restucco. about 40% facade. work near windows and garage door. no work to decorative stucco at sides of bay.Details
remove existing stucco; replace rotted wood and restucco. about 40% facade. work near windows and garage door. no work to decorative stucco at sides of bay. | $10,000 |
| Jun 24, 2015 | Never finaled issued Jun 2015, no final | 3008 Geary Bl | Ht Construction Company | install new interior concrete slabDetails
install new interior concrete slab | $30,000 |
| May 11, 2015 | Completed final sign-off Oct 2015 | 1426 Ortega St | Ht Construction Company | bathroom remodel, same configuration, no structural work.Details
bathroom remodel, same configuration, no structural work. | $7,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 914 Union St | Ht Construction Company | remodel bathroom, tile floor, new sink & faucet, install new water heater, install granite counter top & faucet in (e). no walls moved, removed or added, all layouts to remain unchanged.Details
remodel bathroom, tile floor, new sink & faucet, install new water heater, install granite counter top & faucet in (e). no walls moved, removed or added, all layouts to remain unchanged. | $3,000 |
| Apr 23, 2015 | Never finaled issued Apr 2015, no final | 1271 14th Av | Ht Construction Company | repair rear stairs, approx. 40%, in-kind.Details
repair rear stairs, approx. 40%, in-kind. | $2,500 |
| Mar 23, 2015 | Completed final sign-off Jul 2015 | 302 23rd Av | Ht Construction Company | remodel kitchen and (2) bathrooms, no walls to be moved/no structural work , finishes and fixtures only.Details
remodel kitchen and (2) bathrooms, no walls to be moved/no structural work , finishes and fixtures only. | $25,000 |
| Feb 12, 2015 | Completed final sign-off Apr 2015 | 324 Balboa St | Ht Construction Company | to comply with nov #201516971 dated 1/13/2015: repair (e)furnace and water heater hazardous wiring and around furnace. repair fireproofing at ceilings and walls at utility closet. repair combustion air ventilation & bathroom wentilation. repair wiring & receptacle at kitchen.Details
to comply with nov #201516971 dated 1/13/2015: repair (e)furnace and water heater hazardous wiring and around furnace. repair fireproofing at ceilings and walls at utility closet. repair combustion air ventilation & bathroom wentilation. repair wiring & receptacle at kitchen. | $2,000 |