William Ayers
- Listed as
- engineer
- On San Francisco permits
- Sep 2026 to Sep 2026
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 44 Treasure Island Rd | the project will consist of new utility connection equipment pads, switchboard, meter, excavation and replacement of paving and landscaping.treasure island ferry electrification project will provide a new electrical service that will interconnect the electrical utility service on treasure island toDetails
the project will consist of new utility connection equipment pads, switchboard, meter, excavation and replacement of paving and landscaping.treasure island ferry electrification project will provide a new electrical service that will interconnect the electrical utility service on treasure island to | $2,500,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 44 Treasure Island Rd | treasure island ferry electrification project provide (n) electrical service interconnecting electrical utility service on treasure island to provide electrical feeds to connect to the float points of connection which will in turn provide power to float equipment that will charge future electric...Details
treasure island ferry electrification project provide (n) electrical service interconnecting electrical utility service on treasure island to provide electrical feeds to connect to the float points of connection which will in turn provide power to float equipment that will charge future electric... | $5,000,000 |