W. Scott Fay
- Listed as
- architect
- Firm
- Rsp Architects
- Based in
- Minneapolis
- On San Francisco permits
- Mar 2022 to Apr 2025
4 permits since 2000 (architect on 4 permits): 2 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 8, 2025 | Completed final sign-off May 2025 | 3471 California St | Evans & Son Inc | interior demolition per plan. remodeled by others. decommissioning of existing u.s. bank t.i. space. occupancy is business group b and is unchanged.Details
interior demolition per plan. remodeled by others. decommissioning of existing u.s. bank t.i. space. occupancy is business group b and is unchanged. | $30,000 |
| Apr 2, 2025 | Completed final sign-off Dec 2025 | 2690 Mission St | Merchco Services Inc | expand (e) pharmacy into (e) pharmacy waiting alcove. wall off the pharmacy waiting area, resetting the (e) pharmacy entrance door and ada upgrades.Details
expand (e) pharmacy into (e) pharmacy waiting alcove. wall off the pharmacy waiting area, resetting the (e) pharmacy entrance door and ada upgrades. | $42,974 |
| Apr 4, 2022 | Never finaled issued Jul 2022, no final | 3601 California St | Beam Team Construction Inc | alteration to the existing pharmacy space within 3601 california st. no exterior work, all work within existing bldg shell. new work includes: interior partitions, millwork, mep work and flooring. no change in occupacy or use. no structural work.Details
alteration to the existing pharmacy space within 3601 california st. no exterior work, all work within existing bldg shell. new work includes: interior partitions, millwork, mep work and flooring. no change in occupacy or use. no structural work. | $30,965 |
| Mar 17, 2022 | Never finaled issued Jul 2022, no final | 965 Geneva Av | Beam Team Construction Inc | all new work shall consist of interior partitions, millwork, electrical work, mechanical, plumbing and flooring defined within the documentation and with adherence to the construction documents and specification. the reconfiguration of the space will not cause a change to the occupancy type unlessDetails
all new work shall consist of interior partitions, millwork, electrical work, mechanical, plumbing and flooring defined within the documentation and with adherence to the construction documents and specification. the reconfiguration of the space will not cause a change to the occupancy type unless | $59,949 |